Health Network of the BEMPOSTA-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem (Q3389385): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
Gesundheitsnetz des Bemposta-OLIVEIRA-PINESS OF AZEMIES – Good Pine Subsystem
Property / summary
 
Ziel dieses Vorhabens ist die Errichtung des Kanalisationsnetzes von Restgewässern an Orten, die noch nicht bedient werden, nämlich in der Pfarrei Pinheiro da Bemposta, einschließlich des Baus eines WWTP, das das gesammelte Abwasser behandeln wird. Die Durchführung des Vorhabens ermöglicht die Ankunft weiterer 2 093 Einwohner, was zu einer Erhöhung der Deckungsrate in Höhe von 3,1 % in der Gemeinde insgesamt führt. (German)
Property / summary: Ziel dieses Vorhabens ist die Errichtung des Kanalisationsnetzes von Restgewässern an Orten, die noch nicht bedient werden, nämlich in der Pfarrei Pinheiro da Bemposta, einschließlich des Baus eines WWTP, das das gesammelte Abwasser behandeln wird. Die Durchführung des Vorhabens ermöglicht die Ankunft weiterer 2 093 Einwohner, was zu einer Erhöhung der Deckungsrate in Höhe von 3,1 % in der Gemeinde insgesamt führt. (German) / rank
 
Normal rank
Property / summary: Ziel dieses Vorhabens ist die Errichtung des Kanalisationsnetzes von Restgewässern an Orten, die noch nicht bedient werden, nämlich in der Pfarrei Pinheiro da Bemposta, einschließlich des Baus eines WWTP, das das gesammelte Abwasser behandeln wird. Die Durchführung des Vorhabens ermöglicht die Ankunft weiterer 2 093 Einwohner, was zu einer Erhöhung der Deckungsrate in Höhe von 3,1 % in der Gemeinde insgesamt führt. (German) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:16, 16 December 2021

Project Q3389385 in Portugal
Language Label Description Also known as
English
Health Network of the BEMPOSTA-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem
Project Q3389385 in Portugal

    Statements

    0 references
    1,600,000.0 Euro
    0 references
    2,147,843.0 Euro
    0 references
    74.49 percent
    0 references
    30 June 2021
    0 references
    29 June 2023
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references
    0 references
    Esta operação visa a instalação da rede de drenagem de águas residuais em localidades ainda não servidas, nomeadamente na Freguesia de Pinheiro da Bemposta, incluindo a construção de uma ETAR que tratará o efluente recolhido.A concretização da operação permitirá chegar a mais 2 093 habitantes, o que se traduz num aumento de taxa de cobertura na ordem dos 3,1% no conjunto do concelho. (Portuguese)
    0 references
    This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole. (English)
    29 November 2021
    0 references
    Cette opération vise l’installation du réseau de drainage des eaux résiduelles dans des endroits non encore desservis, à savoir dans la paroisse de Pinheiro da Bemposta, y compris la construction d’une station d’épuration qui traitera les effluents collectés. La réalisation de l’opération permet l’arrivée de 2 093 habitants supplémentaires, ce qui se traduit par une augmentation du taux de couverture de l’ordre de 3,1 % dans l’ensemble de la commune. (French)
    7 December 2021
    0 references
    Ziel dieses Vorhabens ist die Errichtung des Kanalisationsnetzes von Restgewässern an Orten, die noch nicht bedient werden, nämlich in der Pfarrei Pinheiro da Bemposta, einschließlich des Baus eines WWTP, das das gesammelte Abwasser behandeln wird. Die Durchführung des Vorhabens ermöglicht die Ankunft weiterer 2 093 Einwohner, was zu einer Erhöhung der Deckungsrate in Höhe von 3,1 % in der Gemeinde insgesamt führt. (German)
    16 December 2021
    0 references
    Oliveira de Azeméis, Área Metropolitana do Porto, Norte
    0 references

    Identifiers

    POSEUR-03-2012-FC-001454