(10360.14072017.115000205) (Q2057089): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
(10360.14072017.115000205) PONTEBUGGIANESE_PLESSODONMILANI
Property / summary
 
LE TRAVAIL EN QUESTION CONCERNE L’EFFICACITÉ ÉNERGÉTIQUE DE L’ÉCOLE PRIMAIRE RODARI, ÉCOLE SECONDAIRE DE PREMIER NIVEAU DU PÈRE CECCHI, QUI FAIT PARTIE DE L’INSTITUT GÉNÉRAL DON MILANI, VIA TOSCANINI 11. LE PLEXUS COMPREND DEUX BÂTIMENTS SCOLAIRES, CONSTRUITS À DES ÉPOQUES DIFFÉRENTES, UNE SALLE DE SPORT ET UNE BIBLIOTHÈQUE RÉCEMMENT CONSTRUITE, AVEC AU PREMIER ÉTAGE LES SALLES DE CLASSE DE L’ELEMENTARE SCHOOL.L’INTERVENTION D’ISOLATION THERMIQUE DES STRUCTURES CONCERNE LA TOITURE DU BÂTIMENT DESTINÉ AU PÈRE DE L’ÉCOLE SECONDAIRE DE PREMIÈRE ANNÉE CECCHI. UNE TELLE INTERVENTION? NÉCESSAIRE COMPTE TENU DE LA PRÉCARITÉ? DE LA STRUCTURE, ÉGALEMENT TROUVÉ DANS L’ÉCOLE PRIMAIRE G. RODARI, OÙ IL Y A QUELQUES DÉTACHEMENTS DU PLÂTRE DU SOUS-SOL. IL EST PRÉVU D’ENLEVER LA COUVERTURE ACTUELLE ET LA COUCHE D’ÉTANCHÉITÉ, LEUR REMAKE, LA POSE DE CANAUX ET DE CHOCS, LA PEINTURE DE L’ENCHEVÊTREMENT. L’ISOLATION THERMIQUE SERA EPS 14 CM DE TYPE STIFERITE GT.L? INTERVENTION POUR REMPLACER LES LUMINAIRES (French)
Property / summary: LE TRAVAIL EN QUESTION CONCERNE L’EFFICACITÉ ÉNERGÉTIQUE DE L’ÉCOLE PRIMAIRE RODARI, ÉCOLE SECONDAIRE DE PREMIER NIVEAU DU PÈRE CECCHI, QUI FAIT PARTIE DE L’INSTITUT GÉNÉRAL DON MILANI, VIA TOSCANINI 11. LE PLEXUS COMPREND DEUX BÂTIMENTS SCOLAIRES, CONSTRUITS À DES ÉPOQUES DIFFÉRENTES, UNE SALLE DE SPORT ET UNE BIBLIOTHÈQUE RÉCEMMENT CONSTRUITE, AVEC AU PREMIER ÉTAGE LES SALLES DE CLASSE DE L’ELEMENTARE SCHOOL.L’INTERVENTION D’ISOLATION THERMIQUE DES STRUCTURES CONCERNE LA TOITURE DU BÂTIMENT DESTINÉ AU PÈRE DE L’ÉCOLE SECONDAIRE DE PREMIÈRE ANNÉE CECCHI. UNE TELLE INTERVENTION? NÉCESSAIRE COMPTE TENU DE LA PRÉCARITÉ? DE LA STRUCTURE, ÉGALEMENT TROUVÉ DANS L’ÉCOLE PRIMAIRE G. RODARI, OÙ IL Y A QUELQUES DÉTACHEMENTS DU PLÂTRE DU SOUS-SOL. IL EST PRÉVU D’ENLEVER LA COUVERTURE ACTUELLE ET LA COUCHE D’ÉTANCHÉITÉ, LEUR REMAKE, LA POSE DE CANAUX ET DE CHOCS, LA PEINTURE DE L’ENCHEVÊTREMENT. L’ISOLATION THERMIQUE SERA EPS 14 CM DE TYPE STIFERITE GT.L? INTERVENTION POUR REMPLACER LES LUMINAIRES (French) / rank
 
Normal rank
Property / summary: LE TRAVAIL EN QUESTION CONCERNE L’EFFICACITÉ ÉNERGÉTIQUE DE L’ÉCOLE PRIMAIRE RODARI, ÉCOLE SECONDAIRE DE PREMIER NIVEAU DU PÈRE CECCHI, QUI FAIT PARTIE DE L’INSTITUT GÉNÉRAL DON MILANI, VIA TOSCANINI 11. LE PLEXUS COMPREND DEUX BÂTIMENTS SCOLAIRES, CONSTRUITS À DES ÉPOQUES DIFFÉRENTES, UNE SALLE DE SPORT ET UNE BIBLIOTHÈQUE RÉCEMMENT CONSTRUITE, AVEC AU PREMIER ÉTAGE LES SALLES DE CLASSE DE L’ELEMENTARE SCHOOL.L’INTERVENTION D’ISOLATION THERMIQUE DES STRUCTURES CONCERNE LA TOITURE DU BÂTIMENT DESTINÉ AU PÈRE DE L’ÉCOLE SECONDAIRE DE PREMIÈRE ANNÉE CECCHI. UNE TELLE INTERVENTION? NÉCESSAIRE COMPTE TENU DE LA PRÉCARITÉ? DE LA STRUCTURE, ÉGALEMENT TROUVÉ DANS L’ÉCOLE PRIMAIRE G. RODARI, OÙ IL Y A QUELQUES DÉTACHEMENTS DU PLÂTRE DU SOUS-SOL. IL EST PRÉVU D’ENLEVER LA COUVERTURE ACTUELLE ET LA COUCHE D’ÉTANCHÉITÉ, LEUR REMAKE, LA POSE DE CANAUX ET DE CHOCS, LA PEINTURE DE L’ENCHEVÊTREMENT. L’ISOLATION THERMIQUE SERA EPS 14 CM DE TYPE STIFERITE GT.L? INTERVENTION POUR REMPLACER LES LUMINAIRES (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:17, 16 December 2021

Project Q2057089 in Italy
Language Label Description Also known as
English
(10360.14072017.115000205)
Project Q2057089 in Italy

    Statements

    0 references
    582,186.91 Euro
    0 references
    1,455,467.28 Euro
    0 references
    40.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI PONTE BUGGIANESE
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    I LAVORI IN OGGETTO INTERESSANO L'EFFICIENTAMENTO ENERGETICO DELLA SCUOLA PRIMARIA RODARI, SCUOLA SECONDARIA DI PRIMO GRADO PADRE CECCHI, FACENTI PARTE DELL?ISTITUTO COMPRENSIVO DON MILANI, IN VIA TOSCANINI 11. IL PLESSO COMPRENDE DUE EDIFICI SCOLASTICI, COSTRUITI IN EPOCHE DIVERSE, UNA PALESTRA ED UNA BIBLIOTECA DI RECENTE COSTRUZIONE, CON AL PIANO PRIMO DELLA MEDESIMA LE AULE DELLA SCUOLA ELEMENTARE.L?INTERVENTO DI ISOLAMENTO TERMICO DELLE STRUTTURE RIGUARDA LA COPERTURA DELL?EDIFICIO DESTINATO A SCUOLA SECONDARIA DI PRIMO GRADO PADRE CECCHI. TALE INTERVENTO ? NECESSARIO VISTA LA PRECARIET? DELLA STRUTTURA, RISCONTRATA ANCHE NELLA SCUOLA PRIMARIA G. RODARI, DOVE CI SONO ALCUNI DISTACCAMENTI DELL?INTONACO DELL?INTRADOSSO. SI PREVEDE LA RIMOZIONE DELL?ATTUALE COPERTURA E DEL MANTO DI IMPERMEABILIZZAZIONE, IL LORO RIFACIMENTO, LA POSA DI CANALI E SCOSSALINE, LA TINTEGGIATURA DELL?INTRADOSSO. L?ISOLANTE TERMICO SARA` EPS 14 CM TIPO STIFERITE GT.L?INTERVENTO DI SOSTITUZIONE DEGLI INFISSI (Italian)
    0 references
    THIS WORK RELATES TO THE ENERGY EFFICIENCY OF THE PRIMARY SCHOOL RODARI, SECONDARY SCHOOL AT FIRST INSTANCE, THE FATHER CECCHI, WHICH IS PART OF THE INSTITUTE COMPRISING DON MILANI, IN VIA TOSCANINI 11. THE PLAN COMPRISES TWO SCHOOL BUILDINGS, BUILT IN VARIOUS TIMES, A GYM AND A NEWLY BUILT LIBRARY, WITH THE FIRST FLOOR OF THE SCHOOL, THE CLASSROOMS OF THE ELEAMENTARE.L? INTERVENTION OF THERMAL INSULATION OF THE STRUCTURES CONCERNS THE COVER OF THE FIRST SECONDARY SCHOOL BUILDING, THE FATHER CECCHI. DO YOU REALLY WANT TO DO THIS? IS IT NECESSARY IN VIEW OF THE PRESCARET? OF THE STRUCTURE, ALSO FOUND IN THE PRIMARY SCHOOL G. RODARI, WHERE THERE ARE SOME SECONDMENTS OF THE RENDERING? INTRADOSO. THE REMOVAL OF THE CURRENT COVER AND THE SURFACE OF THE WATERPROOFING, THE RESTORATION OF THE CHANNELS AND THE SALTPANS, THE PAINTING OF THE INTRADOSO IS EXPECTED TO BE REMOVED. THE THERMAL INSULATION WILL BE EPS 14 CM (English)
    0 references
    LE TRAVAIL EN QUESTION CONCERNE L’EFFICACITÉ ÉNERGÉTIQUE DE L’ÉCOLE PRIMAIRE RODARI, ÉCOLE SECONDAIRE DE PREMIER NIVEAU DU PÈRE CECCHI, QUI FAIT PARTIE DE L’INSTITUT GÉNÉRAL DON MILANI, VIA TOSCANINI 11. LE PLEXUS COMPREND DEUX BÂTIMENTS SCOLAIRES, CONSTRUITS À DES ÉPOQUES DIFFÉRENTES, UNE SALLE DE SPORT ET UNE BIBLIOTHÈQUE RÉCEMMENT CONSTRUITE, AVEC AU PREMIER ÉTAGE LES SALLES DE CLASSE DE L’ELEMENTARE SCHOOL.L’INTERVENTION D’ISOLATION THERMIQUE DES STRUCTURES CONCERNE LA TOITURE DU BÂTIMENT DESTINÉ AU PÈRE DE L’ÉCOLE SECONDAIRE DE PREMIÈRE ANNÉE CECCHI. UNE TELLE INTERVENTION? NÉCESSAIRE COMPTE TENU DE LA PRÉCARITÉ? DE LA STRUCTURE, ÉGALEMENT TROUVÉ DANS L’ÉCOLE PRIMAIRE G. RODARI, OÙ IL Y A QUELQUES DÉTACHEMENTS DU PLÂTRE DU SOUS-SOL. IL EST PRÉVU D’ENLEVER LA COUVERTURE ACTUELLE ET LA COUCHE D’ÉTANCHÉITÉ, LEUR REMAKE, LA POSE DE CANAUX ET DE CHOCS, LA PEINTURE DE L’ENCHEVÊTREMENT. L’ISOLATION THERMIQUE SERA EPS 14 CM DE TYPE STIFERITE GT.L? INTERVENTION POUR REMPLACER LES LUMINAIRES (French)
    16 December 2021
    0 references

    Identifiers