(10360.14072017.115000104) PRIMARY SCHOOL OF VIA MAZZINI (Q2057015): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
(10360.14072017.115000104) ÉCOLE PRIMAIRE DANS VIA MAZZINI
Property / summary
 
LE PROJET CONCERNE UN SEUL BÂTIMENT ET IMPLIQUE LA RÉALISATION DE 2 LOTS FONCTIONNELS. AU 1ST? LE LOT CONCERNE LA RÉNOVATION DE LA CENTRALE ÉLECTRIQUE. LES INTERVENTIONS À RÉALISER CONCERNENT PRINCIPALEMENT LE REMPLACEMENT DE LA CHAUDIÈRE ACTUELLE DE BASE DE GAZ PAR UN GÉNÉRATEUR THERMIQUE À CONDENSATION, L’INSTALLATION EXTERNE D’UNE POMPE À CHALEUR AIR/EAU EN INTÉGRATION ET UN CHAMP PHOTOVOLTAÏQUE SUR LE TOIT DE LA SALLE DE GYM. L’USINE SAR? ÉQUIPÉ D’UN DÉMINÉRALISATEUR SUR LA RÉINTÉGRATION À LA CHAUDIÈRE ET D’UN DOSEUR DE POLYPHOSPHATE SUR LA RÉINTÉGRATION DU CIRCUIT SECONDAIRE POUR ASSURER UNE PLUS LONGUE DURÉE DE VIE DES COMPOSANTS HYDRAULIQUES. C’EST SAR? ÉGALEMENT INSTALLÉ UN ÉCHANGEUR DE CHALEUR À PLAQUES POUR DIVISER LE CIRCUIT DE PRODUCTION DE CHALEUR PRIMAIRE AVEC LE SECONDAIRE EXISTANT. L’USINE DE GAZ INTERNE LE SERA? MODIFIÉ POUR ÊTRE ADAPTÉ À LA CONNEXION AVEC LE NOUVEAU GÉNÉRATEUR DE CHALEUR. LE CHANGEMENT À CE SUJET? AUSSI LE CONDUIT DE FUMÉE. QU’EST-CE QUE C’EST QUE LA SAR? MOULÉ POUR RECONNECTER LE C (French)
Property / summary: LE PROJET CONCERNE UN SEUL BÂTIMENT ET IMPLIQUE LA RÉALISATION DE 2 LOTS FONCTIONNELS. AU 1ST? LE LOT CONCERNE LA RÉNOVATION DE LA CENTRALE ÉLECTRIQUE. LES INTERVENTIONS À RÉALISER CONCERNENT PRINCIPALEMENT LE REMPLACEMENT DE LA CHAUDIÈRE ACTUELLE DE BASE DE GAZ PAR UN GÉNÉRATEUR THERMIQUE À CONDENSATION, L’INSTALLATION EXTERNE D’UNE POMPE À CHALEUR AIR/EAU EN INTÉGRATION ET UN CHAMP PHOTOVOLTAÏQUE SUR LE TOIT DE LA SALLE DE GYM. L’USINE SAR? ÉQUIPÉ D’UN DÉMINÉRALISATEUR SUR LA RÉINTÉGRATION À LA CHAUDIÈRE ET D’UN DOSEUR DE POLYPHOSPHATE SUR LA RÉINTÉGRATION DU CIRCUIT SECONDAIRE POUR ASSURER UNE PLUS LONGUE DURÉE DE VIE DES COMPOSANTS HYDRAULIQUES. C’EST SAR? ÉGALEMENT INSTALLÉ UN ÉCHANGEUR DE CHALEUR À PLAQUES POUR DIVISER LE CIRCUIT DE PRODUCTION DE CHALEUR PRIMAIRE AVEC LE SECONDAIRE EXISTANT. L’USINE DE GAZ INTERNE LE SERA? MODIFIÉ POUR ÊTRE ADAPTÉ À LA CONNEXION AVEC LE NOUVEAU GÉNÉRATEUR DE CHALEUR. LE CHANGEMENT À CE SUJET? AUSSI LE CONDUIT DE FUMÉE. QU’EST-CE QUE C’EST QUE LA SAR? MOULÉ POUR RECONNECTER LE C (French) / rank
 
Normal rank
Property / summary: LE PROJET CONCERNE UN SEUL BÂTIMENT ET IMPLIQUE LA RÉALISATION DE 2 LOTS FONCTIONNELS. AU 1ST? LE LOT CONCERNE LA RÉNOVATION DE LA CENTRALE ÉLECTRIQUE. LES INTERVENTIONS À RÉALISER CONCERNENT PRINCIPALEMENT LE REMPLACEMENT DE LA CHAUDIÈRE ACTUELLE DE BASE DE GAZ PAR UN GÉNÉRATEUR THERMIQUE À CONDENSATION, L’INSTALLATION EXTERNE D’UNE POMPE À CHALEUR AIR/EAU EN INTÉGRATION ET UN CHAMP PHOTOVOLTAÏQUE SUR LE TOIT DE LA SALLE DE GYM. L’USINE SAR? ÉQUIPÉ D’UN DÉMINÉRALISATEUR SUR LA RÉINTÉGRATION À LA CHAUDIÈRE ET D’UN DOSEUR DE POLYPHOSPHATE SUR LA RÉINTÉGRATION DU CIRCUIT SECONDAIRE POUR ASSURER UNE PLUS LONGUE DURÉE DE VIE DES COMPOSANTS HYDRAULIQUES. C’EST SAR? ÉGALEMENT INSTALLÉ UN ÉCHANGEUR DE CHALEUR À PLAQUES POUR DIVISER LE CIRCUIT DE PRODUCTION DE CHALEUR PRIMAIRE AVEC LE SECONDAIRE EXISTANT. L’USINE DE GAZ INTERNE LE SERA? MODIFIÉ POUR ÊTRE ADAPTÉ À LA CONNEXION AVEC LE NOUVEAU GÉNÉRATEUR DE CHALEUR. LE CHANGEMENT À CE SUJET? AUSSI LE CONDUIT DE FUMÉE. QU’EST-CE QUE C’EST QUE LA SAR? MOULÉ POUR RECONNECTER LE C (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:15, 16 December 2021

Project Q2057015 in Italy
Language Label Description Also known as
English
(10360.14072017.115000104) PRIMARY SCHOOL OF VIA MAZZINI
Project Q2057015 in Italy

    Statements

    0 references
    137,282.81 Euro
    0 references
    356,578.72 Euro
    0 references
    38.5 percent
    0 references
    31 July 2017
    0 references
    29 March 2020
    0 references
    30 April 2020
    0 references
    COMUNE DI TORRITA DI SIENA
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO RIGUARDA UN UNICO EDIFICIO E PREVEDE LA REALIZZAZIONE DI N?2 LOTTI FUNZIONALI. IL 1? LOTTO RIGUARDA LA RISTRUTTURAZIONE DELLA CENTRALE TERMICA. GLI INTERVENTI DA ESEGUIRE RIGUARDANO PRINCIPALMENTE LA SOSTITUZIONE DELL?ATTUALE CALDAIA A BASAMENTO A GAS CON UN GENERATORE TERMICO A CONDENSAZIONE, L?INSTALLAZIONE ESTERNA DI UNA POMPA DI CALORE ARIA/ACQUA IN INTEGRAZIONE E DI UN CAMPO FOTOVOLTAICO SULLA COPERTURA DELLA PALESTRA. L?IMPIANTO SAR? DOTATO DI UN DEMINERALIZZATORE SUL REINTEGRO ALLA CALDAIA E DI UN DOSATORE DI POLIFOSFATI SUL REINTEGRO DEL CIRCUITO SECONDARIO PER GARANTIRE UNA DURATA MAGGIORE DELLE COMPONENTISTICHE IDRAULICHE. SAR? INOLTRE INSTALLATO UNO SCAMBIATORE DI CALORE A PIASTRE PER DIVIDERE IL CIRCUITO PRIMARIO DI PRODUZIONE CALORE CON IL SECONDARIO ESISTENTE. L?IMPIANTO INTERNO DEL GAS VERR? MODIFICATO PER ESSERE ADATTATO AL COLLEGAMENTO COL NUOVO GENERATORE DI CALORE. LA MODIFICA RIGUARDER? ANCHE IL CONDOTTO DEI FUMI. CHE SAR? MODELLATO PER RIALLACCIARE LA C (Italian)
    0 references
    THE PROJECT COVERS A SINGLE BUILDING AND PROVIDES FOR THE IMPLEMENTATION OF N? 2 FUNCTIONAL BATCHES. 1? LOT CONCERNS THE RENOVATION OF THE THERMAL POWER PLANT. THE INTERVENTIONS TO BE CARRIED OUT MAINLY CONCERN THE REPLACEMENT OF THE CURRENT GAS CRANKCASE BOILER WITH A CONDENSING THERMAL GENERATOR, THE EXTERNAL INSTALLATION OF AN INTEGRATED AIR-TO-WATER HEAT PUMP AND A PHOTOVOLTAIC FIELD ON THE GYM COVER. L? SAR? EQUIPPED WITH A RELAXATION ON THE MAKE-UP OF THE BOILER AND A SECONDARY SCHOOL DOSING DEVICE ON THE REINTEGRATION OF THE SECONDARY CIRCUIT TO ENSURE A LONGER DURATION OF HYDRAULIC COMPONENTS. SAR? IN ADDITION, A PLATE HEAT EXCHANGER INSTALLED TO DIVIDE THE PRIMARY HEAT PRODUCTION CIRCUIT WITH THE EXISTING SECONDARY CIRCUIT. L? IS THE INTERNAL INSTALLATION OF THE GAS VERR? MODIFIED TO BE ADAPTED TO THE LINK WITH THE NEW HEAT GENERATOR. HAS THE AMENDMENT BEEN AMENDED? ALSO THE FLUE DUCT. WHAT IS THE RESULT OF THE SAR? SHAPED TO REACHL C (English)
    0 references
    LE PROJET CONCERNE UN SEUL BÂTIMENT ET IMPLIQUE LA RÉALISATION DE 2 LOTS FONCTIONNELS. AU 1ST? LE LOT CONCERNE LA RÉNOVATION DE LA CENTRALE ÉLECTRIQUE. LES INTERVENTIONS À RÉALISER CONCERNENT PRINCIPALEMENT LE REMPLACEMENT DE LA CHAUDIÈRE ACTUELLE DE BASE DE GAZ PAR UN GÉNÉRATEUR THERMIQUE À CONDENSATION, L’INSTALLATION EXTERNE D’UNE POMPE À CHALEUR AIR/EAU EN INTÉGRATION ET UN CHAMP PHOTOVOLTAÏQUE SUR LE TOIT DE LA SALLE DE GYM. L’USINE SAR? ÉQUIPÉ D’UN DÉMINÉRALISATEUR SUR LA RÉINTÉGRATION À LA CHAUDIÈRE ET D’UN DOSEUR DE POLYPHOSPHATE SUR LA RÉINTÉGRATION DU CIRCUIT SECONDAIRE POUR ASSURER UNE PLUS LONGUE DURÉE DE VIE DES COMPOSANTS HYDRAULIQUES. C’EST SAR? ÉGALEMENT INSTALLÉ UN ÉCHANGEUR DE CHALEUR À PLAQUES POUR DIVISER LE CIRCUIT DE PRODUCTION DE CHALEUR PRIMAIRE AVEC LE SECONDAIRE EXISTANT. L’USINE DE GAZ INTERNE LE SERA? MODIFIÉ POUR ÊTRE ADAPTÉ À LA CONNEXION AVEC LE NOUVEAU GÉNÉRATEUR DE CHALEUR. LE CHANGEMENT À CE SUJET? AUSSI LE CONDUIT DE FUMÉE. QU’EST-CE QUE C’EST QUE LA SAR? MOULÉ POUR RECONNECTER LE C (French)
    16 December 2021
    0 references