242_VALERMOSA_411_INTEGRATED ENERGY USE SYSTEMS INTEGRATED SCHOOL BUILDINGS AND INSTALLATIONS (Q2051817): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
242_VALLERMOSA_411_ENERGY REQUALIFICATION SYSTÈMES ET SYSTÈMES INTÉGRÉS DE BÂTIMENTS SCOLAIRES | |||||||||||||||
Property / summary | |||||||||||||||
INSTALLATION DE BOUCLIERS SOLAIRES, REMPLACEMENT PONCTUEL DU SYSTÈME D’ÉCLAIRAGE DU TRADITIONNEL AU LED, INSTALLATION D’UNE POMPE À CHALEUR AIR-EAU ET BOÎTIER EFFICACE. (French) | |||||||||||||||
Property / summary: INSTALLATION DE BOUCLIERS SOLAIRES, REMPLACEMENT PONCTUEL DU SYSTÈME D’ÉCLAIRAGE DU TRADITIONNEL AU LED, INSTALLATION D’UNE POMPE À CHALEUR AIR-EAU ET BOÎTIER EFFICACE. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALLATION DE BOUCLIERS SOLAIRES, REMPLACEMENT PONCTUEL DU SYSTÈME D’ÉCLAIRAGE DU TRADITIONNEL AU LED, INSTALLATION D’UNE POMPE À CHALEUR AIR-EAU ET BOÎTIER EFFICACE. (French) / qualifier | |||||||||||||||
point in time: 16 December 2021
|
Revision as of 11:01, 16 December 2021
Project Q2051817 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | 242_VALERMOSA_411_INTEGRATED ENERGY USE SYSTEMS INTEGRATED SCHOOL BUILDINGS AND INSTALLATIONS |
Project Q2051817 in Italy |
Statements
98,133.32 Euro
0 references
196,266.65 Euro
0 references
50.0 percent
0 references
8 May 2018
0 references
29 April 2020
0 references
COMUNE DI VALLERMOSA
0 references
INSTALLAZIONE SCHERMATURE SOLARI, SOSTITUZIONE PUNTUALE IMPIANTO DI ILLUMINAZIONE DA TRADIZIONALE A LED, INSTALLAZIONE POMPA DI CALORE ARIA-ACQUA E EFFICIENTAMENTO INVOLUCRO. (Italian)
0 references
INSTALLATION OF SOLAR SHADING, INDIVIDUAL REPLACEMENT OF TRADITIONAL LED LIGHTING, AIR-TO-WATER HEAT PUMP INSTALLATION AND ENHANCING EFFICIENCY. (English)
0 references
INSTALLATION DE BOUCLIERS SOLAIRES, REMPLACEMENT PONCTUEL DU SYSTÈME D’ÉCLAIRAGE DU TRADITIONNEL AU LED, INSTALLATION D’UNE POMPE À CHALEUR AIR-EAU ET BOÎTIER EFFICACE. (French)
16 December 2021
0 references
Identifiers
H38H18000010006
0 references