Removal of Fibrocement in School Buildings — Basic School No. 2 of Taveiro (Q3357343): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Entfernung von Fibrocement in Schulgebäuden – Grundschule Nr. 2 von Taveiro | |||||||||||||||
Property / summary | |||||||||||||||
Die vorliegende Operation materialisiert sich in einer Intervention, um die Asbestzementfliesen zu entfernen. Es soll alle Asbest-Zement-Komponenten durch die Möglichkeit von Asbest (Krebs-Gene-Material) durch Platten aus profilierten Blechverkleidungen ersetzen. (German) | |||||||||||||||
Property / summary: Die vorliegende Operation materialisiert sich in einer Intervention, um die Asbestzementfliesen zu entfernen. Es soll alle Asbest-Zement-Komponenten durch die Möglichkeit von Asbest (Krebs-Gene-Material) durch Platten aus profilierten Blechverkleidungen ersetzen. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Die vorliegende Operation materialisiert sich in einer Intervention, um die Asbestzementfliesen zu entfernen. Es soll alle Asbest-Zement-Komponenten durch die Möglichkeit von Asbest (Krebs-Gene-Material) durch Platten aus profilierten Blechverkleidungen ersetzen. (German) / qualifier | |||||||||||||||
point in time: 16 December 2021
|
Revision as of 08:14, 16 December 2021
Project Q3357343 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Removal of Fibrocement in School Buildings — Basic School No. 2 of Taveiro |
Project Q3357343 in Portugal |
Statements
100,508.0 Euro
0 references
100,508.0 Euro
0 references
100.0 percent
0 references
17 December 2020
0 references
31 July 2021
0 references
MUNICÃPIO DE COIMBRA
0 references
A presente operação materializa-se numa intervenção para remover as telhas de fibrocimento. Pretende-se substituir todos os elementos em fibrocimento, com a possibilidade de terem amianto (material cancerÃgeno), por painéis de cobertura de chapa perfilada. (Portuguese)
0 references
The present operation materialises in an intervention to remove the asbestos cement tiles. It is intended to replace all asbestos-cement components, with the possibility of having asbestos (cancer-gene material), with panels of profiled sheet covering. (English)
29 November 2021
0 references
L’opération actuelle se matérialise dans une intervention visant à enlever les tuiles de ciment d’amiante. Il est destiné à remplacer tous les composants en amiante-ciment, par la possibilité d’avoir de l’amiante (matériau cancérogène), par des panneaux de revêtement en tôle profilée. (French)
7 December 2021
0 references
Die vorliegende Operation materialisiert sich in einer Intervention, um die Asbestzementfliesen zu entfernen. Es soll alle Asbest-Zement-Komponenten durch die Möglichkeit von Asbest (Krebs-Gene-Material) durch Platten aus profilierten Blechverkleidungen ersetzen. (German)
16 December 2021
0 references
Coimbra, Região de Coimbra, Centro
0 references
Identifiers
CENTRO-03-5673-FEDER-000248
0 references