Restructuring of Wastewater Treatment Systems of the Municipality of Carregal do Sal – Currelos Subsystem (Q2982557): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
Umstrukturierung der Abwasserbehandlungssysteme der Gemeinde Carregal do Sal – Teilsystem Currelos
Property / summary
 
Der Betrieb selbst umfasst die Ausführung von Liftstationen, Lifting Conducts, Gravite Conducts, WWTP und deren Zugang zu neuer Infrastruktur. Um die Maßnahme besser zusammenzufassen, wurde das Durchführungsprojekt in drei Rubriken unterteilt: Abwasserentsorgung Kläranlage – WWTP CurrelosZugänge (German)
Property / summary: Der Betrieb selbst umfasst die Ausführung von Liftstationen, Lifting Conducts, Gravite Conducts, WWTP und deren Zugang zu neuer Infrastruktur. Um die Maßnahme besser zusammenzufassen, wurde das Durchführungsprojekt in drei Rubriken unterteilt: Abwasserentsorgung Kläranlage – WWTP CurrelosZugänge (German) / rank
 
Normal rank
Property / summary: Der Betrieb selbst umfasst die Ausführung von Liftstationen, Lifting Conducts, Gravite Conducts, WWTP und deren Zugang zu neuer Infrastruktur. Um die Maßnahme besser zusammenzufassen, wurde das Durchführungsprojekt in drei Rubriken unterteilt: Abwasserentsorgung Kläranlage – WWTP CurrelosZugänge (German) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:12, 16 December 2021

Project Q2982557 in Portugal
Language Label Description Also known as
English
Restructuring of Wastewater Treatment Systems of the Municipality of Carregal do Sal – Currelos Subsystem
Project Q2982557 in Portugal

    Statements

    0 references
    2,500,000.0 Euro
    0 references
    3,191,884.0 Euro
    0 references
    78.32 percent
    0 references
    7 February 2020
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE CARREGAL DO SAL
    0 references
    0 references

    40°26'0.28"N, 8°0'10.87"W
    0 references
    A operação em si comporta a execução de Estações Elevatórias, Condutas elevatórias, Condutas Gravíticas, ETAR e respetivos acessos às novas infraestruturas. Para melhor sintetizar a operação, o projeto de execução foi subdividido em três rubricas: •Sistema de drenagem de águas residuais •Estação de Tratamento de Águas Residuais - ETAR Currelos•Acessos (Portuguese)
    0 references
    The operation itself involves the execution of Elevatory Stations, Lifting Conducts, Gravitic Conducts, WATER and respective access to new infrastructures. To better summarise the operation, the implementation project was subdivided into three headings: Wastewater drainage system Wastewater Treatment Station – Wastewater Treatment Plant (English)
    9 July 2021
    0 references
    L’exploitation elle-même implique l’exécution de stations de levage, de conduites de levage, de conduites gravites, de stations d’épuration des eaux usées et de leur accès à de nouvelles infrastructures. Pour mieux résumer l’opération, le projet de mise en œuvre a été subdivisé en trois rubriques: Système de drainage des eaux usées Station de traitement des eaux usées — WWTP CurrelosAccesses (French)
    7 December 2021
    0 references
    Der Betrieb selbst umfasst die Ausführung von Liftstationen, Lifting Conducts, Gravite Conducts, WWTP und deren Zugang zu neuer Infrastruktur. Um die Maßnahme besser zusammenzufassen, wurde das Durchführungsprojekt in drei Rubriken unterteilt: Abwasserentsorgung Kläranlage – WWTP CurrelosZugänge (German)
    16 December 2021
    0 references
    Carregal do Sal
    0 references

    Identifiers

    POSEUR-03-2012-FC-000789
    0 references