Lapas/Ribeira Branca Sanitation Subsystem (Q2982015): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Teilsystem Lapas/Ribeira Branca Sanitation | |||||||||||||||
Property / summary | |||||||||||||||
Der Betrieb sieht die Sanierung der bestehenden Kläranlage (Einführung eines Vorbehandlungssystems) und die Anbindung bestehender und unbehandelter Netze im Teilsystem (Casais Martanes, Almonda und Zibreira) sowie den Bau eines neuen Netzes in Videla und den Ausbau bestehender Netze zur Erhöhung der Abdeckung vor, was zur Verbesserung der Qualität der Wasserkörper beiträgt. (German) | |||||||||||||||
Property / summary: Der Betrieb sieht die Sanierung der bestehenden Kläranlage (Einführung eines Vorbehandlungssystems) und die Anbindung bestehender und unbehandelter Netze im Teilsystem (Casais Martanes, Almonda und Zibreira) sowie den Bau eines neuen Netzes in Videla und den Ausbau bestehender Netze zur Erhöhung der Abdeckung vor, was zur Verbesserung der Qualität der Wasserkörper beiträgt. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Der Betrieb sieht die Sanierung der bestehenden Kläranlage (Einführung eines Vorbehandlungssystems) und die Anbindung bestehender und unbehandelter Netze im Teilsystem (Casais Martanes, Almonda und Zibreira) sowie den Bau eines neuen Netzes in Videla und den Ausbau bestehender Netze zur Erhöhung der Abdeckung vor, was zur Verbesserung der Qualität der Wasserkörper beiträgt. (German) / qualifier | |||||||||||||||
point in time: 15 December 2021
|
Revision as of 20:05, 15 December 2021
Project Q2982015 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Lapas/Ribeira Branca Sanitation Subsystem |
Project Q2982015 in Portugal |
Statements
2,916,353.0 Euro
0 references
3,431,003.0 Euro
0 references
85.0 percent
0 references
1 January 2016
0 references
31 December 2020
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
A operação prevê a remodelação da ETAR existente (introdução de um sistema de pré-tratamento) e a ligação das redes já existentes e sem tratamento no subsistema (Casais Martanes, Almonda e Zibreira), assim como a construção de nova rede em Videla e a ampliação das redes existentes para aumentar a cobertura, contribuindo para a melhoria da qualidade das massas de água. (Portuguese)
0 references
The operation provides for the refurbishment of the existing sewage treatment plant (introduction of a pre-treatment system) and the connection of existing and untreated networks in the subsystem (Casais Martanes, Almonda and Zibreira), as well as the construction of a new network in Videla and the expansion of existing networks to increase the coverage, contributing to the improvement of the quality of water bodies. (English)
9 July 2021
0 references
L’opération prévoit la remise en état de la station d’épuration existante (introduction d’un système de prétraitement) et le raccordement des réseaux existants et non traités dans le sous-système (Casais Martanes, Almonda et Zibreira), ainsi que la construction d’un nouveau réseau à Videla et l’extension des réseaux existants pour accroître la couverture, contribuant à l’amélioration de la qualité des masses d’eau. (French)
7 December 2021
0 references
Der Betrieb sieht die Sanierung der bestehenden Kläranlage (Einführung eines Vorbehandlungssystems) und die Anbindung bestehender und unbehandelter Netze im Teilsystem (Casais Martanes, Almonda und Zibreira) sowie den Bau eines neuen Netzes in Videla und den Ausbau bestehender Netze zur Erhöhung der Abdeckung vor, was zur Verbesserung der Qualität der Wasserkörper beiträgt. (German)
15 December 2021
0 references
Torres Novas
0 references
Identifiers
POSEUR-03-2012-FC-000036
0 references