Energy efficiency of the IPC-ESAC BLOCO J (Q2981225): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
Energieeffizienz von IPC-ESAC BLOCO J
Property / summary
 
Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German)
Property / summary: Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German) / rank
 
Normal rank
Property / summary: Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German) / qualifier
 
point in time: 15 December 2021
Timestamp+2021-12-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:58, 15 December 2021

Project Q2981225 in Portugal
Language Label Description Also known as
English
Energy efficiency of the IPC-ESAC BLOCO J
Project Q2981225 in Portugal

    Statements

    0 references
    54,588.0 Euro
    0 references
    107,455.0 Euro
    0 references
    50.8 percent
    0 references
    1 June 2019
    0 references
    30 September 2021
    0 references
    INSTITUTO POLITECNICO DE COIMBRA
    0 references
    0 references

    40°12'25.85"N, 8°28'10.49"W
    0 references
    O projeto de eficiência energética do BLOCO J do IPC-ESAC inclui a instalação de isolamento térmico na envolvente opaca, caixilharias de alumínio com corte térmico e vidro duplo, luminárias LED e equipamento HVAC eficiente, no valor total de investimento de 105 610 €, que reduz em 65,4% o consumo de energia primária, evita a emissão de 29 t CO2/ano, gera uma poupança de 13894 €/ano e permite a passagem do edifício para a classe energética A. (Portuguese)
    0 references
    The energy efficiency project of the IPC-ESAC BLOCO J includes the installation of thermal insulation in the opaque surroundings, aluminum frames with thermal cut and double glazing, LED luminaires and efficient HVAC equipment, with a total investment value of EUR 105,610, which reduces the primary energy consumption by 65.4 %, avoids the emission of 29 t CO2/year, generates savings of EUR 13894/year and allows the passage of the building to energy class A. (English)
    9 July 2021
    0 references
    Le projet d’efficacité énergétique IPC-ESAC BLOCO J comprend l’installation d’isolation thermique dans l’enveloppe opaque, des cadres en aluminium avec coupe thermique et double verre, des luminaires LED et des équipements CVC efficaces, d’une valeur d’investissement totale de 105,610 EUR, ce qui réduit la consommation d’énergie primaire de 65,4 %, prévient les émissions de 29 t de CO2/an, génère des économies de 13 894 EUR/an et permet le passage du bâtiment à la classe énergétique A. (French)
    7 December 2021
    0 references
    Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German)
    15 December 2021
    0 references
    Coimbra, União das freguesias de São Martinho do Bispo e Ribeira de Frades
    0 references

    Identifiers

    POSEUR-01-1203-FC-000134
    0 references