Energy efficiency of the IPC-ESAC BLOCO J (Q2981225): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Energieeffizienz von IPC-ESAC BLOCO J | |||||||||||||||
Property / summary | |||||||||||||||
Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German) | |||||||||||||||
Property / summary: Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German) / qualifier | |||||||||||||||
point in time: 15 December 2021
|
Revision as of 19:58, 15 December 2021
Project Q2981225 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy efficiency of the IPC-ESAC BLOCO J |
Project Q2981225 in Portugal |
Statements
54,588.0 Euro
0 references
107,455.0 Euro
0 references
50.8 percent
0 references
1 June 2019
0 references
30 September 2021
0 references
INSTITUTO POLITECNICO DE COIMBRA
0 references
O projeto de eficiência energética do BLOCO J do IPC-ESAC inclui a instalação de isolamento térmico na envolvente opaca, caixilharias de alumínio com corte térmico e vidro duplo, luminárias LED e equipamento HVAC eficiente, no valor total de investimento de 105 610 , que reduz em 65,4% o consumo de energia primária, evita a emissão de 29 t CO2/ano, gera uma poupança de 13894 /ano e permite a passagem do edifício para a classe energética A. (Portuguese)
0 references
The energy efficiency project of the IPC-ESAC BLOCO J includes the installation of thermal insulation in the opaque surroundings, aluminum frames with thermal cut and double glazing, LED luminaires and efficient HVAC equipment, with a total investment value of EUR 105,610, which reduces the primary energy consumption by 65.4 %, avoids the emission of 29 t CO2/year, generates savings of EUR 13894/year and allows the passage of the building to energy class A. (English)
9 July 2021
0 references
Le projet d’efficacité énergétique IPC-ESAC BLOCO J comprend l’installation d’isolation thermique dans l’enveloppe opaque, des cadres en aluminium avec coupe thermique et double verre, des luminaires LED et des équipements CVC efficaces, d’une valeur d’investissement totale de 105,610 EUR, ce qui réduit la consommation d’énergie primaire de 65,4 %, prévient les émissions de 29 t de CO2/an, génère des économies de 13 894 EUR/an et permet le passage du bâtiment à la classe énergétique A. (French)
7 December 2021
0 references
Das Energieeffizienzprojekt IPC-ESAC BLOCO J umfasst den Einbau von Wärmedämmung in der opaken Hülle, Aluminiumrahmen mit thermischem Schnitt und Doppelglas, LED-Leuchten und effiziente HLK-Ausstattung, mit einem Gesamtinvestitionswert von 105 610 EUR, was den Primärenergieverbrauch um 65,4 % reduziert, die Emission von 29 t CO2/Jahr verhindert, Einsparungen von 13 894 EUR/Jahr generiert und den Übergang des Gebäudes in die Energieklasse A ermöglicht. (German)
15 December 2021
0 references
Coimbra, União das freguesias de São Martinho do Bispo e Ribeira de Frades
0 references
Identifiers
POSEUR-01-1203-FC-000134
0 references