Energy Efficiency in the LOCAL HEALTH UNIT OF THE HIGH MINHO, E.P.E. – Viana do Castelo Hospital (Q2981197): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Energieeffizienz im LOCAL HEALTH UNIT DES HIGH MINHO, E.P.E. – Hospital de Viana do Castelo | |||||||||||||||
Property / summary | |||||||||||||||
Das Krankenhaus Viana do Castelo schlägt vor, seine Energiesysteme umzuwandeln, um erhebliche Einsparungen in Bezug auf den Energieverbrauch, die Aufrechterhaltung und Verbesserung der Serviceleistungen und die Versorgungssicherheit zu erzielen. (German) | |||||||||||||||
Property / summary: Das Krankenhaus Viana do Castelo schlägt vor, seine Energiesysteme umzuwandeln, um erhebliche Einsparungen in Bezug auf den Energieverbrauch, die Aufrechterhaltung und Verbesserung der Serviceleistungen und die Versorgungssicherheit zu erzielen. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Das Krankenhaus Viana do Castelo schlägt vor, seine Energiesysteme umzuwandeln, um erhebliche Einsparungen in Bezug auf den Energieverbrauch, die Aufrechterhaltung und Verbesserung der Serviceleistungen und die Versorgungssicherheit zu erzielen. (German) / qualifier | |||||||||||||||
point in time: 15 December 2021
|
Revision as of 19:58, 15 December 2021
Project Q2981197 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Efficiency in the LOCAL HEALTH UNIT OF THE HIGH MINHO, E.P.E. – Viana do Castelo Hospital |
Project Q2981197 in Portugal |
Statements
3,271,954.0 Euro
0 references
3,444,162.0 Euro
0 references
95.0 percent
0 references
1 January 2017
0 references
27 September 2021
0 references
UNIDADE LOCAL DE SAÚDE DO ALTO MINHO, E.P.E.
0 references
Q3002109 (Deleted Item)
0 references
Hospital de Viana do Castelo propõe-se reconverter os seus sistemas energéticos, de forma aobter poupanças significativas em termos de consumo de energia, mantendo e melhorando osoutputs de serviço e de segurança no abastecimento.Esta operação vai ser feita través de medidas incidindo sobre os principias drivers de consumoenergético. (Portuguese)
0 references
Hospital de Viana do Castelo proposes to reconvert its energy systems in order to obtain significant savings in terms of energy consumption, maintaining and improving service and security supply outputs.This operation will be carried out through measures focusing on the main energy consumption drivers. (English)
9 July 2021
0 references
L’hôpital de Viana do Castelo propose de reconvertir ses systèmes énergétiques afin d’obtenir des économies significatives en termes de consommation d’énergie, de maintien et d’amélioration des prestations de service et de sécurité d’approvisionnement. (French)
7 December 2021
0 references
Das Krankenhaus Viana do Castelo schlägt vor, seine Energiesysteme umzuwandeln, um erhebliche Einsparungen in Bezug auf den Energieverbrauch, die Aufrechterhaltung und Verbesserung der Serviceleistungen und die Versorgungssicherheit zu erzielen. (German)
15 December 2021
0 references
Viana do Castelo, União das freguesias de Viana do Castelo (Santa Maria Maior e Monserrate) e Meadela
0 references
Identifiers
POSEUR-01-1203-FC-000083
0 references