PROCESS EFFICIENCY INNOVATION (Q2033265): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
INNOVATION POUR L’EFFICACITÉ DES PROCESSUS | |||||||||||||||
Property / summary | |||||||||||||||
LE PROCESSUS DE CONSULTATION PROPOSÉ SE COMPOSE DE 4 PHASES ET EST ORIENTÉ VERS LA CONFIGURATION D’UN SYSTÈME DE PRODUCTION SELON LES SCHÉMAS DE L’INDUSTRIE 4.0 QUI PERMET À L’ENTREPRISE DE RÉCUPÉRER L’EFFICACITÉ GRÂCE À DES SYSTÈMES AVANCÉS POUR LE CONTRÔLE ET LA GESTION DES OPÉRATIONS DE PRODUCTION. (French) | |||||||||||||||
Property / summary: LE PROCESSUS DE CONSULTATION PROPOSÉ SE COMPOSE DE 4 PHASES ET EST ORIENTÉ VERS LA CONFIGURATION D’UN SYSTÈME DE PRODUCTION SELON LES SCHÉMAS DE L’INDUSTRIE 4.0 QUI PERMET À L’ENTREPRISE DE RÉCUPÉRER L’EFFICACITÉ GRÂCE À DES SYSTÈMES AVANCÉS POUR LE CONTRÔLE ET LA GESTION DES OPÉRATIONS DE PRODUCTION. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: LE PROCESSUS DE CONSULTATION PROPOSÉ SE COMPOSE DE 4 PHASES ET EST ORIENTÉ VERS LA CONFIGURATION D’UN SYSTÈME DE PRODUCTION SELON LES SCHÉMAS DE L’INDUSTRIE 4.0 QUI PERMET À L’ENTREPRISE DE RÉCUPÉRER L’EFFICACITÉ GRÂCE À DES SYSTÈMES AVANCÉS POUR LE CONTRÔLE ET LA GESTION DES OPÉRATIONS DE PRODUCTION. (French) / qualifier | |||||||||||||||
point in time: 15 December 2021
|
Revision as of 09:08, 15 December 2021
Project Q2033265 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | PROCESS EFFICIENCY INNOVATION |
Project Q2033265 in Italy |
Statements
7,500.0 Euro
0 references
15,000.0 Euro
0 references
50.0 percent
0 references
25 September 2017
0 references
10 January 2019
0 references
31 March 2018
0 references
M. C. M. SRL
0 references
Q281674 (Deleted Item)
0 references
IL PERCORSO CONSULENZIALE PROPOSTO SI COMPONE DI 4 FASI ED Ê ORIENTATO ALLA CONFIGURAZIONE DI UN SISTEMA PRODUTTIVO SECONDO GLI SCHEMI DI INDUSTRIA 4.0 CHE PERMETTA ALL'AZIENDA UN RECUPERO DI EFFICIENZA GRAZIE A SISTEMI AVANZATI PER IL CONTROLLO E LA GESTIONE DELLE OPERAZIONI PRODUTTIVE. (Italian)
0 references
THE PROPOSED CONSULTANCY PROCESS CONSISTS OF 4 STEPS AND ÃS GEARED TO THE DESIGN OF A PRODUCTION SYSTEM ACCORDING TO INDUSTRY 4.0 SCHEMES, ALLOWING EFFICIENCY RECOVERY BY MEANS OF ADVANCED SYSTEMS FOR CONTROL AND MANAGEMENT OF PRODUCTION OPERATIONS. (English)
0 references
LE PROCESSUS DE CONSULTATION PROPOSÉ SE COMPOSE DE 4 PHASES ET EST ORIENTÉ VERS LA CONFIGURATION D’UN SYSTÈME DE PRODUCTION SELON LES SCHÉMAS DE L’INDUSTRIE 4.0 QUI PERMET À L’ENTREPRISE DE RÉCUPÉRER L’EFFICACITÉ GRÂCE À DES SYSTÈMES AVANCÉS POUR LE CONTRÔLE ET LA GESTION DES OPÉRATIONS DE PRODUCTION. (French)
15 December 2021
0 references
Identifiers
C89J17000270007
0 references