Willemsoord (Q3989547): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
HVC invests in a heat network and geothermal source for the Willemsoord area. The realisation of this first step will allow the realisation of a larger heat network with sustainable source in Den Helder. Through the realisation of the heat grid on... (English) | |||||||||||||||
Property / summary: HVC invests in a heat network and geothermal source for the Willemsoord area. The realisation of this first step will allow the realisation of a larger heat network with sustainable source in Den Helder. Through the realisation of the heat grid on... (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HVC invests in a heat network and geothermal source for the Willemsoord area. The realisation of this first step will allow the realisation of a larger heat network with sustainable source in Den Helder. Through the realisation of the heat grid on... (English) / qualifier | |||||||||||||||
point in time: 15 December 2021
|
Revision as of 06:17, 15 December 2021
Project Q3989547 in Netherlands
Language | Label | Description | Also known as |
---|---|---|---|
English | Willemsoord |
Project Q3989547 in Netherlands |
Statements
1,150,000.0 Euro
0 references
5,843,200.0 Euro
0 references
19.681 percent
0 references
1 April 2020
0 references
30 September 2023
0 references
HVC Warmte BV
0 references
Q3987517 (Deleted Item)
0 references
1812 RD
0 references
HVC investeert in een warmtenet en geothermiebron voor het gebied Willemsoord. Door de realisatie van deze eerste stap wordt de realisatie van een groter warmtenet met duurzame bron in Den Helder mogelijk. Door de realisatie van het warmtenet op... (Dutch)
0 references
HVC invests in a heat network and geothermal source for the Willemsoord area. The realisation of this first step will allow the realisation of a larger heat network with sustainable source in Den Helder. Through the realisation of the heat grid on... (English)
15 December 2021
0 references
Identifiers
OP-2014-2023-West-KVW-00269
0 references