MUNICIPALITY OF TORELLA DEI LOMBARDI (AV) — WORKS TO COMPLETE THE SEWAGE SYSTEM IN THE SERVICE OF THE MUNICIPAL AND MUNICIPAL VILLAGES — 3° LOTTO (Q2023270): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
COMMUNE DE TORELLA DEI LOMBARDI (AV) — TRAVAUX POUR COMPLÉTER LE RÉSEAU D’ASSAINISSEMENT AU SERVICE DES COMMUNES ET VILLAGES — 3° LOT
Property / summary
 
LE PROJET PROPOSÉ CONSTITUE LE 3ÈME LOT FONCTIONNEL DE LA CONSTRUCTION DU RÉSEAU D’ASSAINISSEMENT POUR DESSERVIR LES DISTRICTS ET LES VILLAGES MUNICIPAUX: AVEC LES DEUX AUTRES LOTS, EN RAISON D’UN MANQUE DE COUVERTURE FINANCIÈRE, LA STATION D’ÉPURATION DES EAUX USÉES DEVAIT ÊTRE CONSTRUITE POUR 600 HABITANTS, ALORS QUE LA POPULATION TOTALE ESTIMÉE À 900 HABITANTS ET D’AUTRES TRONÇONS D’ASSAINISSEMENT DESSERVAIENT LES VILLAGES COMMUNAUTAIRES.LES TRAVAUX PRÉVUS AVEC LE PROJET PROPOSÉ POUR FINANCER LA CONSTRUCTION DES COLLECTEURS RACCORDÉS À LA STATION D’ÉPURATION EXISTANTE. (French)
Property / summary: LE PROJET PROPOSÉ CONSTITUE LE 3ÈME LOT FONCTIONNEL DE LA CONSTRUCTION DU RÉSEAU D’ASSAINISSEMENT POUR DESSERVIR LES DISTRICTS ET LES VILLAGES MUNICIPAUX: AVEC LES DEUX AUTRES LOTS, EN RAISON D’UN MANQUE DE COUVERTURE FINANCIÈRE, LA STATION D’ÉPURATION DES EAUX USÉES DEVAIT ÊTRE CONSTRUITE POUR 600 HABITANTS, ALORS QUE LA POPULATION TOTALE ESTIMÉE À 900 HABITANTS ET D’AUTRES TRONÇONS D’ASSAINISSEMENT DESSERVAIENT LES VILLAGES COMMUNAUTAIRES.LES TRAVAUX PRÉVUS AVEC LE PROJET PROPOSÉ POUR FINANCER LA CONSTRUCTION DES COLLECTEURS RACCORDÉS À LA STATION D’ÉPURATION EXISTANTE. (French) / rank
 
Normal rank
Property / summary: LE PROJET PROPOSÉ CONSTITUE LE 3ÈME LOT FONCTIONNEL DE LA CONSTRUCTION DU RÉSEAU D’ASSAINISSEMENT POUR DESSERVIR LES DISTRICTS ET LES VILLAGES MUNICIPAUX: AVEC LES DEUX AUTRES LOTS, EN RAISON D’UN MANQUE DE COUVERTURE FINANCIÈRE, LA STATION D’ÉPURATION DES EAUX USÉES DEVAIT ÊTRE CONSTRUITE POUR 600 HABITANTS, ALORS QUE LA POPULATION TOTALE ESTIMÉE À 900 HABITANTS ET D’AUTRES TRONÇONS D’ASSAINISSEMENT DESSERVAIENT LES VILLAGES COMMUNAUTAIRES.LES TRAVAUX PRÉVUS AVEC LE PROJET PROPOSÉ POUR FINANCER LA CONSTRUCTION DES COLLECTEURS RACCORDÉS À LA STATION D’ÉPURATION EXISTANTE. (French) / qualifier
 
point in time: 14 December 2021
Timestamp+2021-12-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:47, 14 December 2021

Project Q2023270 in Italy
Language Label Description Also known as
English
MUNICIPALITY OF TORELLA DEI LOMBARDI (AV) — WORKS TO COMPLETE THE SEWAGE SYSTEM IN THE SERVICE OF THE MUNICIPAL AND MUNICIPAL VILLAGES — 3° LOTTO
Project Q2023270 in Italy

    Statements

    0 references
    1,050,032.53 Euro
    0 references
    1,400,043.38 Euro
    0 references
    75.0 percent
    0 references
    1 September 2013
    0 references
    30 June 2018
    0 references
    COMUNE DI TORELLA DEI LOMBARDI
    0 references
    0 references

    40°56'22.99"N, 15°6'54.18"E
    0 references
    IL PROGETTO PROPOSTO COSTITUISCE IL 3° LOTTO FUNZIONALE DELL'INTERVENTO DI COSTRUZIONE DELLA RETE FOGNARIA A SERVIZIO DELLE CONTRADE E BORGATE COMUNALI: CON GLI ALTRI DUE LOTTI, PER CARENZA DI COPERTURA FINANZIARIA, FU PREVISTA LA REALIZZAZIONE FUNZIONALE DELL'IMPIANTO DI DEPURAZIONE PER UN NUMERO DI 600 ABITANTI A FRONTE DELLA POPOLAZIONE TOTALE PRESUNTA DI 900 ABITANTI E DI ALTRI TRATTI DI RETE FOGNARIA A SERVIZIO DELLE BORGATE COMUNALI.LE OPERE PREVISTE CON IL PROGETTO PROPOSTO A FINANZIAMENTO CONSENTONO LA REALIZZAZIONE DEI COLLETTORI DI COLLEGAMENTO ALL'ESISTENTE IMPIANTO DI DEPURAZIONE. (Italian)
    0 references
    THE PROPOSED PROJECT IS THE 3ND CONSTITUENT PART OF THE CONSTRUCTION OF THE SEWAGE SYSTEM AT THE SERVICE OF THE DISTRICT AND MUNICIPAL GATE: WITH THE OTHER TWO LOTS, DUE TO A LACK OF FINANCIAL COVER, THE OPERATION OF THE TREATMENT PLANT WAS PROVIDED FOR A NUMBER OF 600 INHABITANTS IN THE FACE OF THE PRESUMED TOTAL POPULATION OF 900 INHABITANTS AND OTHER SEWER SYSTEMS AT THE SERVICE OF THE VILLAGES OF THE PROJECT PROPOSED FOR FINANCING, ALLOWING THE CONNECTIONS TO THE EXISTING WATER TREATMENT PLANT TO BE CARRIED OUT. (English)
    0 references
    LE PROJET PROPOSÉ CONSTITUE LE 3ÈME LOT FONCTIONNEL DE LA CONSTRUCTION DU RÉSEAU D’ASSAINISSEMENT POUR DESSERVIR LES DISTRICTS ET LES VILLAGES MUNICIPAUX: AVEC LES DEUX AUTRES LOTS, EN RAISON D’UN MANQUE DE COUVERTURE FINANCIÈRE, LA STATION D’ÉPURATION DES EAUX USÉES DEVAIT ÊTRE CONSTRUITE POUR 600 HABITANTS, ALORS QUE LA POPULATION TOTALE ESTIMÉE À 900 HABITANTS ET D’AUTRES TRONÇONS D’ASSAINISSEMENT DESSERVAIENT LES VILLAGES COMMUNAUTAIRES.LES TRAVAUX PRÉVUS AVEC LE PROJET PROPOSÉ POUR FINANCER LA CONSTRUCTION DES COLLECTEURS RACCORDÉS À LA STATION D’ÉPURATION EXISTANTE. (French)
    14 December 2021
    0 references

    Identifiers

    B53H15000000009
    0 references