REHABILITATION OF THE PELOURINHO SQUARE (Q2895018): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
SANIERUNG DER KÜSTE VON PELOURINHO | |||||||||||||||
Property / summary | |||||||||||||||
Das zu intervenierende Gebiet befindet sich im Herzen der Stadt, das gleiche degradiert und disqualifiziert, d. h. ohne die notwendigen Voraussetzungen für die Kombination von Erholung und Animation des städtischen Raumes, mit einem besonderen Fokus auf das historische architektonische Erbe. Die Regularisierung und Integration des gesamten Raumes um Pelourinho mit dem bestehenden Gebäude stellt eine Priorität im Rehabilitationsprozess dar. (German) | |||||||||||||||
Property / summary: Das zu intervenierende Gebiet befindet sich im Herzen der Stadt, das gleiche degradiert und disqualifiziert, d. h. ohne die notwendigen Voraussetzungen für die Kombination von Erholung und Animation des städtischen Raumes, mit einem besonderen Fokus auf das historische architektonische Erbe. Die Regularisierung und Integration des gesamten Raumes um Pelourinho mit dem bestehenden Gebäude stellt eine Priorität im Rehabilitationsprozess dar. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Das zu intervenierende Gebiet befindet sich im Herzen der Stadt, das gleiche degradiert und disqualifiziert, d. h. ohne die notwendigen Voraussetzungen für die Kombination von Erholung und Animation des städtischen Raumes, mit einem besonderen Fokus auf das historische architektonische Erbe. Die Regularisierung und Integration des gesamten Raumes um Pelourinho mit dem bestehenden Gebäude stellt eine Priorität im Rehabilitationsprozess dar. (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 14:07, 13 December 2021
Project Q2895018 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | REHABILITATION OF THE PELOURINHO SQUARE |
Project Q2895018 in Portugal |
Statements
133,617.0 Euro
0 references
157,197.0 Euro
0 references
85.0 percent
0 references
1 November 2016
0 references
30 June 2017
0 references
MUNICÍPIO DE PENEDONO
0 references
A zona a intervencionar situa-se em pleno centro urbano, encontrando-se a mesma degradada e desqualificada, isto é, sem as devidas condições para a conjugação entre recreio e animação do espaço urbano, com particular enfoque no património arquitetónico histórico. A regularização e integração paisagística de todo o espaço circundante ao Pelourinho, com o edificado existente, representa uma prioridade no processo de reabilitação. (Portuguese)
0 references
The area to be intervened is located in the middle of the urban centre, being the same degraded and disqualified, that is, without the necessary conditions for the combination of recreation and animation of urban space, with particular focus on the historical architectural heritage. The regularisation and landscape integration of the entire space surrounding Pelourinho, with the existing building, represents a priority in the rehabilitation process. (English)
8 July 2021
0 references
La zone à intervenir est située au cœur de la ville, la même dégradée et disqualifiée, c’est-à-dire sans les conditions nécessaires à la combinaison des loisirs et de l’animation de l’espace urbain, avec un accent particulier sur le patrimoine architectural historique. La régularisation et l’intégration de l’ensemble de l’espace entourant Pelourinho, avec le bâtiment existant, représente une priorité dans le processus de réhabilitation. (French)
5 December 2021
0 references
Das zu intervenierende Gebiet befindet sich im Herzen der Stadt, das gleiche degradiert und disqualifiziert, d. h. ohne die notwendigen Voraussetzungen für die Kombination von Erholung und Animation des städtischen Raumes, mit einem besonderen Fokus auf das historische architektonische Erbe. Die Regularisierung und Integration des gesamten Raumes um Pelourinho mit dem bestehenden Gebäude stellt eine Priorität im Rehabilitationsprozess dar. (German)
13 December 2021
0 references
Penedono, União das freguesias de Penedono e Granja
0 references
Identifiers
NORTE-04-2316-FEDER-000021
0 references