Replacement of asbestos roofs – Escola Básica D. António da Costa (Q2882070): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Ersatz von Asbestabdeckungen – D. António da Costa Basic School | |||||||||||||||
Property / summary | |||||||||||||||
Der Antrag bezieht sich auf die D. António da Costa Basic School, eine Grundschule mit einer Kapazität von 50 Klassen, die von insgesamt 1.017 Schülern besucht wird. (German) | |||||||||||||||
Property / summary: Der Antrag bezieht sich auf die D. António da Costa Basic School, eine Grundschule mit einer Kapazität von 50 Klassen, die von insgesamt 1.017 Schülern besucht wird. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Der Antrag bezieht sich auf die D. António da Costa Basic School, eine Grundschule mit einer Kapazität von 50 Klassen, die von insgesamt 1.017 Schülern besucht wird. (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 12:18, 13 December 2021
Project Q2882070 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement of asbestos roofs – Escola Básica D. António da Costa |
Project Q2882070 in Portugal |
Statements
187,330.0 Euro
0 references
187,330.0 Euro
0 references
100.0 percent
0 references
1 January 2021
0 references
31 December 2021
0 references
MUNICÍPIO DE ALMADA
0 references
A candidatura é referente à Escola Básica D. António da Costa que é um estabelecimento de ensino básico com capacidade para 50 turmas, frequentado por um total de 1.017 alunos No que concerne a área abrangida pela operação, esta escola irá ter 2.620 m2 de cobertura de fibrocimento intervencionada/substituída e que significa 5,2 % da área total das 15 escolas que irão ter intervenção. (Portuguese)
0 references
The application refers to the Basic School D. António da Costa, which is a basic educational establishment with capacity for 50 maltas, attended by a total of 1,017 students With regard to the area covered by the operation, this school will have 2,620 m² of interventional/replaced fibrocement coverage, which means 5.2 % of the total area of the 15 schools that will have intervention. (English)
7 July 2021
0 references
La demande concerne l’école de base D. António da Costa, qui est une école de base d’une capacité de 50 classes, fréquentée par un total de 1 017 élèves. En ce qui concerne la zone couverte par l’opération, cette école aura une couverture d’intervention/remplacée de 2,620 m², ce qui représente 5,2 % de la superficie totale des 15 écoles qui bénéficieront de l’intervention. (French)
5 December 2021
0 references
Der Antrag bezieht sich auf die D. António da Costa Basic School, eine Grundschule mit einer Kapazität von 50 Klassen, die von insgesamt 1.017 Schülern besucht wird. (German)
13 December 2021
0 references
Almada, União das freguesias de Almada, Cova da Piedade, Pragal e Cacilhas
0 references
Identifiers
LISBOA-07-5673-FEDER-000200
0 references