Interior alteration, remodeling and adaptation of SCMM ERPI – 2nd Wing (Q2875731): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
Interne Änderung, Umbau und Anpassung des SCMM ERPI – Wing 2
Property / summary
 
Dieses Investitionsvorhaben besteht aus einer Reihe von Käufen von Waren und Dienstleistungen unterschiedlicher Art, aber mit dem alleinigen Zweck der Neuklassifizierung des Gebäudes namens 2. Wing, das für den Dienst des ERPI dieser Institution bestimmt ist.Um die Energieeffizienz des gesamten Komplexes zu verbessern, ist es beabsichtigt, ein UPAC-System – eine Einheit für die Erzeugung von Strom für den Eigenverbrauch – auf solar/photovoltaischer Basis zu installieren. (German)
Property / summary: Dieses Investitionsvorhaben besteht aus einer Reihe von Käufen von Waren und Dienstleistungen unterschiedlicher Art, aber mit dem alleinigen Zweck der Neuklassifizierung des Gebäudes namens 2. Wing, das für den Dienst des ERPI dieser Institution bestimmt ist.Um die Energieeffizienz des gesamten Komplexes zu verbessern, ist es beabsichtigt, ein UPAC-System – eine Einheit für die Erzeugung von Strom für den Eigenverbrauch – auf solar/photovoltaischer Basis zu installieren. (German) / rank
 
Normal rank
Property / summary: Dieses Investitionsvorhaben besteht aus einer Reihe von Käufen von Waren und Dienstleistungen unterschiedlicher Art, aber mit dem alleinigen Zweck der Neuklassifizierung des Gebäudes namens 2. Wing, das für den Dienst des ERPI dieser Institution bestimmt ist.Um die Energieeffizienz des gesamten Komplexes zu verbessern, ist es beabsichtigt, ein UPAC-System – eine Einheit für die Erzeugung von Strom für den Eigenverbrauch – auf solar/photovoltaischer Basis zu installieren. (German) / qualifier
 
point in time: 13 December 2021
Timestamp+2021-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:26, 13 December 2021

Project Q2875731 in Portugal
Language Label Description Also known as
English
Interior alteration, remodeling and adaptation of SCMM ERPI – 2nd Wing
Project Q2875731 in Portugal

    Statements

    0 references
    169,659.0 Euro
    0 references
    199,599.0 Euro
    0 references
    85.0 percent
    0 references
    1 July 2018
    0 references
    31 December 2021
    0 references
    SANTA CASA DA MISERICORDIA DE MONSANTO
    0 references
    0 references
    Este projeto de investimento é composto por um conjunto de aquisições de bens e serviços de diversas naturezas, mas com o único propósito de requalificar o edifício denominado como 2.ª Ala, destinado ao serviço da ERPI desta instituição.Simultaneamente, para melhorar a eficiência energética de todo o complexo, pretende-se instalar um sistema UPAC - unidade de produção de energia elétrica para autoconsumo, com base solar/fotovoltaica. (Portuguese)
    0 references
    This investment project is composed of a set of acquisitions of assets and services of various natures, but with the sole purpose of requalifying the building called the 2nd Wing, intended for the service of the ERPI of this institution.Simultaneously, to improve the energy efficiency of the entire complex, it is intended to install a UPAC system – electrical energy production unit for self-consumption, with solar/photovoltaic base. (English)
    7 July 2021
    0 references
    Ce projet d’investissement consiste en un ensemble d’achats de biens et de services de natures différentes, mais dans le seul but de reclasser le bâtiment appelé 2ème Escadre, destiné au service de l’ERPI de cette institution.Simultanément, afin d’améliorer l’efficacité énergétique de l’ensemble du complexe, il est prévu d’installer un système UPAC — une unité pour la production d’électricité pour autoconsommation, sur une base solaire/photovoltaïque. (French)
    4 December 2021
    0 references
    Dieses Investitionsvorhaben besteht aus einer Reihe von Käufen von Waren und Dienstleistungen unterschiedlicher Art, aber mit dem alleinigen Zweck der Neuklassifizierung des Gebäudes namens 2. Wing, das für den Dienst des ERPI dieser Institution bestimmt ist.Um die Energieeffizienz des gesamten Komplexes zu verbessern, ist es beabsichtigt, ein UPAC-System – eine Einheit für die Erzeugung von Strom für den Eigenverbrauch – auf solar/photovoltaischer Basis zu installieren. (German)
    13 December 2021
    0 references
    Idanha-a-Nova, União das freguesias de Monsanto e Idanha-a-Velha
    0 references

    Identifiers

    CENTRO-05-4842-FEDER-000180
    0 references