Versterking van aardverschuivingen in het kwartaal Boruna, stad Lom
Property / summary
 
Op basis van het engineering-geologisch en hydrologische rapport werd een investeringsproject opgesteld, dat samen met de ontwikkelingsplannen door de gemeente Lom werd gefinancierd. Het project voorziet in de bouw van een locatie: „VERSTERKING VAN PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN MET IDENTIFICATIENUMMER MON 2444238.92.01 EN DE SAMENGESTELDE PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN VAN MON 24,44238,92,01,01 EN MON 24,44238.92.01.02, GEREGISTREERD IN Boruna — GR. LOM", met inbegrip van de uitvoering van alle beheersactiviteiten, met inbegrip van het opstellen van documentatie over overheidsopdrachten, alsmede het toezicht op de bouw en het auteursrecht en informatie- en communicatiemaatregelen. Bouwwerkzaamheden zijn gepland om het grondwaterniveau te verlagen, evenals de bouw van een muur langs de kustlijn van de buurt, met een hoogte van 5,2 m en een lengte van 850 m. De muur zal worden gevoed met piloten F1200, verankerd aan het skateboard. Om het waterniveau in het lichaam van aardverschuivingen te verlagen, zijn er 2 drainageribs. Rioolrivier nr. 1, die een lengte heeft van 436 m en een diepte van 2 tot 3,5 m, begint boven de Perushtitsa-straat en daalt af aan de oever van de Donau. Drainage rib nr. 2, dat is 885,48 m lang en diepte van 2 m tot 4 m, begint boven de aardverschuiving uitslag, wandelingen langs de bodem van een bestaande slok en op Gurgulyat Straat lozen in de Donau. Er zijn ook 2 diepe afvoeren (putten) met een diameter van 6 m elk, uitgerust met 8 radiaal geïntegreerde horizontale boorputten (HSDS) elk 70 m voor het opvangen van het afvoerwater. Om het in de drainageschachten verzamelde water te verwijderen, is er voor elk van hen een stroom (lek) naar de Donau, uit metalen leidingen. Na de uitvoering van de bouwwerkzaamheden zal het bestaande bewakingssysteem (CIS) van de aardverschuivingen worden uitgebreid met het bouwen van 20 besturingsrails op de nieuw gebouwde bevestigingswand, een nieuw ondersteuningspunt voor observatie (re) en de bouw van 4 inclinometers. (Dutch)
Property / summary: Op basis van het engineering-geologisch en hydrologische rapport werd een investeringsproject opgesteld, dat samen met de ontwikkelingsplannen door de gemeente Lom werd gefinancierd. Het project voorziet in de bouw van een locatie: „VERSTERKING VAN PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN MET IDENTIFICATIENUMMER MON 2444238.92.01 EN DE SAMENGESTELDE PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN VAN MON 24,44238,92,01,01 EN MON 24,44238.92.01.02, GEREGISTREERD IN Boruna — GR. LOM", met inbegrip van de uitvoering van alle beheersactiviteiten, met inbegrip van het opstellen van documentatie over overheidsopdrachten, alsmede het toezicht op de bouw en het auteursrecht en informatie- en communicatiemaatregelen. Bouwwerkzaamheden zijn gepland om het grondwaterniveau te verlagen, evenals de bouw van een muur langs de kustlijn van de buurt, met een hoogte van 5,2 m en een lengte van 850 m. De muur zal worden gevoed met piloten F1200, verankerd aan het skateboard. Om het waterniveau in het lichaam van aardverschuivingen te verlagen, zijn er 2 drainageribs. Rioolrivier nr. 1, die een lengte heeft van 436 m en een diepte van 2 tot 3,5 m, begint boven de Perushtitsa-straat en daalt af aan de oever van de Donau. Drainage rib nr. 2, dat is 885,48 m lang en diepte van 2 m tot 4 m, begint boven de aardverschuiving uitslag, wandelingen langs de bodem van een bestaande slok en op Gurgulyat Straat lozen in de Donau. Er zijn ook 2 diepe afvoeren (putten) met een diameter van 6 m elk, uitgerust met 8 radiaal geïntegreerde horizontale boorputten (HSDS) elk 70 m voor het opvangen van het afvoerwater. Om het in de drainageschachten verzamelde water te verwijderen, is er voor elk van hen een stroom (lek) naar de Donau, uit metalen leidingen. Na de uitvoering van de bouwwerkzaamheden zal het bestaande bewakingssysteem (CIS) van de aardverschuivingen worden uitgebreid met het bouwen van 20 besturingsrails op de nieuw gebouwde bevestigingswand, een nieuw ondersteuningspunt voor observatie (re) en de bouw van 4 inclinometers. (Dutch) / rank
 
Normal rank
Property / summary: Op basis van het engineering-geologisch en hydrologische rapport werd een investeringsproject opgesteld, dat samen met de ontwikkelingsplannen door de gemeente Lom werd gefinancierd. Het project voorziet in de bouw van een locatie: „VERSTERKING VAN PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN MET IDENTIFICATIENUMMER MON 2444238.92.01 EN DE SAMENGESTELDE PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN VAN MON 24,44238,92,01,01 EN MON 24,44238.92.01.02, GEREGISTREERD IN Boruna — GR. LOM", met inbegrip van de uitvoering van alle beheersactiviteiten, met inbegrip van het opstellen van documentatie over overheidsopdrachten, alsmede het toezicht op de bouw en het auteursrecht en informatie- en communicatiemaatregelen. Bouwwerkzaamheden zijn gepland om het grondwaterniveau te verlagen, evenals de bouw van een muur langs de kustlijn van de buurt, met een hoogte van 5,2 m en een lengte van 850 m. De muur zal worden gevoed met piloten F1200, verankerd aan het skateboard. Om het waterniveau in het lichaam van aardverschuivingen te verlagen, zijn er 2 drainageribs. Rioolrivier nr. 1, die een lengte heeft van 436 m en een diepte van 2 tot 3,5 m, begint boven de Perushtitsa-straat en daalt af aan de oever van de Donau. Drainage rib nr. 2, dat is 885,48 m lang en diepte van 2 m tot 4 m, begint boven de aardverschuiving uitslag, wandelingen langs de bodem van een bestaande slok en op Gurgulyat Straat lozen in de Donau. Er zijn ook 2 diepe afvoeren (putten) met een diameter van 6 m elk, uitgerust met 8 radiaal geïntegreerde horizontale boorputten (HSDS) elk 70 m voor het opvangen van het afvoerwater. Om het in de drainageschachten verzamelde water te verwijderen, is er voor elk van hen een stroom (lek) naar de Donau, uit metalen leidingen. Na de uitvoering van de bouwwerkzaamheden zal het bestaande bewakingssysteem (CIS) van de aardverschuivingen worden uitgebreid met het bouwen van 20 besturingsrails op de nieuw gebouwde bevestigingswand, een nieuw ondersteuningspunt voor observatie (re) en de bouw van 4 inclinometers. (Dutch) / qualifier
 
point in time: 12 December 2021
Timestamp+2021-12-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:02, 12 December 2021

Project Q3885832 in Bulgaria
Language Label Description Also known as
English
Reinforcement of landslides in quarter Boruna, town of Lom
Project Q3885832 in Bulgaria

    Statements

    0 references
    7,224,802.56 Bulgarian lev
    0 references
    3,684,649.31 Euro
    1 December 2021
    0 references
    8,499,767.73 Bulgarian lev
    0 references
    4,334,881.54 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    26 March 2019
    0 references
    26 August 2021
    0 references
    0 references
    0 references

    42°36'26.64"N, 25°29'8.38"E
    0 references
    Въз основа на инженерно-геоложкия и хидроложки доклад е изработен инвестиционен проект, който заедно с устройствените планове е финансиран от община Лом. Проектът предвижда изграждане на обект: "УКРЕПВАНЕ НА ПЕРИОДИЧНО АКТИВНО СВЛАЧИЩЕ С ИДЕНТИФИКАЦИОНЕН № MON 24,44238,92,01 И СЪСТАВНИТЕ МУ ПЕРИОДИЧНО АКТИВНИ СВЛАЧИЩА С № MON 24,44238,92,01,01 И № MON 24,44238,92,01,02 РЕГИСТРИРАНИ В КВ. БОРУНА - ГР. ЛОМ”, в т.ч. изпълнение на всички дейности по управление, в т. ч. изготвяне на документация за обществените поръчки, както и осъществяване на строителен и авторски надзор и мерки по информация и комуникация. Предвидени са строителни работи за понижаване нивото на подпочвените води, както и изграждане на подпорна стена по бреговата линия на квартала, с височина 5,2 м и дължина 850м. Стената ще се фундира върху пилоти Ф1200, захванати с анкери към ската. За понижаване на водното ниво в тялото на свлачищата се предвиждат 2 дренажни ребра. Дренажно ребро №1, което е с дължина 436м и дълбочина от 2 до 3,5м, започва над ул. "Перущица"и слиза на брега на р.Дунав. Дренажно ребро №2, което е с дължина 885,48м и дълбочина от 2м до 4м, започва над свлачищния обрив, върви по дъното на съществуващо дере и по ул. "Гургулят" се зауства в р. Дунав. Предвиждат се и 2 дълбоки дренажни шахти (кладенци) с диаметър 6м всяка, оборудвани с по 8 броя радиално включени в нея хоризонтални сондажни дренажа (ХСД) с дължина 70м всеки, за събиране на дренажните води. За отвеждане на събраните в дренажните шахти води, за всяка от тях е предвиден отток (изтичало) до р.Дунав, от метални тръби. След изпълнение на СМР, ще се разшири съществуващата мониторинговата система (КИС) на свлачищата, като се изградят 20 контролни репери върху новоизградената подпорна стена, една нова опорна точка за наблюдение (ОТН) и изграждане на 4 бр. инклинометри. (Bulgarian)
    0 references
    On the basis of the engineering-geological and hydrological report, an investment project was drawn up, which together with the development plans was financed by the municipality of Lom. The project envisages the construction of a site: ‘STRENGTHENING OF PERIODIC ACTIVE LANDSLIDES WITH IDENTIFICATION NO MON 24,44238.92.01 AND ITS COMPOSITE PERIODIC ACTIVE LANDSLIDES OF MON 24,44238,92,01,01 AND MON 24,44238.92.01.02 REGISTERED IN Boruna — GR. LOM", including the implementation of all management activities, including preparation of public procurement documentation, as well as construction and copyright supervision and information and communication measures. Construction works are planned to lower the level of groundwater, as well as construction of a retaining wall along the coastline of the neighborhood, with a height of 5.2 m and a length of 850 m. The wall will be fed upon pilots F1200, anchored to the skateboard. To lower the water level in the body of landslides, there are 2 drainage ribs. Drainage rib No 1, which has a length of 436 m and a depth of 2 to 3.5 m, starts above Perushtitsa Street and descends on the shore of the Danube River. Drainage rib No 2, which is 885.48 m long and depth from 2 m to 4 m, starts above the landslide rash, walks along the bottom of an existing gullet and on Gurgulyat Street discharges into the Danube. There are also 2 deep drains (wells) with a diameter of 6 m each, equipped with 8 radially incorporated horizontal drilling drains (HSDs) 70 m each for collecting the drainage water. To remove the water collected in the drainage shafts, for each of them there is a flow (leak) to the Danube river, from metal pipes. After implementation of the construction works, the existing monitoring system (CIS) of the landslides will be expanded by building 20 control tracks on the newly built retaining wall, one new supporting point for observation (re) and construction of 4 inclinometers. (English)
    2 December 2021
    0 references
    Sur la base du rapport d’ingénierie-géologique et hydrologique, un projet d’investissement a été élaboré, qui, avec les plans de développement, a été financé par la commune de Lom. Le projet prévoit la construction d’un site: «RENFORCEMENT DES GLISSEMENTS DE TERRAIN ACTIFS PÉRIODIQUES PORTANT LE NUMÉRO D’IDENTIFICATION MON 2444238.92.01 ET SES GLISSEMENTS PÉRIODIQUES ACTIFS COMPOSITES DE MON 2444238,92,01 ET MON 24 44238.92.01.02 ENREGISTRÉS EN Boruna — GR. LOM", y compris la mise en œuvre de toutes les activités de gestion, y compris la préparation de la documentation relative aux marchés publics, ainsi que la supervision de la construction et du droit d’auteur et des mesures d’information et de communication. Des travaux de construction sont prévus pour abaisser le niveau des eaux souterraines, ainsi que la construction d’un mur de soutènement le long du littoral du quartier, d’une hauteur de 5,2 m et d’une longueur de 850 m. Le mur sera alimenté par les pilotes F1200, ancrés au skateboard. Pour abaisser le niveau d’eau dans le corps des glissements de terrain, il y a 2 côtes de drainage. Côte de drainage no 1, d’une longueur de 436 m et d’une profondeur de 2 à 3,5 m, commence au-dessus de la rue Perushtitsa et descend sur la rive du Danube. Côte de drainage no 2, qui fait 885,48 m de long et de profondeur de 2 m à 4 m, commence au-dessus de l’éruption du glissement de terrain, marche le long du fond d’un goélette existant et sur la rue Gurgulyat se déverse dans le Danube. Il y a également 2 drains profonds (puits) d’un diamètre de 6 m chacun, équipés de 8 drains horizontaux de forage (HSDS) intégrés radialement (HSDS) de 70 m chacun pour la collecte de l’eau de drainage. Pour enlever l’eau recueillie dans les puits de drainage, pour chacun d’eux il y a un écoulement (fuite) vers le Danube, des tuyaux métalliques. Après la mise en œuvre des travaux de construction, le système de surveillance (CIS) des glissements de terrain sera étendu en construisant 20 voies de contrôle sur le mur de soutènement nouvellement construit, un nouveau point d’appui pour l’observation (re) et la construction de 4 inclinomètres. (French)
    3 December 2021
    0 references
    Auf der Grundlage des ingenieur-geologischen und hydrologischen Berichts wurde ein Investitionsvorhaben erstellt, das zusammen mit den Entwicklungsplänen von der Gemeinde Lom finanziert wurde. Das Projekt sieht den Bau einer Baustelle vor: „STÄRKUNG PERIODISCHER AKTIVER ERDRUTSCHE MIT DER KENNNUMMER MON 24,44238.92.01 UND IHREN ZUSAMMENGESETZTEN PERIODISCHEN AKTIVEN ERDRUTSCHEN VON MON 24,44238,92,01,01 UND MON 24,44238.92.01.02 REGISTRIERT IN Boruna – GR. LOM", einschließlich der Durchführung aller Managementaktivitäten, einschließlich der Vorbereitung der Dokumentation des öffentlichen Auftragswesens sowie der Bau- und Urheberrechtsüberwachung sowie Informations- und Kommunikationsmaßnahmen. Bauarbeiten sind geplant, um den Grundwasserspiegel zu senken, sowie den Bau einer Stützmauer entlang der Küstenlinie des Viertels mit einer Höhe von 5,2 m und einer Länge von 850 m. Die Wand wird an Piloten F1200 gefüttert, die auf dem Skateboard verankert sind. Um den Wasserstand im Körper von Erdrutschen zu senken, gibt es 2 Entwässerungsrippen. Entwässerungsrippe Nr. 1, die eine Länge von 436 m und eine Tiefe von 2 bis 3,5 m hat, beginnt über der Perushtitsa Straße und steigt am Ufer der Donau ab. Die Entwässerungsrippe Nr. 2, die 885,48 m lang und tief von 2 m bis 4 m ist, beginnt über dem Erdrutschausschlag, geht entlang des Bodens eines bestehenden Gullets und auf der Gurgulyat-Straße fließt in die Donau ein. Darüber hinaus gibt es 2 tiefe Abflüsse (Wells) mit einem Durchmesser von je 6 m, ausgestattet mit 8 radial eingebauten horizontalen Bohrabläufen (HSDS) jeweils 70 m für die Entnahme des Abwassers. Um das in den Drainagewellen gesammelte Wasser zu entfernen, gibt es für jeden von ihnen eine Strömung (Leck) zur Donau, aus Metallrohren. Nach Durchführung der Bauarbeiten wird das bestehende Überwachungssystem (CIS) der Erdrutsche um den Bau von 20 Kontrollschienen an der neu errichteten Stützmauer erweitert, ein neuer Stützpunkt für die Beobachtung (Re) und den Bau von 4 Neigungsmessern. (German)
    4 December 2021
    0 references
    Op basis van het engineering-geologisch en hydrologische rapport werd een investeringsproject opgesteld, dat samen met de ontwikkelingsplannen door de gemeente Lom werd gefinancierd. Het project voorziet in de bouw van een locatie: „VERSTERKING VAN PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN MET IDENTIFICATIENUMMER MON 2444238.92.01 EN DE SAMENGESTELDE PERIODIEKE ACTIEVE AARDVERSCHUIVINGEN VAN MON 24,44238,92,01,01 EN MON 24,44238.92.01.02, GEREGISTREERD IN Boruna — GR. LOM", met inbegrip van de uitvoering van alle beheersactiviteiten, met inbegrip van het opstellen van documentatie over overheidsopdrachten, alsmede het toezicht op de bouw en het auteursrecht en informatie- en communicatiemaatregelen. Bouwwerkzaamheden zijn gepland om het grondwaterniveau te verlagen, evenals de bouw van een muur langs de kustlijn van de buurt, met een hoogte van 5,2 m en een lengte van 850 m. De muur zal worden gevoed met piloten F1200, verankerd aan het skateboard. Om het waterniveau in het lichaam van aardverschuivingen te verlagen, zijn er 2 drainageribs. Rioolrivier nr. 1, die een lengte heeft van 436 m en een diepte van 2 tot 3,5 m, begint boven de Perushtitsa-straat en daalt af aan de oever van de Donau. Drainage rib nr. 2, dat is 885,48 m lang en diepte van 2 m tot 4 m, begint boven de aardverschuiving uitslag, wandelingen langs de bodem van een bestaande slok en op Gurgulyat Straat lozen in de Donau. Er zijn ook 2 diepe afvoeren (putten) met een diameter van 6 m elk, uitgerust met 8 radiaal geïntegreerde horizontale boorputten (HSDS) elk 70 m voor het opvangen van het afvoerwater. Om het in de drainageschachten verzamelde water te verwijderen, is er voor elk van hen een stroom (lek) naar de Donau, uit metalen leidingen. Na de uitvoering van de bouwwerkzaamheden zal het bestaande bewakingssysteem (CIS) van de aardverschuivingen worden uitgebreid met het bouwen van 20 besturingsrails op de nieuw gebouwde bevestigingswand, een nieuw ondersteuningspunt voor observatie (re) en de bouw van 4 inclinometers. (Dutch)
    12 December 2021
    0 references
    България
    0 references

    Identifiers

    BG16M1OP002-4.003-0013
    0 references