Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin (Q3832241): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
Aanleg van WSS-infrastructuur in het aparte gebied dat wordt bediend door watervoorziening en riolering EOOD, Vidin
Property / summary
 
In totaal zijn voor de agglomeratie Vidin de volgende maatregelen gepland:-per component Watervoorziening: •vervanging van de bestaande loodpijp ph900 mm door PVC_O-buizen met een diameter F630mm, L = 10,372 km met PN 12,5 atm;•vervanging van de bestaande twee etherietbuizen f536 mm en van de bestaande twee stalen buizen f630 mm door f500 mm PVC_O-buizen met PN 12,5 atm en totale lengte L = 4,149 km; L totaal=14,521 km.-per component Afvalwaterinzameling is gepland: •Herbouw van een deel van Master Collector II met een eiprofiel van 1520/2400 mm en 1120/2150 mm. Het wordt vervangen door een GRP-kanaal met f1800 mm met lengte L = 1,356 km en PP-sectie 2x1000 mm met L = 94 m bij het overschrijden van de lijn; L totaal = 1,450 km.- per component Afvalwaterzuivering zijn geen investeringsmaatregelen voorzien. De RWZI is in aanbouw. (Dutch)
Property / summary: In totaal zijn voor de agglomeratie Vidin de volgende maatregelen gepland:-per component Watervoorziening: •vervanging van de bestaande loodpijp ph900 mm door PVC_O-buizen met een diameter F630mm, L = 10,372 km met PN 12,5 atm;•vervanging van de bestaande twee etherietbuizen f536 mm en van de bestaande twee stalen buizen f630 mm door f500 mm PVC_O-buizen met PN 12,5 atm en totale lengte L = 4,149 km; L totaal=14,521 km.-per component Afvalwaterinzameling is gepland: •Herbouw van een deel van Master Collector II met een eiprofiel van 1520/2400 mm en 1120/2150 mm. Het wordt vervangen door een GRP-kanaal met f1800 mm met lengte L = 1,356 km en PP-sectie 2x1000 mm met L = 94 m bij het overschrijden van de lijn; L totaal = 1,450 km.- per component Afvalwaterzuivering zijn geen investeringsmaatregelen voorzien. De RWZI is in aanbouw. (Dutch) / rank
 
Normal rank
Property / summary: In totaal zijn voor de agglomeratie Vidin de volgende maatregelen gepland:-per component Watervoorziening: •vervanging van de bestaande loodpijp ph900 mm door PVC_O-buizen met een diameter F630mm, L = 10,372 km met PN 12,5 atm;•vervanging van de bestaande twee etherietbuizen f536 mm en van de bestaande twee stalen buizen f630 mm door f500 mm PVC_O-buizen met PN 12,5 atm en totale lengte L = 4,149 km; L totaal=14,521 km.-per component Afvalwaterinzameling is gepland: •Herbouw van een deel van Master Collector II met een eiprofiel van 1520/2400 mm en 1120/2150 mm. Het wordt vervangen door een GRP-kanaal met f1800 mm met lengte L = 1,356 km en PP-sectie 2x1000 mm met L = 94 m bij het overschrijden van de lijn; L totaal = 1,450 km.- per component Afvalwaterzuivering zijn geen investeringsmaatregelen voorzien. De RWZI is in aanbouw. (Dutch) / qualifier
 
point in time: 10 December 2021
Timestamp+2021-12-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:51, 10 December 2021

Project Q3832241 in Bulgaria
Language Label Description Also known as
English
Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin
Project Q3832241 in Bulgaria

    Statements

    0 references
    15,246,929.81 Bulgarian lev
    0 references
    7,775,934.2 Euro
    1 December 2021
    0 references
    19,722,445.83 Bulgarian lev
    0 references
    10,058,447.37 Euro
    1 December 2021
    0 references
    0.77 percent
    0 references
    5 September 2019
    0 references
    5 March 2024
    0 references
    0 references
    0 references

    43°48'4.61"N, 22°40'46.16"E
    0 references
    Общо, за Агломерация Видин, се предвиждат следните мерки:-по компонент Водоснабдяване:•подмяна на съществуващия довеждащ водопровод ф900мм стомана с PVC_O тръби с диаметър Ф630mm, L = 10, 372 km с PN 12,5 atm;•подмяна на съществуващите две етернитови тръби ф536 mm и на съществуващите две стоманени тръби ф630 mm с ф500mm PVC_O тръби с PN 12,5 atm и обща дължина L = 4,149 km; L обща=14,521km.-по компонент Събиране на отпадъчни води се предвижда:•реконструкция на част от Главен Колектор II с яйцевиден профил 1520/2400 mm и 1120/2150 mm. Той ще бъде подменен с канал от GRP с ф1800mm с дължина L = 1,356km и участък с РР тръби 2xф1000mm с L =94m при преминаване под ж.п. линията; L обща=1,450 km.-по компонент Пречистване на отпадъчни води не са предвидени инвестиционни мерки. ПСОВ е в процес на изграждане. (Bulgarian)
    0 references
    In total, for the Vidin agglomeration, the following measures are foreseen:-by component Water supply: •replacement of the existing lead pipe ph900 mm with PVC_O pipes with diameter F630mm, L = 10.372 km with PN 12.5 atm;•replacement of the existing two etherite pipes f536 mm and of the existing two steel pipes f630 mm by f500 mm PVC_O pipes with PN 12.5 atm and total length L = 4.149 km; L total=14.521 km.-by component Wastewater collection is foreseen: •Reconstruction of a part of Master Collector II with an egg profile of 1520/2400 mm and 1120/2150 mm. It will be replaced by a GRP channel with f1800 mm with length L = 1.356 km and PP section 2x1000 mm with L =94 m when crossing the line; L total = 1.450 km.- by component Wastewater treatment no investment measures are foreseen. The WWTP is under construction. (English)
    2 December 2021
    0 references
    Au total, pour l’agglomération de Vidin, les mesures suivantes sont prévues:-par composant Approvisionnement en eau: • remplacement du tuyau de plomb existant ph900 mm par des tuyaux PVC_O de diamètre F630mm, L = 10,372 km par PN 12,5 atm;• remplacement des deux tuyaux en éthrite existants f536 mm et des deux tubes en acier f630 mm par f500 mm PVC_O avec PN 12,5 atm et longueur totale L = 4,149 km; L=14,521 km.-par composant La collecte des eaux usées est prévue: •Reconstruction d’une partie du Maître collecteur II avec un profil d’œuf de 1520/2400 mm et 1120/2150 mm. Il sera remplacé par un chenal GRP avec f1800 mm avec une longueur L = 1,356 km et une section PP 2x1000 mm avec L =94 m lors du franchissement de la ligne; L total = 1,450 km.- par composante Traitement des eaux usées Aucune mesure d’investissement n’est prévue. La station d’épuration est en cours de construction. (French)
    3 December 2021
    0 references
    Insgesamt sind für den Ballungsraum Vidin folgende Maßnahmen vorgesehen:-für Komponenten Wasserversorgung: • Ersatz des vorhandenen Bleirohres ph900 mm mit PVC_O-Rohren mit einem Durchmesser F630mm, L = 10,372 km mit PN 12,5 atm; • Ersatz der bestehenden zwei Etheritrohre f536 mm und der bestehenden zwei Stahlrohre f630 mm durch f500 mm PVC_O Rohre mit PN 12,5 atm und Gesamtlänge L = 4,49 km; L insgesamt=14,521 km.-für Komponenten Abwassersammlung ist vorgesehen: •Rekonstruktion eines Teils des Meistersammels II mit einem Eiprofil von 1520/2400 mm und 1120/2150 mm. Er wird durch einen GFK-Kanal mit f1800 mm mit Länge L = 1,356 km und PP-Abschnitt 2x1000 mm mit L =94 m beim Überqueren der Strecke ersetzt; L insgesamt = 1,450 km.- nach Komponenten Abwasserbehandlung sind keine Investitionsmaßnahmen vorgesehen. Das WWTP befindet sich im Aufbau. (German)
    4 December 2021
    0 references
    In totaal zijn voor de agglomeratie Vidin de volgende maatregelen gepland:-per component Watervoorziening: •vervanging van de bestaande loodpijp ph900 mm door PVC_O-buizen met een diameter F630mm, L = 10,372 km met PN 12,5 atm;•vervanging van de bestaande twee etherietbuizen f536 mm en van de bestaande twee stalen buizen f630 mm door f500 mm PVC_O-buizen met PN 12,5 atm en totale lengte L = 4,149 km; L totaal=14,521 km.-per component Afvalwaterinzameling is gepland: •Herbouw van een deel van Master Collector II met een eiprofiel van 1520/2400 mm en 1120/2150 mm. Het wordt vervangen door een GRP-kanaal met f1800 mm met lengte L = 1,356 km en PP-sectie 2x1000 mm met L = 94 m bij het overschrijden van de lijn; L totaal = 1,450 km.- per component Afvalwaterzuivering zijn geen investeringsmaatregelen voorzien. De RWZI is in aanbouw. (Dutch)
    10 December 2021
    0 references
    Видин
    0 references

    Identifiers

    BG16M1OP002-1.016-0006
    0 references