Replacement of the Coverages of the School EB 2/3 de Maceda (Q3357367): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operation “Replacement of the Coverages of the School EB 2/3 de Maceda” comes in compliance with the Resolution of the Assembly of the Republic No. 24/2003, of 2 April, and to Law No. 2/2011, of 9 February, for the removal of fibrocement and to give the building greater theoretical comfort and conditions of tightness., translated_summary)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Remplacement des couvertures de l’école EB 2/3 de Maceda
Property / summary
 
L’opération «Remplacement des couvertures de l’école EB 2/3 de Maceda» est conforme à la résolution de l’Assemblée de la République no 24/2003, du 2 avril, et à la loi no 2/2011, du 9 février, pour l’élimination du fibrocement et pour donner au bâtiment un plus grand confort théorique et des conditions d’étanchéité. (French)
Property / summary: L’opération «Remplacement des couvertures de l’école EB 2/3 de Maceda» est conforme à la résolution de l’Assemblée de la République no 24/2003, du 2 avril, et à la loi no 2/2011, du 9 février, pour l’élimination du fibrocement et pour donner au bâtiment un plus grand confort théorique et des conditions d’étanchéité. (French) / rank
 
Normal rank
Property / summary: L’opération «Remplacement des couvertures de l’école EB 2/3 de Maceda» est conforme à la résolution de l’Assemblée de la République no 24/2003, du 2 avril, et à la loi no 2/2011, du 9 février, pour l’élimination du fibrocement et pour donner au bâtiment un plus grand confort théorique et des conditions d’étanchéité. (French) / qualifier
 
point in time: 7 December 2021
Timestamp+2021-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:32, 7 December 2021

Project Q3357367 in Portugal
Language Label Description Also known as
English
Replacement of the Coverages of the School EB 2/3 de Maceda
Project Q3357367 in Portugal

    Statements

    0 references
    129,877.0 Euro
    0 references
    129,877.0 Euro
    0 references
    100.0 percent
    0 references
    12 July 2021
    0 references
    30 October 2021
    0 references
    MUNICÍPIO DE OVAR
    0 references
    A operação "Substituição das Coberturas da Escola EB 2/3 de Maceda" vem dar cumprimento à Resolução da Assembleia da República n.º 24/2003, de 2 de abril, e à Lei n.º 2/2011, de 9 de fevereiro, para a remoção de fibrocimento e conferir ao edifício maior conforto térmico e condições de estanquidade. (Portuguese)
    0 references
    The operation “Replacement of the Coverages of the School EB 2/3 de Maceda” comes in compliance with the Resolution of the Assembly of the Republic No. 24/2003, of 2 April, and to Law No. 2/2011, of 9 February, for the removal of fibrocement and to give the building greater theoretical comfort and conditions of tightness. (English)
    29 November 2021
    0 references
    L’opération «Remplacement des couvertures de l’école EB 2/3 de Maceda» est conforme à la résolution de l’Assemblée de la République no 24/2003, du 2 avril, et à la loi no 2/2011, du 9 février, pour l’élimination du fibrocement et pour donner au bâtiment un plus grand confort théorique et des conditions d’étanchéité. (French)
    7 December 2021
    0 references
    Ovar, Região de Aveiro, Centro
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000277
    0 references