Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana) (Q2982936): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Rénovation des réseaux d’approvisionnement en eau (Ribeira Brava, Câmara de Lobos, Machico et Santana)
Property / summary
 
L’opération vise à corriger les situations opérationnelles identifiées (défaillances d’approvisionnement), consistant à remplacer des tronçons de réseaux sous-dimensionnés où il y a des pressions non ajustées, un faible débit. La construction de 2 EE permettra une augmentation de la capacité de distribution, afin de remédier aux pénuries de pression d’approvisionnement dans ces zones, le réseau mis en place s’avérant insuffisant pour répondre à la consommation. (French)
Property / summary: L’opération vise à corriger les situations opérationnelles identifiées (défaillances d’approvisionnement), consistant à remplacer des tronçons de réseaux sous-dimensionnés où il y a des pressions non ajustées, un faible débit. La construction de 2 EE permettra une augmentation de la capacité de distribution, afin de remédier aux pénuries de pression d’approvisionnement dans ces zones, le réseau mis en place s’avérant insuffisant pour répondre à la consommation. (French) / rank
 
Normal rank
Property / summary: L’opération vise à corriger les situations opérationnelles identifiées (défaillances d’approvisionnement), consistant à remplacer des tronçons de réseaux sous-dimensionnés où il y a des pressions non ajustées, un faible débit. La construction de 2 EE permettra une augmentation de la capacité de distribution, afin de remédier aux pénuries de pression d’approvisionnement dans ces zones, le réseau mis en place s’avérant insuffisant pour répondre à la consommation. (French) / qualifier
 
point in time: 7 December 2021
Timestamp+2021-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:58, 7 December 2021

Project Q2982936 in Portugal
Language Label Description Also known as
English
Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana)
Project Q2982936 in Portugal

    Statements

    0 references
    521,867.0 Euro
    0 references
    613,962.0 Euro
    0 references
    85.0 percent
    0 references
    5 November 2019
    0 references
    28 February 2021
    0 references
    A.R.M. - ÁGUAS E RESÍDUOS DA MADEIRA, S.A.
    0 references
    0 references
    0 references
    A Operação visa correção de situações operacionais identificadas (falhas abastecimento), que consistem, na substituição de troços de redes subdimensionados, nos quais se registam pressões desajustadas, caudal reduzido. A construção de 2 EE permitirá o aumento da capacidade de distribuição, solucionar as faltas de pressão no abastecimento naquelas zonas, uma vez que a rede implementada se revela insuficiente para satisfazer os consumos. (Portuguese)
    0 references
    The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption. (English)
    9 July 2021
    0 references
    L’opération vise à corriger les situations opérationnelles identifiées (défaillances d’approvisionnement), consistant à remplacer des tronçons de réseaux sous-dimensionnés où il y a des pressions non ajustées, un faible débit. La construction de 2 EE permettra une augmentation de la capacité de distribution, afin de remédier aux pénuries de pression d’approvisionnement dans ces zones, le réseau mis en place s’avérant insuffisant pour répondre à la consommation. (French)
    7 December 2021
    0 references

    Identifiers

    POSEUR-03-2012-FC-001421
    0 references