Interventions at the Lands of Bouro (Daru) (Q2982193): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Interventions dans la SAR de Terras de Bouro (DARU)
Property / summary
 
Cette opération vise à réduire la pollution urbaine dans le plan d’eau de la rivière Homem (HMWB Jusante B. Vilarinho Furnas), en mettant particulièrement l’accent sur le respect intégral de la directive 91/271/CEE du 21 mai 1991 relative au traitement des eaux urbaines résiduaires (UWWT) grâce à la construction de la station d’épuration des eaux urbaines résiduaires de Bouro Land ainsi qu’à l’installation d’une station de levage et d’un intercepteur de 4,43 km pour se connecter aux systèmes existants de «faible». (French)
Property / summary: Cette opération vise à réduire la pollution urbaine dans le plan d’eau de la rivière Homem (HMWB Jusante B. Vilarinho Furnas), en mettant particulièrement l’accent sur le respect intégral de la directive 91/271/CEE du 21 mai 1991 relative au traitement des eaux urbaines résiduaires (UWWT) grâce à la construction de la station d’épuration des eaux urbaines résiduaires de Bouro Land ainsi qu’à l’installation d’une station de levage et d’un intercepteur de 4,43 km pour se connecter aux systèmes existants de «faible». (French) / rank
 
Normal rank
Property / summary: Cette opération vise à réduire la pollution urbaine dans le plan d’eau de la rivière Homem (HMWB Jusante B. Vilarinho Furnas), en mettant particulièrement l’accent sur le respect intégral de la directive 91/271/CEE du 21 mai 1991 relative au traitement des eaux urbaines résiduaires (UWWT) grâce à la construction de la station d’épuration des eaux urbaines résiduaires de Bouro Land ainsi qu’à l’installation d’une station de levage et d’un intercepteur de 4,43 km pour se connecter aux systèmes existants de «faible». (French) / qualifier
 
point in time: 7 December 2021
Timestamp+2021-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:52, 7 December 2021

Project Q2982193 in Portugal
Language Label Description Also known as
English
Interventions at the Lands of Bouro (Daru)
Project Q2982193 in Portugal

    Statements

    0 references
    0 references
    1,150,640.0 Euro
    0 references
    1,353,694.0 Euro
    0 references
    85.0 percent
    0 references
    23 March 2018
    0 references
    31 March 2021
    0 references
    ÁGUAS DO NORTE, S.A.
    0 references
    Q3006399 (Deleted Item)
    0 references
    0 references

    41°43'7.28"N, 8°18'29.74"W
    0 references
    Esta Operação visa a redução da poluição urbana na massa de água do rio Homem (HMWB – Jusante B. Vilarinho Furnas), com especial enfoque no integral cumprimento da Diretiva 91/271/CEE de 21-05-1991, relativa ao Tratamento de Águas Residuais Urbanas (DARU) através da construção da ETAR de Terras de Bouro bem como, a instalação de uma estação elevatória e 4,43 Km de intercetor para efetuar a ligação aos sistemas em "baixa" existentes. (Portuguese)
    0 references
    This operation aims to reduce urban pollution in the mass of water in the Man River (HMWB Jusante B. Vilarinho Furnas), with a special focus on full compliance with Directive 91/271/EEC of 21-05-1991 on the Treatment of Urban Waste Water (Daru) through the construction of the Bouro Land treatment plant as well as the installation of a lift station and 4.43 Km interceptor to connect to existing systems at low level. (English)
    9 July 2021
    0 references
    Cette opération vise à réduire la pollution urbaine dans le plan d’eau de la rivière Homem (HMWB Jusante B. Vilarinho Furnas), en mettant particulièrement l’accent sur le respect intégral de la directive 91/271/CEE du 21 mai 1991 relative au traitement des eaux urbaines résiduaires (UWWT) grâce à la construction de la station d’épuration des eaux urbaines résiduaires de Bouro Land ainsi qu’à l’installation d’une station de levage et d’un intercepteur de 4,43 km pour se connecter aux systèmes existants de «faible». (French)
    7 December 2021
    0 references
    Terras de Bouro
    0 references

    Identifiers

    POSEUR-03-2012-FC-000274
    0 references