Maintenance of the Dunar Ecosystem of Mira Beach (Q2981463): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Entretien de l’écosystème Dunar de Praia de Mira | |||||||||||||||
Property / summary | |||||||||||||||
Le projet vise la récupération du système des dunes entre la dune au sud du marginal et le dernier support de la plage (d’une longueur de 680 mètres), avec des solutions pour la stabilisation et la protection du cordon des dunes, grâce à l’utilisation de passerelles. (French) | |||||||||||||||
Property / summary: Le projet vise la récupération du système des dunes entre la dune au sud du marginal et le dernier support de la plage (d’une longueur de 680 mètres), avec des solutions pour la stabilisation et la protection du cordon des dunes, grâce à l’utilisation de passerelles. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Le projet vise la récupération du système des dunes entre la dune au sud du marginal et le dernier support de la plage (d’une longueur de 680 mètres), avec des solutions pour la stabilisation et la protection du cordon des dunes, grâce à l’utilisation de passerelles. (French) / qualifier | |||||||||||||||
point in time: 7 December 2021
|
Revision as of 06:52, 7 December 2021
Project Q2981463 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Maintenance of the Dunar Ecosystem of Mira Beach |
Project Q2981463 in Portugal |
Statements
124,345.0 Euro
0 references
149,834.0 Euro
0 references
82.99 percent
0 references
9 October 2019
0 references
9 October 2020
0 references
MUNICÍPIO DE MIRA
0 references
Q2990371 (Deleted Item)
0 references
O projeto objetiva-se na recuperação do sistema dunar entre a duna a sul da marginal e o último apoio da praia (com uma extensão de 680 metros), com soluções de estabilização e proteção do cordão dunar, através do recurso à implementação de passadiços. (Portuguese)
0 references
The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English)
9 July 2021
0 references
Le projet vise la récupération du système des dunes entre la dune au sud du marginal et le dernier support de la plage (d’une longueur de 680 mètres), avec des solutions pour la stabilisation et la protection du cordon des dunes, grâce à l’utilisation de passerelles. (French)
7 December 2021
0 references
Mira, Praia de Mira
0 references
Identifiers
POSEUR-02-1809-FC-000069
0 references