(Created claim: summary (P836): The project concerns the reconstruction of 2 water treatment plants located in the municipality of Stepnica (SUW Miłowo and SUW Total). The investment will be implemented partly in the “design and demolition” formula (renovation and refurbishment of the water treatment plant, with the maintenance of SUW construction works), and its completion is scheduled for March 2019. the scope of the project related to the placement of potable water tanks wi...) |
||
Property / summary | |||
The project concerns the reconstruction of 2 water treatment plants located in the municipality of Stepnica (SUW Miłowo and SUW Total). The investment will be implemented partly in the “design and demolition” formula (renovation and refurbishment of the water treatment plant, with the maintenance of SUW construction works), and its completion is scheduled for March 2019. the scope of the project related to the placement of potable water tanks will be carried out in the ‘exploduj’ formula (the municipality has construction permits in this regard). The project is planned to perform 4 tasks: 1. Development of an application documentation for a project (Feasibility Study and Request) 2. The preparation of the construction project and the construction works covering (the scope is the same for both SUW): The development of a construction project; Renovation of wells; — technological installations; Sanitary installations; Construction works; — electrical and AKPiA; Placement of potable water tanks (two membrane cylindrical containers for drinking water storage in the SUW area — range on the basis of the construction plan already developed and building permits). 3. Investment supervision 4. Promotion of the project. the main project is the state of improvement of the quality of water provided to the residents of the Municipality of Stepnica through the conversion of two water treatment plants. The specific objectives are as follows: — improve the health status of the 4535 inhabitants of the municipality of Stepnica; Increase the level of visitor satisfaction for local visitors. The project will contribute to the following indicators: 1. product: Number of water treatment plants supported by 2; The number of additional persons benefiting from an improved supply of water to 4535 persons; 2th result: Anticipated number of persons benefiting from an improved supply of water supply by 4535 persons. The investment will be carried out within the agglomeration of Stepnica with a population of 6000 p.e.. (English) | |||
Property / summary: The project concerns the reconstruction of 2 water treatment plants located in the municipality of Stepnica (SUW Miłowo and SUW Total). The investment will be implemented partly in the “design and demolition” formula (renovation and refurbishment of the water treatment plant, with the maintenance of SUW construction works), and its completion is scheduled for March 2019. the scope of the project related to the placement of potable water tanks will be carried out in the ‘exploduj’ formula (the municipality has construction permits in this regard). The project is planned to perform 4 tasks: 1. Development of an application documentation for a project (Feasibility Study and Request) 2. The preparation of the construction project and the construction works covering (the scope is the same for both SUW): The development of a construction project; Renovation of wells; — technological installations; Sanitary installations; Construction works; — electrical and AKPiA; Placement of potable water tanks (two membrane cylindrical containers for drinking water storage in the SUW area — range on the basis of the construction plan already developed and building permits). 3. Investment supervision 4. Promotion of the project. the main project is the state of improvement of the quality of water provided to the residents of the Municipality of Stepnica through the conversion of two water treatment plants. The specific objectives are as follows: — improve the health status of the 4535 inhabitants of the municipality of Stepnica; Increase the level of visitor satisfaction for local visitors. The project will contribute to the following indicators: 1. product: Number of water treatment plants supported by 2; The number of additional persons benefiting from an improved supply of water to 4535 persons; 2th result: Anticipated number of persons benefiting from an improved supply of water supply by 4535 persons. The investment will be carried out within the agglomeration of Stepnica with a population of 6000 p.e.. (English) / rank | |||
Normal rank |
Revision as of 10:14, 11 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of 2 water treatment plants in the municipality of Stepnica |
Project in Poland financed by DG Regio |
Statements
2,645,560.7 zloty
0 references
4,181,721.77 zloty
0 references
85.0 percent
0 references
26 October 2016
0 references
30 August 2019
0 references
GMINA STEPNICA
0 references
Przedmiotem projektu jest przebudowa 2 stacji uzdatniania wody zlokalizowanych na terenie Gminy Stepnica (SUW Miłowo i SUW Łąka). Inwestycja będzie realizowana częściowo w formule „zaprojektuj i wybuduj” (w zakresie remontu i modernizacji instalacji technologicznych uzdatniania wody wraz z przeprowadzeniem prac remontowo-budowlanych obiektów SUW), a jej zakończenie zaplanowano na marzec 2019 r. Zakres projektu związany z posadowieniem zbiorników na wodę pitną będzie realizowany w formule „wybuduj” (gmina posiada pozwolenia na budowę w tym zakresie). W ramach projektu zaplanowano wykonanie 4 zadań: 1. Opracowanie dokumentacji aplikacyjnej dla projektu (Studium Wykonalności oraz wniosek) 2. Przygotowanie projektu budowlanego oraz roboty budowlane obejmujące (zakres jest analogiczny w odniesieniu do obydwu SUW): - opracowanie projektu budowlanego; - remont studni; - instalacje technologiczne; - instalacje sanitarne; - prace budowlane; - prace elektryczne i AKPiA; - posadowienie zbiorników na wodę pitną (dwóch zbiorników cylindrycznych membranowych posadowionych na płycie żelbetowej do magazynowania wody pitnej na terenie SUW – zakres realizowany na podstawie opracowanego już projektu budowlanego i pozwolenia na budowę). 3. Nadzór inwestorski 4. Promocję projektu Celem głównym projektu jest stanu poprawa jakości wody dostarczanej mieszkańcom Gminy Stepnica poprzez przebudowę dwóch stacji uzdatniania wody. Celami szczegółowymi są: - poprawa stanu zdrowia 4535 mieszkańców Gminy Stepnica; -zwiększenie poziomu zadowolenia turystów odwiedzających gminę. Projekt przyczyni się do realizacji następujących wskaźników: 1. produktu: - liczba wspartych stacji uzdatniania wody–2 szt.; - liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę–4535 osób; 2. rezultatu: - przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę–4535 osób. Inwestycja będzie realizowana na terenie aglomeracji Stepnica o wielkości 6000 RLM. (Polish)
0 references
The project concerns the reconstruction of 2 water treatment plants located in the municipality of Stepnica (SUW Miłowo and SUW Total). The investment will be implemented partly in the “design and demolition” formula (renovation and refurbishment of the water treatment plant, with the maintenance of SUW construction works), and its completion is scheduled for March 2019. the scope of the project related to the placement of potable water tanks will be carried out in the ‘exploduj’ formula (the municipality has construction permits in this regard). The project is planned to perform 4 tasks: 1. Development of an application documentation for a project (Feasibility Study and Request) 2. The preparation of the construction project and the construction works covering (the scope is the same for both SUW): The development of a construction project; Renovation of wells; — technological installations; Sanitary installations; Construction works; — electrical and AKPiA; Placement of potable water tanks (two membrane cylindrical containers for drinking water storage in the SUW area — range on the basis of the construction plan already developed and building permits). 3. Investment supervision 4. Promotion of the project. the main project is the state of improvement of the quality of water provided to the residents of the Municipality of Stepnica through the conversion of two water treatment plants. The specific objectives are as follows: — improve the health status of the 4535 inhabitants of the municipality of Stepnica; Increase the level of visitor satisfaction for local visitors. The project will contribute to the following indicators: 1. product: Number of water treatment plants supported by 2; The number of additional persons benefiting from an improved supply of water to 4535 persons; 2th result: Anticipated number of persons benefiting from an improved supply of water supply by 4535 persons. The investment will be carried out within the agglomeration of Stepnica with a population of 6000 p.e.. (English)
0 references
Identifiers
RPZP.03.05.00-32-C005/18