Rebuilding and changing the use of the building in the Łużycka street 91 in Gryfinno (Q139039): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The subject of the study is a project to rebuild and change the use of a building in the Łużycka Street 91 in Gryfinno to the Job Centre. The building is located within the boundaries of the plot No ewid. 236/2, rim 0005 at ul. Lusatia 91 in Gryfinno. The building was built in the mid-70s as a backhaul facility. The building is a free-standing building in the shape of a rectangle. The site is a ground floor building, partly podpiwek with a flat...) |
||
Property / summary | |||
The subject of the study is a project to rebuild and change the use of a building in the Łużycka Street 91 in Gryfinno to the Job Centre. The building is located within the boundaries of the plot No ewid. 236/2, rim 0005 at ul. Lusatia 91 in Gryfinno. The building was built in the mid-70s as a backhaul facility. The building is a free-standing building in the shape of a rectangle. The site is a ground floor building, partly podpiwek with a flat old roof and its technical condition is bad. In order to enable the creation of ZAZ’s work, deep construction and fitting-out work is needed, which will create the place where people with a disability (ON), therapeutics and members of the son will be able to live and work. The modernisation works will include, inter alia, internal infrastructure, external infrastructure (including connection to existing water and sewage networks, new external CO (from a node in an internet user’s building) and electric connection from ZK to a transformer station, installation of c.o., feeding of ventilation heaters, cold and domestic hot water, sanitary sewage, hydrant, air-conditioning with direct evaporation, electric ventilation (emergency lighting: the project also provides for the purchase and assembly of the equipment which will be the basis for the activation of “ZAiKS”. in total, 5 phases of the investment, which shall specify in detail the timetable of work and the expenditure specified in the budget, will also be purchased and assembled. At the end of the project, no later than 12 months from the end of the project, the infrastructure in the assisted infrastructure will be launched immediately after the completion of the project. (English) | |||
Property / summary: The subject of the study is a project to rebuild and change the use of a building in the Łużycka Street 91 in Gryfinno to the Job Centre. The building is located within the boundaries of the plot No ewid. 236/2, rim 0005 at ul. Lusatia 91 in Gryfinno. The building was built in the mid-70s as a backhaul facility. The building is a free-standing building in the shape of a rectangle. The site is a ground floor building, partly podpiwek with a flat old roof and its technical condition is bad. In order to enable the creation of ZAZ’s work, deep construction and fitting-out work is needed, which will create the place where people with a disability (ON), therapeutics and members of the son will be able to live and work. The modernisation works will include, inter alia, internal infrastructure, external infrastructure (including connection to existing water and sewage networks, new external CO (from a node in an internet user’s building) and electric connection from ZK to a transformer station, installation of c.o., feeding of ventilation heaters, cold and domestic hot water, sanitary sewage, hydrant, air-conditioning with direct evaporation, electric ventilation (emergency lighting: the project also provides for the purchase and assembly of the equipment which will be the basis for the activation of “ZAiKS”. in total, 5 phases of the investment, which shall specify in detail the timetable of work and the expenditure specified in the budget, will also be purchased and assembled. At the end of the project, no later than 12 months from the end of the project, the infrastructure in the assisted infrastructure will be launched immediately after the completion of the project. (English) / rank | |||
Normal rank |
Revision as of 10:13, 11 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Rebuilding and changing the use of the building in the Łużycka street 91 in Gryfinno |
Project in Poland financed by DG Regio |
Statements
4,363,622.5 zloty
0 references
1,047,269.3999999999 Euro
0.24 Euro
13 January 2020
0 references
6,565,072.39 zloty
0 references
1,575,617.3735999998 Euro
0.24 Euro
13 January 2020
0 references
85.0 percent
0 references
6 July 2017
0 references
31 December 2018
0 references
POWIAT GRYFIŃSKI
0 references
Przedmiotem opracowania jest projekt dotyczący przebudowy i zmiany sposobu użytkowania budynku przy ulicy Łużyckiej 91 w Gryfinie na Zakład Aktywności Zawodowej. Budynek położony jest w granicach działki nr ewid. 236/2, obręb 0005 położonej przy ul. Łużyckiej 91 w Gryfinie. Budynek został wybudowany w połowie lat 70-tych XX wieku jako obiekt o konstrukcji szkieletowej. Budynek stanowi zabudowę wolno stojącą w kształcie prostokąta. Obiekt jest budynkiem parterowym, częściowo podpiwniczony z płaskim dachem dwuspadowym a jego stan techniczny jest zły. Aby w obiekcie mógł funkcjonować ZAZ potrzebne są głębokie prace budowlane i wyposażeniowe, które stworzą miejsce gdzie będą mogły przebywać i pracować osoby niepełnosprawne (ON), terapeuci oraz członkowie rodzin ON. W zakres prac modernizacyjnych wejdą m.in. infrastruktura wewnętrzna, infrastruktura zewnętrzna (w tym podłączenie do istniejących sieci wod. i kanalizacyjnych, nową instalację zewnętrzną CO ( z węzła w budynku internatu) i przyłącze elektryczne od ZK przy stacji transformatorowej, instalacja c.o., zasilenia nagrzewnic wentylacyjnych, zimnej i ciepłej wody użytkowej, kanalizacji sanitarnej, hydrantowa, klimatyzacji z bezpośrednim odparowaniem, wentylacji mechanicznej, elektryczne (oświetlenia awaryjnego: ewakuacyjnego, kierunkowego i zapasowego, gniazd wtykowych 230 V, siły 400/230V, ochrony od porażeń, połączeń wyrównawczych, odgromową, ochrony przepięciowej).W ramach projektu przewidziano także zakup i montaż wyposażania, które stanie się podstawą do uruchomienia ZAZ-u. W sumie wykonanych zostanie 5 etapów inwestycji, które określa szczegółowo harmonogram prac i wydatków określonych w budżecie. Docelowa dział. we wspartej infrastr. zostanie uruchomiona od razu po zakończeniu prac inwest.- nie później niż 12 m-cy od zakończenia realizacji projektu. (Polish)
0 references
The subject of the study is a project to rebuild and change the use of a building in the Łużycka Street 91 in Gryfinno to the Job Centre. The building is located within the boundaries of the plot No ewid. 236/2, rim 0005 at ul. Lusatia 91 in Gryfinno. The building was built in the mid-70s as a backhaul facility. The building is a free-standing building in the shape of a rectangle. The site is a ground floor building, partly podpiwek with a flat old roof and its technical condition is bad. In order to enable the creation of ZAZ’s work, deep construction and fitting-out work is needed, which will create the place where people with a disability (ON), therapeutics and members of the son will be able to live and work. The modernisation works will include, inter alia, internal infrastructure, external infrastructure (including connection to existing water and sewage networks, new external CO (from a node in an internet user’s building) and electric connection from ZK to a transformer station, installation of c.o., feeding of ventilation heaters, cold and domestic hot water, sanitary sewage, hydrant, air-conditioning with direct evaporation, electric ventilation (emergency lighting: the project also provides for the purchase and assembly of the equipment which will be the basis for the activation of “ZAiKS”. in total, 5 phases of the investment, which shall specify in detail the timetable of work and the expenditure specified in the budget, will also be purchased and assembled. At the end of the project, no later than 12 months from the end of the project, the infrastructure in the assisted infrastructure will be launched immediately after the completion of the project. (English)
0 references
Identifiers
RPZP.09.02.00-32-0010/16
0 references