Construction of a 900 kW photovoltaic power plant in Turkey (Q137703): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project consists of the construction of a 900 kW photovoltaic power plant with associated infrastructure on plot 8/55 in Turowo, the municipality of Szczecin, the District of Szczecinek, the province of Zachodniopomorskie Province. The installation will be located in the vicinity of existing construction works. The investment will include: installation of solar panels on the ground, performance of an external energy installation, subdivision...) |
||
Property / summary | |||
The project consists of the construction of a 900 kW photovoltaic power plant with associated infrastructure on plot 8/55 in Turowo, the municipality of Szczecin, the District of Szczecinek, the province of Zachodniopomorskie Province. The installation will be located in the vicinity of existing construction works. The investment will include: installation of solar panels on the ground, performance of an external energy installation, subdivision of the prefabricated container block with a transformer and construction of a medium-voltage connection. The entity in charge of the project is BK-Wind Sp. z o. o.. the electricity produced will reach the average 15 kV line according to the signed connection agreement with the energy operator — Energa Operator S.A. Realised project is stationary. (English) | |||
Property / summary: The project consists of the construction of a 900 kW photovoltaic power plant with associated infrastructure on plot 8/55 in Turowo, the municipality of Szczecin, the District of Szczecinek, the province of Zachodniopomorskie Province. The installation will be located in the vicinity of existing construction works. The investment will include: installation of solar panels on the ground, performance of an external energy installation, subdivision of the prefabricated container block with a transformer and construction of a medium-voltage connection. The entity in charge of the project is BK-Wind Sp. z o. o.. the electricity produced will reach the average 15 kV line according to the signed connection agreement with the energy operator — Energa Operator S.A. Realised project is stationary. (English) / rank | |||
Normal rank |
Revision as of 10:05, 11 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a 900 kW photovoltaic power plant in Turkey |
Project in Poland financed by DG Regio |
Statements
2,236,943.31 zloty
0 references
4,453,830.0 zloty
0 references
80.04 percent
0 references
1 April 2017
0 references
6 March 2018
0 references
BK-WIND SPÓŁKA Z OGRANICZONĄ ODPOWIDZIALNOŚCIĄ
0 references
Przedmiotem projektu jest budowa elektrowni fotowoltaicznej o mocy 900 kW wraz z infrastrukturą towarzyszącą na działce 8/55 w miejscowości Turowo, gmina wiejska Szczecinek, powiat szczecinecki, województwo zachodniopomorskie. Instalacja umieszczona zostanie na gruncie w sąsiedztwie istniejących obiektów budowlanych. W skład inwestycji wejdzie: montaż paneli fotowoltaicznych na gruncie, wykonanie zewnętrznej instalacji energetycznej, posadowienie prefabrykowanego kontenera inwertera wraz z transformatorem oraz budowa przyłącza średniego napięcia. Podmiotem odpowiedzialnym za realizację projektu jest spółka BK-Wind Sp. z o. o. Wyprodukowana energia elektryczna trafiać będzie do linii średniego napięcia 15 kV, zgodnie z podpisaną umową o przyłączenie, zawartą z operatorem energetycznym - Energa Operator S.A. Realizowany projekt ma charakter stacjonarny. (Polish)
0 references
The project consists of the construction of a 900 kW photovoltaic power plant with associated infrastructure on plot 8/55 in Turowo, the municipality of Szczecin, the District of Szczecinek, the province of Zachodniopomorskie Province. The installation will be located in the vicinity of existing construction works. The investment will include: installation of solar panels on the ground, performance of an external energy installation, subdivision of the prefabricated container block with a transformer and construction of a medium-voltage connection. The entity in charge of the project is BK-Wind Sp. z o. o.. the electricity produced will reach the average 15 kV line according to the signed connection agreement with the energy operator — Energa Operator S.A. Realised project is stationary. (English)
0 references
Identifiers
RPZP.02.10.00-32-A071/16
0 references