Photovoltaic installations for renewable energy for “EURO-KLINKIER Business and Services Companies” J. in Szczecin (Q137692): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project consists of installing two photovoltaic installations on the roof of buildings in two locations where the applicant conducts its business, with a capacity of 38,3 kWp and 19,5 kWp. Installations will provide an alternative renewable source of electricity to the company. The main purpose of the project is to use a photovoltaic installation as an alternative source of electricity for the operation of the business. This will be achieved...)
Property / summary
 
The project consists of installing two photovoltaic installations on the roof of buildings in two locations where the applicant conducts its business, with a capacity of 38,3 kWp and 19,5 kWp. Installations will provide an alternative renewable source of electricity to the company. The main purpose of the project is to use a photovoltaic installation as an alternative source of electricity for the operation of the business. This will be achieved through the following actions: 1. Preparatory work (documentation for a feasibility study, two installation projects). 2. Purchase of fixed assets — the installation of a photovoltaic installation at an Obtrycka Street, which is composed of: — 150 items of solar panels with a power of 265 W, — 2 inverters, — 600 m solar cable, — 1 mounting systems, — 8 over-protection units, 3. Purchase of fixed assets — a photovoltaic installation located at ulica Pyrzycka, which is composed of: — 75 items of solar panels with a power of 265 W, -1 inverters, -400 metres solar cable, -1 assembly system, -4 over-protection, 4. Project promotion (dashboard, label, info on the website). Immediately after completion of the project, it will be possible to make full use of the resulting products. The project will last from the second quarter of 2016 (preparatory work — launch of a feasibility study) by the end of the second quarter of 2017. No licences or building declarations are necessary for the installation of the photovoltaic installation, as well as any other type of authorisation. Total investment cost PLN 506 760,00 gross and the value of eligible costs is PLN 412 000,00. The project is stationary and has two locations in Szczecin, ul. Oburryka and Pyrzyka Street. (English)
Property / summary: The project consists of installing two photovoltaic installations on the roof of buildings in two locations where the applicant conducts its business, with a capacity of 38,3 kWp and 19,5 kWp. Installations will provide an alternative renewable source of electricity to the company. The main purpose of the project is to use a photovoltaic installation as an alternative source of electricity for the operation of the business. This will be achieved through the following actions: 1. Preparatory work (documentation for a feasibility study, two installation projects). 2. Purchase of fixed assets — the installation of a photovoltaic installation at an Obtrycka Street, which is composed of: — 150 items of solar panels with a power of 265 W, — 2 inverters, — 600 m solar cable, — 1 mounting systems, — 8 over-protection units, 3. Purchase of fixed assets — a photovoltaic installation located at ulica Pyrzycka, which is composed of: — 75 items of solar panels with a power of 265 W, -1 inverters, -400 metres solar cable, -1 assembly system, -4 over-protection, 4. Project promotion (dashboard, label, info on the website). Immediately after completion of the project, it will be possible to make full use of the resulting products. The project will last from the second quarter of 2016 (preparatory work — launch of a feasibility study) by the end of the second quarter of 2017. No licences or building declarations are necessary for the installation of the photovoltaic installation, as well as any other type of authorisation. Total investment cost PLN 506 760,00 gross and the value of eligible costs is PLN 412 000,00. The project is stationary and has two locations in Szczecin, ul. Oburryka and Pyrzyka Street. (English) / rank
 
Normal rank

Revision as of 10:05, 11 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Photovoltaic installations for renewable energy for “EURO-KLINKIER Business and Services Companies” J. in Szczecin
Project in Poland financed by DG Regio

    Statements

    0 references
    341,582.7 zloty
    0 references
    81,979.848 Euro
    13 January 2020
    0 references
    494,290.26 zloty
    0 references
    118,629.6624 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 May 2016
    0 references
    31 March 2018
    0 references
    "PRZEDSIĘBIORSTWO HANDLOWO-USŁUGOWE EURO-KLINKIER" ANDRZEJ DĄBSKI RYSZARD STANIAK SPÓŁKA JAWNA
    0 references
    Realizacja projektu polega na zainstalowaniu dwóch instalacji fotowoltaicznych na dachach budynków, w dwóch lokalizacjach, w których Wnioskodawca prowadzi swoją działalność gospodarczą, o mocy 38,3 kWp oraz 19,5 kWp. Instalacje dostarczą firmie alternatywne, odnawialne źródło energii elektrycznej. Głównym celem realizacji projektu jest wykorzystanie instalacji fotowoltaicznej jako alternatywnego źródła energii elektrycznej na potrzeby funkcjonowania przedsiębiorstwa. Cel ten zostanie osiągnięty poprzez realizację następujących działań: 1. Prace przygotowawcze (dokumentacja dotycząca studium wykonalności, dwa projekty instalacji). 2. Zakup środków trwałych - instalacji fotowoltaicznej w lokalizacji przy ulicy Obotryckiej, w skład której wchodzą: - 150 sztuk paneli fotowoltaicznych o mocy 265 W, - 2 sztuki inwertera, - 600 metrów przewodu solarnego, - 1 system montażowy, - 8 szt. ochrony przepięciowej, 3. Zakup środków trwałych - instalacji fotowoltaicznej w lokalizacji przy ulicy Pyrzyckiej, w skład której wchodzą: - 75 sztuk paneli fotowoltaicznych o mocy 265 W, - 1 sztuka inwertera, - 400 metrów przewodu solarnego, - 1 system montażowy, - 4 szt. ochrony przepięciowej, 4. Promocja projektu (tablica, oznakowanie, info na stronie www). Bezpośrednio po zakończeniu realizacji projektu, możliwe będzie w pełni korzystanie z wytworzonych w wyniku jego realizacji produktów. Realizacja projektu będzie trwała od II kwartału 2016 (prace przygotowawcze - rozpisanie studium wykonalności) do końca II kwartału 2017. Do uruchomienia instalacji fotowoltaicznych nie są konieczne żadne pozwolenia ani zgłoszenia budowlane, a także innego typu zezwolenia. Całkowity koszt inwestycji 506 760,00 zł brutto, a wartość kosztów kwalifikowanych to 412 000,00 zł. Projekt ma charakter stacjonarny i posiada dwie lokalizacje w Szczecinie - ul. Obotrycką oraz ulicę Pyrzycką. (Polish)
    0 references
    The project consists of installing two photovoltaic installations on the roof of buildings in two locations where the applicant conducts its business, with a capacity of 38,3 kWp and 19,5 kWp. Installations will provide an alternative renewable source of electricity to the company. The main purpose of the project is to use a photovoltaic installation as an alternative source of electricity for the operation of the business. This will be achieved through the following actions: 1. Preparatory work (documentation for a feasibility study, two installation projects). 2. Purchase of fixed assets — the installation of a photovoltaic installation at an Obtrycka Street, which is composed of: — 150 items of solar panels with a power of 265 W, — 2 inverters, — 600 m solar cable, — 1 mounting systems, — 8 over-protection units, 3. Purchase of fixed assets — a photovoltaic installation located at ulica Pyrzycka, which is composed of: — 75 items of solar panels with a power of 265 W, -1 inverters, -400 metres solar cable, -1 assembly system, -4 over-protection, 4. Project promotion (dashboard, label, info on the website). Immediately after completion of the project, it will be possible to make full use of the resulting products. The project will last from the second quarter of 2016 (preparatory work — launch of a feasibility study) by the end of the second quarter of 2017. No licences or building declarations are necessary for the installation of the photovoltaic installation, as well as any other type of authorisation. Total investment cost PLN 506 760,00 gross and the value of eligible costs is PLN 412 000,00. The project is stationary and has two locations in Szczecin, ul. Oburryka and Pyrzyka Street. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-A048/16
    0 references