Construction of a micro-PV by FLOW TECHNICAL SPOLKA Z OGRANICZONĄ ODPOWIEDZIALNOSCIA (Q137787): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The investment covered by this project consists of the purchase and installation of a micro-PV. The project is part of the project type mentioned in the SzOP ROP 2.10. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws 2015, item (478) and Article 7 (1) 8d with 4-9 Act — Energy Law (Journal of L...) |
||
Property / summary | |||
The investment covered by this project consists of the purchase and installation of a micro-PV. The project is part of the project type mentioned in the SzOP ROP 2.10. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws 2015, item (478) and Article 7 (1) 8d with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) 348) will be made on the basis of the notification without the beneficiary having to have a valid technical connection to the network. The applicant currently has a connection where the contractual power is 150 kW. The project meets all boundary conditions laid down in the SzOOP. This project involves the delivery and installation of a rooftop photovoltaic installation — 152 panels (polycrystalline) of 39.52 kW with inverters, the necessary wiring and fittings. Pv panels are using solar radiation to convert solar radiation into electricity. By cable, they transmit energy to inverters where there is a change in direct current into alternating current. The plant will be connected to the grid and there will be no need to install batteries and recharging regulators as the network is capable of absorbing all the energy produced. The energy produced will be used for its own account and any surplus will be entered into the network. The project will be completed within 1 year after signature of the agreement. (English) | |||
Property / summary: The investment covered by this project consists of the purchase and installation of a micro-PV. The project is part of the project type mentioned in the SzOP ROP 2.10. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws 2015, item (478) and Article 7 (1) 8d with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) 348) will be made on the basis of the notification without the beneficiary having to have a valid technical connection to the network. The applicant currently has a connection where the contractual power is 150 kW. The project meets all boundary conditions laid down in the SzOOP. This project involves the delivery and installation of a rooftop photovoltaic installation — 152 panels (polycrystalline) of 39.52 kW with inverters, the necessary wiring and fittings. Pv panels are using solar radiation to convert solar radiation into electricity. By cable, they transmit energy to inverters where there is a change in direct current into alternating current. The plant will be connected to the grid and there will be no need to install batteries and recharging regulators as the network is capable of absorbing all the energy produced. The energy produced will be used for its own account and any surplus will be entered into the network. The project will be completed within 1 year after signature of the agreement. (English) / rank | |||
Normal rank |
Revision as of 10:04, 11 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a micro-PV by FLOW TECHNICAL SPOLKA Z OGRANICZONĄ ODPOWIEDZIALNOSCIA |
Project in Poland financed by DG Regio |
Statements
185,300.0 zloty
0 references
268,140.0 zloty
0 references
85.0 percent
0 references
8 October 2018
0 references
31 January 2019
0 references
FLOW TECHNICS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Inwestycja objęta niniejszym projektem polega na zakupie i montażu mikroinstalacji fotowoltaicznej. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO 2.10. Instalacje będą służyły potrzebom własnym i będą podłączone do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii ( Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będą one dokonywane na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia do sieci. Wnioskodawca posiada obecnie przyłącza gdzie moc umowna wynosi 150 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Niniejszy projekt zakłada dostawę i montaż dachowej instalacji fotowoltaicznej - 152 paneli (polikrystalicznych) o mocy 39,52 kW z falownikami, niezbędnym okablowaniem i osprzętem. Panele pv wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania słonecznego na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą wyprodukowaną energię. Wyprodukowana energia będzie wykorzystywana na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie (Polish)
0 references
The investment covered by this project consists of the purchase and installation of a micro-PV. The project is part of the project type mentioned in the SzOP ROP 2.10. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws 2015, item (478) and Article 7 (1) 8d with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) 348) will be made on the basis of the notification without the beneficiary having to have a valid technical connection to the network. The applicant currently has a connection where the contractual power is 150 kW. The project meets all boundary conditions laid down in the SzOOP. This project involves the delivery and installation of a rooftop photovoltaic installation — 152 panels (polycrystalline) of 39.52 kW with inverters, the necessary wiring and fittings. Pv panels are using solar radiation to convert solar radiation into electricity. By cable, they transmit energy to inverters where there is a change in direct current into alternating current. The plant will be connected to the grid and there will be no need to install batteries and recharging regulators as the network is capable of absorbing all the energy produced. The energy produced will be used for its own account and any surplus will be entered into the network. The project will be completed within 1 year after signature of the agreement. (English)
0 references
Identifiers
RPZP.02.10.00-32-B145/17
0 references