Increasing the energy efficiency of the building of the Border Police Regional Directorate — Elhovo (Q3885156): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Ямбол / rank
 
Normal rank

Revision as of 19:13, 6 December 2021

Project Q3885156 in Bulgaria
Language Label Description Also known as
English
Increasing the energy efficiency of the building of the Border Police Regional Directorate — Elhovo
Project Q3885156 in Bulgaria

    Statements

    0 references
    970,790.04 Bulgarian lev
    0 references
    495,102.92 Euro
    1 December 2021
    0 references
    1,142,105.93 Bulgarian lev
    0 references
    582,474.02 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    8 March 2019
    0 references
    16 November 2020
    0 references
    Q3885143 (Deleted Item)
    0 references

    42°7'14.63"N, 26°37'15.28"E
    0 references
    Проектното предложение е насочено към повишаване на енергийна ефективност на сградата на Регионална дирекция “Гранична полиция”-Елхово, в проектното предложение са включени два обекта - aдминистративна сграда и сграда с помещения за настаняване на задържани лица (ПНЗЛ) и складове. През 1959 г. е построена сграда с ПНЗЛ и складове, a oсновната административна сграда е въведена в експлоатация от 1978 г. Сградите включени, в проектното предложение се намират на ул. „Морава“ № 1.Мерките за енергийна ефективност в сградите ще се изпълняват въз основа на извършено обследване за енергийна ефективност, придружени от валиден сертификат за енергийни характеристики по съответната сграда, и обследване за установяване на техническите характеристики на сградите с изготвени технически паспорти. На етап кандидатстване е изработен инвестиционен проект във фаза "технически проект", съгласно ЗУТ и Наредба 4 от 2001 г. за обхвата и съдържанието на инвестиционните проекти. В инвестиционния проект са включени всички задължителни енергоспестяващи мерки, предписани в обследването за енергийна ефективност, в т.ч. мерки за оползотворяване на възобновяеми енергийни източници и всички задължителни мерки, предписани в техническото обследване. Изпълнението на заложените в проектното предложение дейности в aдминистративната сграда ще допринесат за достигане клас на енергопотребление „А“, като сградата ПНЗЛ и складове ще допринесат за достигане клас на енергопотребление „В“. Предвидените по проекта енергоспестяващи мерки и задължителните мерки от обследването на техническите характеристики ще се изпълняват въз основа на направените обследвания по съответните сгради. В резултат от изпълнението им ще се повиши енергийната ефективност на сградата, ще бъдат намалени разходите за електроенергия, което ще доведе до освобождаване на ресурси, които да бъдат пренасочени за други дейности и ще стимулират хората да останат да живеят в малките населени места. (Bulgarian)
    0 references
    The project proposal aims at increasing the energy efficiency of the building of the Border Police Regional Directorate-Elhovo, the project proposal includes two sites — an administrative building and a building with premises for the accommodation of detainees (PNZL) and warehouses. In 1959 a building with GNZL and warehouses was built and the main administrative building was put into operation since 1978. The buildings included in the project proposal are located on 1 Morava Street. The measures for energy efficiency in buildings will be implemented on the basis of an energy efficiency audit accompanied by a valid energy performance certificate for the building concerned and an audit to establish the technical characteristics of buildings with technical passports. At the application stage, an investment project in the “technical project” phase has been drawn up in accordance with the ZUT and Ordinance 4 of 2001 on the scope and content of investment projects. The investment project includes all mandatory energy saving measures prescribed in the energy efficiency audit, including measures for the utilisation of renewable energy sources and all mandatory measures prescribed in the technical audit. The implementation of the activities set out in the project proposal in the administrative building will contribute to achieving the energy consumption class “A” and the building will contribute to achieving the energy consumption class “B”. The energy-saving measures provided for in the project and the mandatory measures from the technical performance audit will be carried out on the basis of the audits carried out on the buildings concerned. Their implementation will increase the energy efficiency of the building, reduce electricity costs, releasing resources to be redirected to other activities and incentivise people to stay in small settlements. (English)
    2 December 2021
    0 references
    La proposition de projet vise à accroître l’efficacité énergétique du bâtiment de la Direction régionale de la police des frontières d’Elhovo; la proposition de projet comprend deux sites: un bâtiment administratif et un bâtiment comportant des locaux pour l’hébergement des détenus (PNZL) et des entrepôts. En 1959, un bâtiment avec GNZL et des entrepôts a été construit et le bâtiment administratif principal a été mis en service depuis 1978. Les bâtiments inclus dans la proposition de projet sont situés sur la 1 rue Morava. Les mesures d’efficacité énergétique des bâtiments seront mises en œuvre sur la base d’un audit de l’efficacité énergétique accompagné d’un certificat de performance énergétique valide pour le bâtiment concerné et d’un audit visant à établir les caractéristiques techniques des bâtiments munis de passeports techniques. Au stade de la demande, un projet d’investissement dans la phase «projet technique» a été élaboré conformément à la ZUT et à l’ordonnance no 4 de 2001 sur la portée et le contenu des projets d’investissement. Le projet d’investissement comprend toutes les mesures obligatoires d’économie d’énergie prescrites dans l’audit d’efficacité énergétique, y compris les mesures d’utilisation des sources d’énergie renouvelables et toutes les mesures obligatoires prescrites dans l’audit technique. La mise en œuvre des activités décrites dans la proposition de projet dans le bâtiment administratif contribuera à atteindre la classe de consommation d’énergie «A» et le bâtiment contribuera à atteindre la classe de consommation d’énergie «B». Les mesures d’économie d’énergie prévues dans le projet et les mesures obligatoires découlant de l’audit de performance technique seront réalisées sur la base des audits effectués sur les bâtiments concernés. Leur mise en œuvre permettra d’accroître l’efficacité énergétique du bâtiment, de réduire les coûts de l’électricité, de libérer des ressources destinées à être réorientées vers d’autres activités et d’inciter les gens à rester dans de petits établissements. (French)
    3 December 2021
    0 references
    Der Projektvorschlag zielt darauf ab, die Energieeffizienz des Gebäudes der Regionaldirektion der Grenzpolizei Elhovo zu erhöhen, der Projektvorschlag umfasst zwei Standorte – ein Verwaltungsgebäude und ein Gebäude mit Räumlichkeiten für die Unterbringung von Inhaftierten (PNZL) und Lagerhäusern. 1959 wurde ein Gebäude mit GNZL und Lagerhäusern errichtet und das Hauptverwaltungsgebäude wurde seit 1978 in Betrieb genommen. Die im Projektvorschlag enthaltenen Gebäude befinden sich in der 1 Morava Straße. Die Maßnahmen zur Energieeffizienz in Gebäuden werden auf der Grundlage eines Energieeffizienzaudits mit einem gültigen Energieausweis für das betreffende Gebäude und einer Prüfung zur Feststellung der technischen Merkmale von Gebäuden mit technischen Pässen durchgeführt. In der Antragsphase wurde gemäß der ZUT und der Verordnung Nr. 4 von 2001 über Umfang und Inhalt von Investitionsvorhaben ein Investitionsvorhaben in der Phase „Technisches Projekt“ erstellt. Das Investitionsvorhaben umfasst alle obligatorischen Energieeinsparungsmaßnahmen, die im Energieeffizienzaudit vorgeschrieben sind, einschließlich Maßnahmen zur Nutzung erneuerbarer Energiequellen und alle obligatorischen Maßnahmen, die in der technischen Prüfung vorgeschrieben sind. Die Durchführung der im Projektvorschlag im Verwaltungsgebäude vorgesehenen Maßnahmen wird zur Erreichung der Energieverbrauchsklasse „A“ beitragen, und das Gebäude wird zur Erreichung der Energieverbrauchsklasse „B“ beitragen. Die im Projekt vorgesehenen energiesparenden Maßnahmen und die obligatorischen Maßnahmen aus der technischen Leistungsprüfung werden auf der Grundlage der Prüfungen der betreffenden Gebäude durchgeführt. Ihre Umsetzung wird die Energieeffizienz des Gebäudes erhöhen, die Stromkosten senken, Ressourcen freisetzen, die auf andere Tätigkeiten umgeleitet werden, und Anreize für die Menschen schaffen, in kleinen Siedlungen zu bleiben. (German)
    4 December 2021
    0 references
    Елхово
    0 references

    Identifiers

    BG16RFOP001-2.002-0010
    0 references