“Construction of Waste Water Treatment Plant (WWTP) — Vidin II” (Q3884506): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Видин / rank
 
Normal rank

Revision as of 18:58, 6 December 2021

Project Q3884506 in Bulgaria
Language Label Description Also known as
English
“Construction of Waste Water Treatment Plant (WWTP) — Vidin II”
Project Q3884506 in Bulgaria

    Statements

    0 references
    13,287,456.28 Bulgarian lev
    0 references
    6,776,602.7 Euro
    1 December 2021
    0 references
    16,212,716.79 Bulgarian lev
    0 references
    8,268,485.56 Euro
    1 December 2021
    0 references
    0.82 percent
    0 references
    11 August 2016
    0 references
    30 June 2024
    0 references
    Q3884502 (Deleted Item)
    0 references
    0 references

    43°48'4.61"N, 22°40'46.16"E
    0 references
    Доизграждане на ПСОВ-гр.Видин за пречистването на отпадъчните води при еквивалент жители - 56 000 е.ж. за 2041г. и следните основни данни на входа на ПСОВ:средноденонощно водно количество- 10 928 м3/ден;БПК5-3 360кг/ден;ХПК-6 720кг/ден:суспендирани вещества-3 920кг/ден;общ азот-616кг/ден;общо фосфор-101кг/ден;Проекта "Доизграждане на Пречиствателна станция за отпадъчни води (ПСОВ) - гр.Видин - Втора фаза",включва следните дейности:упражняване на авторски надзор по време на строителство;доставка на необходимите материали,оборудване и обзавеждане;строително-монтажни работи;единични,комплексни и 72-часови изпитвания;изготвяне на екзекутивна документация и кадастрални заснемания на целия обект съгласно закона за кадастъра и имотния регистър;за въвеждане на обекта в експолатация с Протокол обр.16 и разрешение за ползаване;обучаване на персонала;отстраняване на дефекти в указаните гаранционни срокове и подпомагане експлоатацията и подръжката на ПСОВ в тези срокове; (Bulgarian)
    0 references
    Completion of the WWTP-Vidin for the treatment of waste water at population equivalent — 56 000 e.g. for the year 2041 and the following basic data at the inlet of the WWTP: a daily average water quantity of 10 928 m³/day; BOD5-3 360 kg/day; COD-6 720 kg/day: suspended substances-3 920 kg/day; total nitrogen-616 kg/day; total phosphorus-101 kg/day;Project “Completement of Waste Water Treatment Plant (WWTP) — Vidin II” includes the following activities: exercise of author’s supervision during construction; supply of the necessary materials, equipment and furniture; construction and installation works; single, complex and 72-hour tests; preparation of the execution documentation and cadastral photographs of the whole site in accordance with the law on the land register; for the introduction of the site into exponentiation with Protocol 16 and authorisation for benefit; training of staff; repair of defects in the specified warranty periods and assistance in the operation and maintenance of the WWTP within these terms; (English)
    2 December 2021
    0 references
    Achèvement de la WWTP-Vidin pour le traitement des eaux résiduaires en équivalent population — 56 000, par exemple pour l’année 2041 et les données de base suivantes à l’entrée de la station d’épuration: quantité d’eau moyenne journalière de 10 928 m³/jour; DBO5-3 360 kg/jour; DCO-6 720 kg/jour: substances en suspension — 3 920 kg/jour; azote total-616 kg/jour; phosphore total — 101 kg/jour;Projet «achèvement de la station d’épuration des eaux usées (WWTP) — Vidin II» comprend les activités suivantes: exercice de la supervision de l’auteur pendant la construction; fourniture des matériaux, équipements et mobilier nécessaires; travaux de construction et d’installation; essais simples, complexes et 72 heures; préparation de la documentation d’exécution et des photographies cadastrales de l’ensemble du site conformément à la loi sur le cadastre; pour l’introduction du site en exponentiation avec le Protocole 16 et autorisation au bénéfice; formation du personnel; réparation des défauts pendant les périodes de garantie spécifiées et assistance à l’exploitation et à la maintenance de la station d’épuration dans ces conditions; (French)
    3 December 2021
    0 references
    Abschluss des WWTP-Vidin für die Behandlung von Abwasser bei Bevölkerungsäquivalent – 56 000 z. B. für das Jahr 2041 und die folgenden Basisdaten am Eingang des WWTP: eine durchschnittliche tägliche Wassermenge von 10 928 m³/Tag; BSB5-3 360 kg/Tag; COD-6 720 kg/Tag: suspendierte Stoffe-3 920 kg/Tag; Gesamtstickstoff-616 kg/Tag; Gesamtphosphor-101 kg/Tag;Projekt „Abwasseraufbereitungsanlage (WWTP) – Vidin II“ umfasst folgende Tätigkeiten: Ausübung der Aufsicht des Autors während des Baus; Lieferung der erforderlichen Materialien, Ausrüstungen und Möbel; Bau- und Installationsarbeiten; Einzel-, komplexe und 72-Stunden-Tests; Vorbereitung der Ausführungsunterlagen und Katasterfotos des gesamten Geländes gemäß den Gesetzen über das Grundbuch; für die Einführung des Standorts in die Exponentiation mit Protokoll 16 und die Genehmigung für den Nutzen; Schulung des Personals; Reparatur von Mängeln in den angegebenen Gewährleistungsfristen und Unterstützung beim Betrieb und Wartung des WWTP im Rahmen dieser Bedingungen; (German)
    4 December 2021
    0 references
    Видин
    0 references

    Identifiers

    BG16M1OP002-1.005-0007
    0 references