Completion and reconstruction of the water supply system and sewerage networks in the separate area, served by WSS OOD, Kardzhali, Bulgaria (Q3834367): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Кърджали / rank | |||
Normal rank |
Revision as of 13:18, 6 December 2021
Project Q3834367 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Completion and reconstruction of the water supply system and sewerage networks in the separate area, served by WSS OOD, Kardzhali, Bulgaria |
Project Q3834367 in Bulgaria |
Statements
42,288,174.21 Bulgarian lev
0 references
56,547,844.01 Bulgarian lev
0 references
0.75 percent
0 references
22 October 2019
0 references
22 April 2024
0 references
0 references
Основни компоненти на проектаПредвиденото инвестиционно намерение включва:1. Компонент водоснабдяване 1.1. Агломерация Кърджали:- ОБЕКТ 1: Инженеринг на обект „Реконструкция и модернизация на ПСПВ (Пречиствателна станция за питейни води) Енчец“;- ОБЕКТ 4: Инженеринг на обект „Външни водопроводи на ВС Боровица“. Обособена позиция: Инженеринг на обект „Реконструкция на магистрален водопровод на ВС „Боровица“ от с. Ненково до ПСПВ Енчец“- ОБЕКТ 4: Инженеринг на обект „Външни водопроводи на ВС Боровица“. Обособена позиция: Реконструкция на главните водопроводи на ВС Боровица от ПСПВ Енчец до НР13000 м³ и НР 5000 м³. Подобект: Изграждане на втора камера на НР 5000 м³“- ОБЕКТ 2: Инженеринг на обект „Реконструкция на компоненти от ВС Боровица“. Обособена позиция: „Реконструкция и доизграждане на вътрешна водопроводна мрежа на гр. Кърджали“.1.2. Агломерация Момчилград:- ОБЕКТ 2: Инженеринг на обект „Реконструкция на компоненти от ВС Боровица“. Обособена позиция: „Реконструкция и доизграждане на вътрешна водопроводна мрежа на гр. Момчилград“2. Компонент отвеждане и пречистване2.1. Агломерация Кърджали:- ОБЕКТ 3: Инженеринг на обект „Доизграждане и реконструкция на канализационната мрежа в агломерация Кърджали“: Доизграждане и реконструкция на канализационна мрежа кв. Гледка и кв. Горна Гледка; Доизграждане и реконструкция на канализационна мрежа в с. Резбарци; Доизграждане и реконструкция на канализационна мрежа в кв. Прилепци; Изграждане на нова входна шахта и укрепващо съоръжение на дюкер под р. Арда. (Bulgarian)
0 references
Main components of the projectThe envisaged investment intention includes:1. Component water supply 1.1. Kardzhali agglomeration:- OBECT 1: Engineering of the project “Reconstruction and modernisation of PWTP (Drinking Water Treatment Plant) Enchetz”;- OPECT 4: Engineering of the project “External water ducts of Borovitsa Air Force”. Lot: Engineering of the site “Reconstruction of a highway water pipeline of Borovitsa Air Force from the village of Nenkovo to PSPV Enchetz” — OBECT 4: Engineering of the project “External water ducts of Borovitsa Air Force”. Lot: Reconstruction of the main water supply lines of Borovitsa from PWTP Enčec to HP13000 m³ and HP 5 000 m³. Sub-site: Construction of a second camera of HP 5 000 m³"- OBECT 2: Engineering of the project “Reconstruction of components from Borovitsa Air Force”. Lot: “Reconstruction and completion of the internal water supply network of Kardzhali”.1.2. Agglomeration Momchilgrad:- OBECT 2: Engineering of the project “Reconstruction of components from Borovitsa Air Force”. Lot: “Reconstruction and completion of the internal water supply network of Momchilgrad”2. Drainage and purification component2.1. Kardzhali agglomeration:- OBEKT 3: Engineering of the site “Completement and reconstruction of the sewerage network in the agglomeration of Kardzhali”: Completion and reconstruction of sewerage network View and quarter Upper view; Completion and reconstruction of sewerage network in the village of Rezbartsi; Completion and reconstruction of sewerage network in Bats; Construction of a new entrance shaft and reinforcement facility of the duker under the Arda River. (English)
2 December 2021
0 references
Principaux éléments du projetL’intention d’investissement envisagée comprend: 1. Approvisionnement en eau des composants 1.1. Agglomération de Kardzhali:- obect 1: Ingénierie du projet «Reconstruction et modernisation de PWTP (usine de traitement de l’eau potable) Enchetz»;- OPECT 4: Ingénierie du projet «Canalisations d’eau extérieures de Borovitsa Air Force». Lot: Ingénierie du site «Reconstruction d’une autoroute conduite d’eau de Borovitsa Air Force du village de Nenkovo à PSPV Enchetz» — obect 4: Ingénierie du projet «Canalisations d’eau extérieures de Borovitsa Air Force». Lot: Reconstruction des principales conduites d’approvisionnement en eau de Borovitsa de PWTP Enčec à HP13000 m³ et HP 5 000 m³. Sous-site: Construction d’une deuxième caméra de HP 5 000 m³"- obect 2: Ingénierie du projet «Reconstruction de composants de Borovitsa Air Force». Lot: «Reconstruction et achèvement du réseau interne d’approvisionnement en eau de Kardzhali».1.2. Agglomération Momchilgrad:- obect 2: Ingénierie du projet «Reconstruction de composants de Borovitsa Air Force». Lot: «Reconstruction et achèvement du réseau interne d’approvisionnement en eau de Momchilgrad»2. Composante de drainage et de purification2.1. Agglomération de Kardzhali:- Obekt 3: Ingénierie du site «achèvement et reconstruction du réseau d’assainissement dans l’agglomération de Kardzhali»: Achèvement et reconstruction du réseau d’assainissement Vue et trimestre Vue supérieure; Achèvement et reconstruction du réseau d’assainissement dans le village de Rezbartsi; Achèvement et reconstruction du réseau d’assainissement Chauves-souris; Construction d’un nouveau puits d’entrée et d’une installation de renforcement du Duker sous la rivière Arda. (French)
3 December 2021
0 references
Hauptkomponenten des ProjektsDie geplante Investitionsabsicht umfasst: 1. Komponenten Wasserversorgung 1.1. Kardzhali Agglomeration:- obect 1: Engineering des Projekts „Rekonstruktion und Modernisierung von PWTP (Drinking Water Treatment Plant) Enchetz“;- OPECT 4: Konstruktion des Projekts „Außenwasserkanäle der Luftwaffe Borovitsa“. Los: Engineering des Standorts „Rekonstruktion der Autobahn Wasserleitung Borovitsa Luftwaffe aus dem Dorf Nenkovo zu PSPV Enchetz“ – obect 4: Konstruktion des Projekts „Außenwasserkanäle der Luftwaffe Borovitsa“. Los: Rekonstruktion der wichtigsten Wasserversorgungslinien von Borovitsa von PWTP Enčec auf HP13000 m³ und HP 5 000 m³. Unterseite: Bau einer zweiten Kamera von HP 5 000 m³"- obect 2: Engineering des Projekts „Rekonstruktion von Bauteilen von Borovitsa Air Force“. Los: „Rekonstruktion und Fertigstellung des internen Wasserversorgungsnetzes von Kardzhali“.1.2. Agglomeration Momchilgrad:- obect 2: Engineering des Projekts „Rekonstruktion von Bauteilen von Borovitsa Air Force“. Los: „Rekonstruktion und Fertigstellung des internen Wasserversorgungsnetzes von Momchilgrad“2. Entwässerungs- und Reinigungskomponente2.1. Kardzhali Agglomeration:- Obekt 3: Engineering des Standorts „Vervollständigung und Rekonstruktion des Kanalisationsnetzes im Ballungsraum von Kardzhali“: Fertigstellung und Umbau des Kanalisationsnetzes Blick und Viertel Oberer Blick; Fertigstellung und Wiederaufbau des Kanalisationsnetzes im Dorf Rezbartsi; Fertigstellung und Rekonstruktion des Kanalisationsnetzes in Fledermäuse; Bau einer neuen Eingangswelle und Verstärkungsanlage des Herzogs unter dem Arda-Fluss. (German)
4 December 2021
0 references
Кърджали
0 references
Identifiers
BG16M1OP002-1.016-0010
0 references