Shaping and improvement of open-air theatre and green space (Q2799220): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Pour l’achèvement de la phase de régénération dans le théâtre en plein air du port de Messolonghi, ils ont été conçus: Un complexe de bâtiments unique, au sud du théâtre, qui répondra aux besoins du théâtre et comprendra des Billetteries, Restaurant — Courier, dressings pour acteurs, toilettes pour le public et différentes toilettes pour les acteurs, construction de rangées supplémentaires de stands pour élargir la capacité du théâtre, construct...) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Entwicklung und Verbesserung von Open-Air-Theater und Grünflächen | |||||||||||||||
Property / summary | |||||||||||||||
Für die Fertigstellung der Regenerationsphase im Open-Air-Theater des Hafens von Messolonghi wurden sie entworfen: Ein Gebäudekomplex südlich des Theaters, der den Bedürfnissen des Theaters dient und Ticketing Stationen, Restaurant – Kurier, Umkleideräume für Schauspieler, Toiletten für die Öffentlichkeit und verschiedene Toiletten für Schauspieler, Bau von zusätzlichen Reihen von Ständen, um die Kapazität des Theaters zu erweitern, Bau eines neuen Flügels mit zusätzlichen Ständen östlich des bestehenden und Lagerraums darunter, ein kleines Gebäude im westlichen Teil der Stände, das den Beleuchtungsbedürfnissen der Bühne und der elektrischen Unterstützung gerecht wird und auch als Raum für die Kinoprojektionsmaschine genutzt werden kann, sowie die Einstellung und den Bau eines Zeltes, (einer im bestehenden Sommertheaterkomplex, das existiert nicht), mit dem Bau einer Hohlwand mit Öffnungen für den Eintritt der Schauspieler zum Orchester. Das Orchester wird in einem Abstand von 2,50 Metern von der bestehenden ersten Sitzreihe mit einem Durchmesser von 14,60 m rekonstruiert. (German) | |||||||||||||||
Property / summary: Für die Fertigstellung der Regenerationsphase im Open-Air-Theater des Hafens von Messolonghi wurden sie entworfen: Ein Gebäudekomplex südlich des Theaters, der den Bedürfnissen des Theaters dient und Ticketing Stationen, Restaurant – Kurier, Umkleideräume für Schauspieler, Toiletten für die Öffentlichkeit und verschiedene Toiletten für Schauspieler, Bau von zusätzlichen Reihen von Ständen, um die Kapazität des Theaters zu erweitern, Bau eines neuen Flügels mit zusätzlichen Ständen östlich des bestehenden und Lagerraums darunter, ein kleines Gebäude im westlichen Teil der Stände, das den Beleuchtungsbedürfnissen der Bühne und der elektrischen Unterstützung gerecht wird und auch als Raum für die Kinoprojektionsmaschine genutzt werden kann, sowie die Einstellung und den Bau eines Zeltes, (einer im bestehenden Sommertheaterkomplex, das existiert nicht), mit dem Bau einer Hohlwand mit Öffnungen für den Eintritt der Schauspieler zum Orchester. Das Orchester wird in einem Abstand von 2,50 Metern von der bestehenden ersten Sitzreihe mit einem Durchmesser von 14,60 m rekonstruiert. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Für die Fertigstellung der Regenerationsphase im Open-Air-Theater des Hafens von Messolonghi wurden sie entworfen: Ein Gebäudekomplex südlich des Theaters, der den Bedürfnissen des Theaters dient und Ticketing Stationen, Restaurant – Kurier, Umkleideräume für Schauspieler, Toiletten für die Öffentlichkeit und verschiedene Toiletten für Schauspieler, Bau von zusätzlichen Reihen von Ständen, um die Kapazität des Theaters zu erweitern, Bau eines neuen Flügels mit zusätzlichen Ständen östlich des bestehenden und Lagerraums darunter, ein kleines Gebäude im westlichen Teil der Stände, das den Beleuchtungsbedürfnissen der Bühne und der elektrischen Unterstützung gerecht wird und auch als Raum für die Kinoprojektionsmaschine genutzt werden kann, sowie die Einstellung und den Bau eines Zeltes, (einer im bestehenden Sommertheaterkomplex, das existiert nicht), mit dem Bau einer Hohlwand mit Öffnungen für den Eintritt der Schauspieler zum Orchester. Das Orchester wird in einem Abstand von 2,50 Metern von der bestehenden ersten Sitzreihe mit einem Durchmesser von 14,60 m rekonstruiert. (German) / qualifier | |||||||||||||||
point in time: 6 December 2021
|
Revision as of 10:57, 6 December 2021
Project Q2799220 in Greece
Language | Label | Description | Also known as |
---|---|---|---|
English | Shaping and improvement of open-air theatre and green space |
Project Q2799220 in Greece |
Statements
600,000.0 Euro
0 references
6 October 2020
0 references
31 December 2022
0 references
ΔΗΜΟΣ ΙΕΡΑΣ ΠΟΛΗΣ ΜΕΣΟΛΟΓΓΙΟΥ
0 references
Για την ολοκλήρωση της φάσης της ανάπλασης στο υπαίθριο Θέατρο του Λιμανιού του Μεσολογγίου, έχουν σχεδιαστεί λα κατασκευαστούν :¦Ένα ενιαίο κτιριακό συγκρότημα, νότια του Θεάτρου, που θα εξυπηρετεί τις ανάγκες του θεάτρου και θα περιλαμβάνει Εκδοτήρια εισιτηρίων, Εντευκτήριο - Κυλικείο, καμαρίνια για τους ηθοποιούς, τουαλέτες για το κοινό και διαφορετικές τουαλέτες για τους ηθοποιούς,¦κατασκευή επιπλέον σειρών κερκίδων για τη διεύρυνση της χωρητικότητας του θεάτρου ,¦ κατασκευή νέας πτέρυγας με επιπλέον κερκίδες στα ανατολικά των υπαρχόντων και αποθηκευτικό χώρο κάτω από αυτές,¦μικρό κτίριο στο δυτικό τμήμα των κερκίδων που θα καλύπτει τις ανάγκες φωτισμού των σκηνικών και ηλεκτρολογικής υποστήριξης αυτών και θα μπορεί να χρησιμοποιηθεί και ως χώρος για τη μηχανή προβολής κινηματογράφου ,¦και διαμόρφωση και κατασκευή σκηνής, (μιάς και στο υπάρχον συγκρότημα που αποτελεί το θερινό Θέατρο, αυτή δεν υπάρχει), με τη κατασκευή κοίλου τοίχου με ανοίγματα για την είσοδο των ηθοποιών στο χώρο της ορχήστρας. Η ορχήστρα ανακατασκευάζεται σε απόσταση 2,50 μέτρα από την υπάρχουσα πρώτη σειρά καθισμάτων, με διάμετρο 14,60 μ. (Greek)
0 references
For the completion of the regeneration phase in the open-air Theatre of the Port of Messolonghi, designed in a single building complex, south of the Theatre, which will serve the needs of the theatre and include ticket booths, Entity – Cyllic, dressing rooms for the actors, toilets for the public and different toilets for the actors, and the construction of additional tiles, and the building of the building, the building of the building and the building of the building, the building of the building, and the building of the building, the building of the building, and the building of the building, the building of the building, and the building of the building, the building of the building, and the building of the building, the building of the building, and the building of the building, the building of the building, and the building of the building, and the building of the building, the building of the building, and the building of the building, the building of the building and the building of the building, the building of the building and the building of the building, the building of the building, the building, the building, the building, the building, the building, the building, the building, the building, the building, the building and the building, the building and the building, the building and the building of the building, the building and the building of the acre, and the building, the building of the building and the building of the building, the building of the building and the building of the building, the building of the building and the building of the building, the building of the building and the building of the building, the building of the building and the building of the building, with the building of the building, and the building of the building, the building of the building, and the building of the building, with the space of the building, and the building of the building, the building of the building and the building of the building, the building of the building and the building of the building and the building of the building, and the building of the building of the building, with the building of the building, and the building of the space of the building, with the space of the building, and the building of the space of the building, with the building of the building, and the building of the space of the building, and the building of the space of the building, and the building of the building, the building of the building and the building of the building, the building of the building, and the building of the building, the building of the building, the building of the building, and the building of the building, the building of the building, and the building of the space of the building, and the building of the building, with the space of the building, and the building of the building, the building of the building, and the building, with the space of the space, and the building shall be the space of the space, and the building shall be built in the space of the building, and the building shall be provided in the space of the building, and the building shall be thee, and the building shall be thee, with the space of thee, and the acregment of the acreatry, and the acregation of the enclaves, and the building of the The orchestra is reconstructed at a distance of 2.50 meters from the existing first row of seats, with a diameter of 14.60 m. (English)
3 July 2021
0 references
Pour l’achèvement de la phase de régénération dans le théâtre en plein air du port de Messolonghi, ils ont été conçus: Un complexe de bâtiments unique, au sud du théâtre, qui répondra aux besoins du théâtre et comprendra des Billetteries, Restaurant — Courier, dressings pour acteurs, toilettes pour le public et différentes toilettes pour les acteurs, construction de rangées supplémentaires de stands pour élargir la capacité du théâtre, construction d’une nouvelle aile avec des stands supplémentaires à l’est de l’espace existant et de stockage au-dessous, un petit bâtiment dans la partie ouest des stands qui répondra aux besoins d’éclairage de la scène et du support électrique et peut également être utilisé comme un espace pour la machine de projection de cinéma, et la mise en place et la construction d’une tente, (un dans le complexe de théâtre d’été existant, cela n’existe pas), avec la construction d’un mur creux avec des ouvertures pour l’entrée des acteurs à l’orchestre. L’orchestre est reconstruit à une distance de 2,50 mètres de la première rangée de sièges existante, d’un diamètre de 14,60 m. (French)
29 November 2021
0 references
Für die Fertigstellung der Regenerationsphase im Open-Air-Theater des Hafens von Messolonghi wurden sie entworfen: Ein Gebäudekomplex südlich des Theaters, der den Bedürfnissen des Theaters dient und Ticketing Stationen, Restaurant – Kurier, Umkleideräume für Schauspieler, Toiletten für die Öffentlichkeit und verschiedene Toiletten für Schauspieler, Bau von zusätzlichen Reihen von Ständen, um die Kapazität des Theaters zu erweitern, Bau eines neuen Flügels mit zusätzlichen Ständen östlich des bestehenden und Lagerraums darunter, ein kleines Gebäude im westlichen Teil der Stände, das den Beleuchtungsbedürfnissen der Bühne und der elektrischen Unterstützung gerecht wird und auch als Raum für die Kinoprojektionsmaschine genutzt werden kann, sowie die Einstellung und den Bau eines Zeltes, (einer im bestehenden Sommertheaterkomplex, das existiert nicht), mit dem Bau einer Hohlwand mit Öffnungen für den Eintritt der Schauspieler zum Orchester. Das Orchester wird in einem Abstand von 2,50 Metern von der bestehenden ersten Sitzreihe mit einem Durchmesser von 14,60 m rekonstruiert. (German)
6 December 2021
0 references
Identifiers
5.073.468
0 references