Highway Sebes – Turda (Q3100002): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Die wichtigsten sozioökonomischen Ziele der Projekte sind: — Bau von: 8 Kreuzungen (einschließlich Dumbrava-Straßenkreuzung), 4 Service, 4 Ruhebereiche, 1 Wartungs- und Kontrollzentrum, 1 Wartungs- und Überwachungszentrum und 66 Strukturen; — Bis Ende 202 070,00 km einer neuen Autobahn 2x2 für die Verbindung zwischen Sebes und Turda zu gewährleisten; — Die Verkehrseffizienz durch Verkürzung der Reisezeit zu verbessern; — Verbesserung der Verkehr...) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Autosnelweg Sebes — Turda | |||||||||||||||
Property / summary | |||||||||||||||
De belangrijkste sociaal-economische doelstellingen van de projecten zijn: — Bouw van: 8 knooppunten (met inbegrip van knooppunt Dumbrava), 4 dienst, 4 rustplaatsen, 1 onderhouds- en controlecentrum, 1 onderhouds- en controlecentrum en 66 structuren; Tegen het einde van 202 070,00 km van een nieuwe autosnelweg 2x2 voor de verbinding tussen Sebes en Turda; — De verkeersefficiëntie te verbeteren door de reistijd te verkorten; — Verbetering van de efficiëntie van het vervoer door vermindering van de exploitatie- en onderhoudskosten (zowel voor gebruikers als voor infrastructuurbeheerders); — Om de verkeersveiligheid te verbeteren; Om de milieueffecten te verminderen; — Om de toegankelijkheid te verbeteren. Nadat beide fasen zijn afgerond, zal het project in het algemeen de algemene doelstellingen van het programma verwezenlijken — Prioriteitsas 2: Ontwikkeling van een multimodaal, kwalitatief, duurzaam en efficiënt vervoerssysteem. (Dutch) | |||||||||||||||
Property / summary: De belangrijkste sociaal-economische doelstellingen van de projecten zijn: — Bouw van: 8 knooppunten (met inbegrip van knooppunt Dumbrava), 4 dienst, 4 rustplaatsen, 1 onderhouds- en controlecentrum, 1 onderhouds- en controlecentrum en 66 structuren; Tegen het einde van 202 070,00 km van een nieuwe autosnelweg 2x2 voor de verbinding tussen Sebes en Turda; — De verkeersefficiëntie te verbeteren door de reistijd te verkorten; — Verbetering van de efficiëntie van het vervoer door vermindering van de exploitatie- en onderhoudskosten (zowel voor gebruikers als voor infrastructuurbeheerders); — Om de verkeersveiligheid te verbeteren; Om de milieueffecten te verminderen; — Om de toegankelijkheid te verbeteren. Nadat beide fasen zijn afgerond, zal het project in het algemeen de algemene doelstellingen van het programma verwezenlijken — Prioriteitsas 2: Ontwikkeling van een multimodaal, kwalitatief, duurzaam en efficiënt vervoerssysteem. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: De belangrijkste sociaal-economische doelstellingen van de projecten zijn: — Bouw van: 8 knooppunten (met inbegrip van knooppunt Dumbrava), 4 dienst, 4 rustplaatsen, 1 onderhouds- en controlecentrum, 1 onderhouds- en controlecentrum en 66 structuren; Tegen het einde van 202 070,00 km van een nieuwe autosnelweg 2x2 voor de verbinding tussen Sebes en Turda; — De verkeersefficiëntie te verbeteren door de reistijd te verkorten; — Verbetering van de efficiëntie van het vervoer door vermindering van de exploitatie- en onderhoudskosten (zowel voor gebruikers als voor infrastructuurbeheerders); — Om de verkeersveiligheid te verbeteren; Om de milieueffecten te verminderen; — Om de toegankelijkheid te verbeteren. Nadat beide fasen zijn afgerond, zal het project in het algemeen de algemene doelstellingen van het programma verwezenlijken — Prioriteitsas 2: Ontwikkeling van een multimodaal, kwalitatief, duurzaam en efficiënt vervoerssysteem. (Dutch) / qualifier | |||||||||||||||
point in time: 5 December 2021
|
Revision as of 19:31, 5 December 2021
Project Q3100002 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Highway Sebes – Turda |
Project Q3100002 in Romania |
Statements
1,377,254,497.0 Romanian Leu
0 references
275,450,899.40000004 Euro
0.2 Euro
13 September 2021
0 references
1,620,299,409.0 Romanian Leu
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2022
0 references
COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
0 references
The main socio-economic objectives of the projects are: - Construction of: 8 junctions (including Dumbrava road junction), 4 service, 4 rest areas, 1 maintenance and control centre, 1 maintenance and monitoring centre and 66 structures; - To ensure by the end of 2020, 70,00 km of a new 2x2 motorway for the connection between Sebes and Turda; - To improve the traffic efficiency through reduction of the travel time; - To improve transport efficiency through reduction of operation and maintenance costs (both for users and infrastructure operator); - To improve traffic safety; - To reduce environmental impact; - To improve accessibility. After both phases are going to be finalized, the project as an overall will accomplish the general objectives of the program - Priority Axis 2: Development of a multimodal, quality, sustainable and efficient transport system. (Romanian)
0 references
The main socio-economic objectives of the projects are: — Construction of: 8 junctions (including Dumbrava road junction), 4 service, 4 rest areas, 1 maintenance and control center, 1 maintenance and monitoring center and 66 structures; — To ensure by the end of 2020, 70,00 km of a new 2x2 motorway for the connection between Sebes and Turda; — To improve the traffic efficiency through reduction of the travel time; — To improve transport efficiency through reduction of operation and maintenance costs (both for users and infrastructure operator); — To improve traffic safety; — To reduce environmental impact; — To improve accessibility. After both phases are going to be Finalised, the project as an overall will accomplish the general objectives of the program – Priority Axis 2: Development of a multimodal, quality, sustainable and efficient transport system. (English)
16 September 2021
0 references
Les principaux objectifs socio-économiques des projets sont les suivants: — Construction de: 8 jonctions (y compris le carrefour routier Dumbrava), 4 services, 4 aires de repos, 1 centre d’entretien et de contrôle, 1 centre d’entretien et de surveillance et 66 structures; — À assurer d’ici la fin de 2020, 70,00 km d’une nouvelle autoroute 2x2 pour la liaison entre Sebes et Turda; — Améliorer l’efficacité du trafic en réduisant le temps de trajet; — Améliorer l’efficacité des transports en réduisant les coûts d’exploitation et d’entretien (tant pour les utilisateurs que pour l’exploitant de l’infrastructure); — Améliorer la sécurité routière; — Réduire l’impact sur l’environnement; — Améliorer l’accessibilité. Une fois les deux phases terminées, le projet en tant qu’ensemble permettra d’atteindre les objectifs généraux du programme — axe prioritaire 2: Développement d’un système de transport multimodal, de qualité, durable et efficace. (French)
27 November 2021
0 references
Die wichtigsten sozioökonomischen Ziele der Projekte sind: — Bau von: 8 Kreuzungen (einschließlich Dumbrava-Straßenkreuzung), 4 Service, 4 Ruhebereiche, 1 Wartungs- und Kontrollzentrum, 1 Wartungs- und Überwachungszentrum und 66 Strukturen; — Bis Ende 202 070,00 km einer neuen Autobahn 2x2 für die Verbindung zwischen Sebes und Turda zu gewährleisten; — Die Verkehrseffizienz durch Verkürzung der Reisezeit zu verbessern; — Verbesserung der Verkehrseffizienz durch Senkung der Betriebs- und Instandhaltungskosten (sowohl für die Nutzer als auch für den Infrastrukturbetreiber); — Zur Verbesserung der Verkehrssicherheit; — Verringerung der Umweltauswirkungen; — Die Zugänglichkeit zu verbessern. Nachdem beide Phasen abgeschlossen werden, wird das Projekt insgesamt die allgemeinen Ziele des Programms erreichen – Prioritätsachse 2: Entwicklung eines multimodalen, qualitativ hochwertigen, nachhaltigen und effizienten Verkehrssystems. (German)
1 December 2021
0 references
De belangrijkste sociaal-economische doelstellingen van de projecten zijn: — Bouw van: 8 knooppunten (met inbegrip van knooppunt Dumbrava), 4 dienst, 4 rustplaatsen, 1 onderhouds- en controlecentrum, 1 onderhouds- en controlecentrum en 66 structuren; Tegen het einde van 202 070,00 km van een nieuwe autosnelweg 2x2 voor de verbinding tussen Sebes en Turda; — De verkeersefficiëntie te verbeteren door de reistijd te verkorten; — Verbetering van de efficiëntie van het vervoer door vermindering van de exploitatie- en onderhoudskosten (zowel voor gebruikers als voor infrastructuurbeheerders); — Om de verkeersveiligheid te verbeteren; Om de milieueffecten te verminderen; — Om de toegankelijkheid te verbeteren. Nadat beide fasen zijn afgerond, zal het project in het algemeen de algemene doelstellingen van het programma verwezenlijken — Prioriteitsas 2: Ontwikkeling van een multimodaal, kwalitatief, duurzaam en efficiënt vervoerssysteem. (Dutch)
5 December 2021
0 references
Municipiul Sebeş, Romania
0 references
Municipiul Turda, Romania
0 references
Identifiers
118317
0 references