Pamus 4 – Interface of Mirandela railway station (floor floor) (Q2895568): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
PAMUs 4 — Interface de la gare de Mirandela (étage) | |||||||||||||||
Property / summary | |||||||||||||||
La requalification du bâtiment est intégrée dans une intervention plus large, à réaliser dans son environnement extérieur, avec l’extension de la plate-forme et sa couverture, à la ligne de chemin de fer active, y compris la construction d’une interface en mode lisse (station de recharge pour vélos électriques) adjacente à l’actuel office de tourisme, qui sera également associée à la gestion de l’interface. (French) | |||||||||||||||
Property / summary: La requalification du bâtiment est intégrée dans une intervention plus large, à réaliser dans son environnement extérieur, avec l’extension de la plate-forme et sa couverture, à la ligne de chemin de fer active, y compris la construction d’une interface en mode lisse (station de recharge pour vélos électriques) adjacente à l’actuel office de tourisme, qui sera également associée à la gestion de l’interface. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: La requalification du bâtiment est intégrée dans une intervention plus large, à réaliser dans son environnement extérieur, avec l’extension de la plate-forme et sa couverture, à la ligne de chemin de fer active, y compris la construction d’une interface en mode lisse (station de recharge pour vélos électriques) adjacente à l’actuel office de tourisme, qui sera également associée à la gestion de l’interface. (French) / qualifier | |||||||||||||||
point in time: 5 December 2021
|
Revision as of 17:25, 5 December 2021
Project Q2895568 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Pamus 4 – Interface of Mirandela railway station (floor floor) |
Project Q2895568 in Portugal |
Statements
726,664.0 Euro
0 references
854,898.0 Euro
0 references
85.0 percent
0 references
30 June 2021
0 references
30 June 2023
0 references
MUNICÍPIO DE MIRANDELA
0 references
Q3000043 (Deleted Item)
0 references
A requalificação do edifício é integrada numa intervenção mais alargada, a realizar na sua envolvente exterior, com o alargamento da plataforma e respectiva cobertura, até à linha férrea ativa, incluindo ainda a construção de um interface de modos suaves (posto de carregamento para bicicletas eléctricas) adjacente ao atual posto de turismo, que também passará a ficar associado à gestão do interface. (Portuguese)
0 references
The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface. (English)
8 July 2021
0 references
La requalification du bâtiment est intégrée dans une intervention plus large, à réaliser dans son environnement extérieur, avec l’extension de la plate-forme et sa couverture, à la ligne de chemin de fer active, y compris la construction d’une interface en mode lisse (station de recharge pour vélos électriques) adjacente à l’actuel office de tourisme, qui sera également associée à la gestion de l’interface. (French)
5 December 2021
0 references
Mirandela
0 references
Identifiers
NORTE-05-1406-FEDER-000288
0 references