Creation of an integrated network of Cyclovias to support intra and interconcelhias urban displacements – 1st phase – Benefit of the Municipal Mobility Conditions. (Q2895352): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Création d’un réseau intégré de pistes cyclables pour soutenir les déplacements urbains intra- et inter-concepts — 1ère phase — Avantage des conditions de mobilité de la municipalité.
Property / summary
 
Piste cyclable de 10 km aux destinations suivantes: Av. da República Rua Tomaz Ribeiro Rua do Godinho Rua 1 de décembre Rua Gago Coutinho Rua Conde S. Salvador Rua Álvaro Castelões Rua França Júnior Av. Duarte Pacheco Rua de Santo Amaro Link Av. Duarte Pacheco vers le pont mobile Bridge Mobile Link Mobile Bridge vers Av. Antunes Guimarães). (French)
Property / summary: Piste cyclable de 10 km aux destinations suivantes: Av. da República Rua Tomaz Ribeiro Rua do Godinho Rua 1 de décembre Rua Gago Coutinho Rua Conde S. Salvador Rua Álvaro Castelões Rua França Júnior Av. Duarte Pacheco Rua de Santo Amaro Link Av. Duarte Pacheco vers le pont mobile Bridge Mobile Link Mobile Bridge vers Av. Antunes Guimarães). (French) / rank
 
Normal rank
Property / summary: Piste cyclable de 10 km aux destinations suivantes: Av. da República Rua Tomaz Ribeiro Rua do Godinho Rua 1 de décembre Rua Gago Coutinho Rua Conde S. Salvador Rua Álvaro Castelões Rua França Júnior Av. Duarte Pacheco Rua de Santo Amaro Link Av. Duarte Pacheco vers le pont mobile Bridge Mobile Link Mobile Bridge vers Av. Antunes Guimarães). (French) / qualifier
 
point in time: 5 December 2021
Timestamp+2021-12-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:12, 5 December 2021

Project Q2895352 in Portugal
Language Label Description Also known as
English
Creation of an integrated network of Cyclovias to support intra and interconcelhias urban displacements – 1st phase – Benefit of the Municipal Mobility Conditions.
Project Q2895352 in Portugal

    Statements

    0 references
    124,127.0 Euro
    0 references
    146,032.0 Euro
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2017
    0 references
    MUNICIPIO DE MATOSINHOS
    0 references
    0 references

    41°10'50.45"N, 8°40'55.92"W
    0 references
    Ciclovia de 10 Km nos seguintes destinos : Av. da República Rua Tomaz Ribeiro Rua do Godinho Rua 1º de Dezembro Rua Gago Coutinho Rua Conde S. Salvador Rua Álvaro Castelões Rua França Júnior Av. Duarte Pacheco Rua de Santo Amaro Ligação Av. Duarte Pacheco à Ponte Móvel Ponte Móvel Ligação Ponte Móvel à Av. Antunes Guimarães). (Portuguese)
    0 references
    10 Km bike path at the following destinations: Republic Av. Tomaz Ribeiro Street Godinho Street December 1st Street Gago Coutinho Rua Conde S. Salvador Rua Álvaro Castelões Rua França Júnior Av. Duarte Pacheco Rua de Santo Amaro Link Av. Duarte Pacheco to the Mobile Bridge Mobile Bridge Connection Mobile Bridge to Av. Antunes Guimarães). (English)
    8 July 2021
    0 references
    Piste cyclable de 10 km aux destinations suivantes: Av. da República Rua Tomaz Ribeiro Rua do Godinho Rua 1 de décembre Rua Gago Coutinho Rua Conde S. Salvador Rua Álvaro Castelões Rua França Júnior Av. Duarte Pacheco Rua de Santo Amaro Link Av. Duarte Pacheco vers le pont mobile Bridge Mobile Link Mobile Bridge vers Av. Antunes Guimarães). (French)
    5 December 2021
    0 references
    Matosinhos
    0 references

    Identifiers

    NORTE-05-1406-FEDER-000017
    0 references