Pamus Route 2 Corridor Ciclável Centro de Ílhavo – Avenida dos Bacalhoeiros (Nó) (Q2878167): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
PAMUs Route 2 Corridor cyclable Centro de Ílhavo — Avenida dos Bacalhoeiros (Non) | |||||||||||||||
Property / summary | |||||||||||||||
Cette intervention prévoit la construction d’un couloir cyclable entre le centre de Ílhavo et l’Avenida dos Bacalhoeiros, reliant ainsi les paroisses de São Salvador et Gafanha da Nazaré, dans le but général de séparer la circulation des cycles de la circulation motorisée, avec les avantages qui en découlent en termes de sécurité. (French) | |||||||||||||||
Property / summary: Cette intervention prévoit la construction d’un couloir cyclable entre le centre de Ílhavo et l’Avenida dos Bacalhoeiros, reliant ainsi les paroisses de São Salvador et Gafanha da Nazaré, dans le but général de séparer la circulation des cycles de la circulation motorisée, avec les avantages qui en découlent en termes de sécurité. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Cette intervention prévoit la construction d’un couloir cyclable entre le centre de Ílhavo et l’Avenida dos Bacalhoeiros, reliant ainsi les paroisses de São Salvador et Gafanha da Nazaré, dans le but général de séparer la circulation des cycles de la circulation motorisée, avec les avantages qui en découlent en termes de sécurité. (French) / qualifier | |||||||||||||||
point in time: 4 December 2021
|
Revision as of 22:56, 4 December 2021
Project Q2878167 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Pamus Route 2 Corridor Ciclável Centro de Ílhavo – Avenida dos Bacalhoeiros (Nó) |
Project Q2878167 in Portugal |
Statements
234,620.0 Euro
0 references
276,024.0 Euro
0 references
85.0 percent
0 references
12 October 2020
0 references
6 December 2021
0 references
MUNICÍPIO DE ÍLHAVO
0 references
Q2991046 (Deleted Item)
0 references
Esta intervenção prevê a construção de um corredor ciclável entre o centro de Ílhavo e a Avenida dos Bacalhoeiros, ligando assim as freguesias de São Salvador e Gafanha da Nazaré.De uma forma geral pretende-se segregar a circulação de velocípedes do trânsito motorizado, com os consequentes benefícios em termos de segurança. (Portuguese)
0 references
This intervention provides for the construction of a cyclable corridor between the center of Ílhavo and Avenida dos Bacalhoeiros, thus linking the parishes of São Salvador and Gafanha da Nazaré.In general, it is intended to segregate the circulation of bicycles from motorised traffic, with the consequent safety benefits. (English)
7 July 2021
0 references
Cette intervention prévoit la construction d’un couloir cyclable entre le centre de Ílhavo et l’Avenida dos Bacalhoeiros, reliant ainsi les paroisses de São Salvador et Gafanha da Nazaré, dans le but général de séparer la circulation des cycles de la circulation motorisée, avec les avantages qui en découlent en termes de sécurité. (French)
4 December 2021
0 references
Ílhavo, Ílhavo (São Salvador)
0 references
Identifiers
CENTRO-09-1406-FEDER-000044
0 references