Shared Bicycle System – Phase 1 (Q2878147): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Système de vélo partagé — Phase 1 | |||||||||||||||
Property / summary | |||||||||||||||
Le deuxième amendement proposé par le promoteur est de nature temporelle, physique et financière. L’objectif est de modifier la date de fin de l’opération, conformément à l’exécution du contrat d’achat de biens, avec l’adaptation consécutive de la répartition annuelle de l’investissement éligible. (French) | |||||||||||||||
Property / summary: Le deuxième amendement proposé par le promoteur est de nature temporelle, physique et financière. L’objectif est de modifier la date de fin de l’opération, conformément à l’exécution du contrat d’achat de biens, avec l’adaptation consécutive de la répartition annuelle de l’investissement éligible. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Le deuxième amendement proposé par le promoteur est de nature temporelle, physique et financière. L’objectif est de modifier la date de fin de l’opération, conformément à l’exécution du contrat d’achat de biens, avec l’adaptation consécutive de la répartition annuelle de l’investissement éligible. (French) / qualifier | |||||||||||||||
point in time: 4 December 2021
|
Revision as of 22:55, 4 December 2021
Project Q2878147 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Shared Bicycle System – Phase 1 |
Project Q2878147 in Portugal |
Statements
166,948.0 Euro
0 references
196,409.0 Euro
0 references
85.0 percent
0 references
3 May 2017
0 references
31 March 2020
0 references
MUNICIPIO DA FIGUEIRA DA FOZ
0 references
A segunda alteração proposta pelo promotor é de natureza temporal, física e financeira. Pretende-se alterar a data de fim da operação, de acordo com a execução do contrato de aquisição de bens, com o consequente ajustamento da distribuição anual do investimento elegível. (Portuguese)
0 references
The second amendment proposed by the promoter is of a temporal, physical and financial nature. It is intended to change the end date of the operation in accordance with the execution of the contract for acquisition of assets, with the consequent adjustment of the annual distribution of the eligible investment. (English)
7 July 2021
0 references
Le deuxième amendement proposé par le promoteur est de nature temporelle, physique et financière. L’objectif est de modifier la date de fin de l’opération, conformément à l’exécution du contrat d’achat de biens, avec l’adaptation consécutive de la répartition annuelle de l’investissement éligible. (French)
4 December 2021
0 references
Figueira da Foz, Buarcos
0 references
Identifiers
CENTRO-09-1406-FEDER-000020
0 references