REHABILITATION OF TONDELA SECONDARY SCHOOL PHASE 1 (Q2870983): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
RÉHABILITATION DE L’ÉCOLE SECONDAIRE DE TONDELA PHASE 1
Property / summary
 
L’opération qui fait l’objet de la demande vise à la réhabilitation de l’école secondaire de Tondela (Blocs C, C, E et F et espaces extérieurs adjacents), afin de remédier aux situations d’usure matérielle du bâtiment, de corriger les pathologies et d’adoucir les symptômes de dégradation évidente, mais aussi, en cherchant à adapter les structures existantes aux nouveaux besoins que le concept d’éducation, en constante évolution, exige. (French)
Property / summary: L’opération qui fait l’objet de la demande vise à la réhabilitation de l’école secondaire de Tondela (Blocs C, C, E et F et espaces extérieurs adjacents), afin de remédier aux situations d’usure matérielle du bâtiment, de corriger les pathologies et d’adoucir les symptômes de dégradation évidente, mais aussi, en cherchant à adapter les structures existantes aux nouveaux besoins que le concept d’éducation, en constante évolution, exige. (French) / rank
 
Normal rank
Property / summary: L’opération qui fait l’objet de la demande vise à la réhabilitation de l’école secondaire de Tondela (Blocs C, C, E et F et espaces extérieurs adjacents), afin de remédier aux situations d’usure matérielle du bâtiment, de corriger les pathologies et d’adoucir les symptômes de dégradation évidente, mais aussi, en cherchant à adapter les structures existantes aux nouveaux besoins que le concept d’éducation, en constante évolution, exige. (French) / qualifier
 
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:11, 4 December 2021

Project Q2870983 in Portugal
Language Label Description Also known as
English
REHABILITATION OF TONDELA SECONDARY SCHOOL PHASE 1
Project Q2870983 in Portugal

    Statements

    0 references
    1,575,479.0 Euro
    0 references
    1,853,504.0 Euro
    0 references
    85.0 percent
    0 references
    12 February 2017
    0 references
    31 December 2018
    0 references
    MUNICÍPIO DE TONDELA
    0 references
    0 references

    40°30'50.65"N, 8°4'47.03"W
    0 references
    A operação objeto da candidatura que se apresenta visa a reabilitação da Escola Secundária de Tondela (Blocos C, C, E e F e espaços exteriores adjacentes), no sentido de colmatar as situações de desgaste material do edificado, retificando patologias e amenizando os sintomas de evidente degradação, mas também, procurando adequar as estruturas existentes às novas necessidades que o conceito de ensino, em permanente mutação, exige. (Portuguese)
    0 references
    The operation object of the application that is presented aims at the rehabilitation of the Secondary School of Tondela (Blocks C, C, E and F and adjacent exterior spaces), in order to fill the situations of material wear of the building, rectifying pathologies and mitigating the symptoms of evident degradation, but also, seeking to adapt the existing structures to the new needs that the concept of teaching, constantly changing, requires. (English)
    7 July 2021
    0 references
    L’opération qui fait l’objet de la demande vise à la réhabilitation de l’école secondaire de Tondela (Blocs C, C, E et F et espaces extérieurs adjacents), afin de remédier aux situations d’usure matérielle du bâtiment, de corriger les pathologies et d’adoucir les symptômes de dégradation évidente, mais aussi, en cherchant à adapter les structures existantes aux nouveaux besoins que le concept d’éducation, en constante évolution, exige. (French)
    4 December 2021
    0 references
    Tondela, União das freguesias de Tondela e Nandufe
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000061
    0 references