Requalification of the coverage of the EB School 2.3 of Porto Alto (Q2862860): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Requalification de la couverture de l’école EB 2.3 de Porto Alto
Property / summary
 
L’opération en question consiste en l’enlèvement et le remplacement du toit en amiante-ciment du bâtiment Escola EB 2.3 do Porto Alto. Il se compose de deux composantes (préparation du projet technique et exécution du contrat) et présente un investissement total de 158 043,91 EUR. La superficie totale d’intervention est de 2 397,00 m². (French)
Property / summary: L’opération en question consiste en l’enlèvement et le remplacement du toit en amiante-ciment du bâtiment Escola EB 2.3 do Porto Alto. Il se compose de deux composantes (préparation du projet technique et exécution du contrat) et présente un investissement total de 158 043,91 EUR. La superficie totale d’intervention est de 2 397,00 m². (French) / rank
 
Normal rank
Property / summary: L’opération en question consiste en l’enlèvement et le remplacement du toit en amiante-ciment du bâtiment Escola EB 2.3 do Porto Alto. Il se compose de deux composantes (préparation du projet technique et exécution du contrat) et présente un investissement total de 158 043,91 EUR. La superficie totale d’intervention est de 2 397,00 m². (French) / qualifier
 
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:43, 4 December 2021

Project Q2862860 in Portugal
Language Label Description Also known as
English
Requalification of the coverage of the EB School 2.3 of Porto Alto
Project Q2862860 in Portugal

    Statements

    0 references
    158,044.0 Euro
    0 references
    158,044.0 Euro
    0 references
    100.0 percent
    0 references
    2 October 2020
    0 references
    2 October 2021
    0 references
    MUNICÍPIO DE BENAVENTE
    0 references
    Q2986459 (Deleted Item)
    0 references

    38°56'5.53"N, 8°52'8.36"W
    0 references
    A operação em apreço consiste na remoção e substituição da cobertura em fibrocimento do edifício da Escola EB 2,3 do Porto Alto. É constituída por duas componentes (elaboração do projeto técnico e execução da respetiva empreitada) e apresenta um investimento total no montante de 158.043,91EUR. A área total de intervenção é de 2.397,00 m2. (Portuguese)
    0 references
    The operation under consideration consists of removing and replacing the fibrocement cover of the EB School 2.3 building in Porto Alto. It consists of two components (development of the technical project and execution of the project) and has a total investment of EUR 158043,91. The total intervention area is 2397.00 m². (English)
    6 July 2021
    0 references
    L’opération en question consiste en l’enlèvement et le remplacement du toit en amiante-ciment du bâtiment Escola EB 2.3 do Porto Alto. Il se compose de deux composantes (préparation du projet technique et exécution du contrat) et présente un investissement total de 158 043,91 EUR. La superficie totale d’intervention est de 2 397,00 m². (French)
    4 December 2021
    0 references
    Benavente, Samora Correia
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000133
    0 references