Requalification of the Schools of the 1st Cycle of Basic Education and Portalegre Childhood Gardens – Phase 2 (Q2862767): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Requalification des écoles du 1er cycle de l’éducation de base et des jardins de l’enfance de Portalegre — Phase 2
Property / summary
 
L’objectif principal de cette opération est la requalification de l’Escola Básica de Alegrete, visant à améliorer ses conditions de fonctionnement, son confort et sa sécurité. Il s’agit d’une école centenaire qui a besoin d’une action urgente pour résoudre les problèmes existants, notamment en termes d’infiltration, d’isolation thermique (portes, volets et fenêtres), de planchers et de mobilier d’extérieur. (French)
Property / summary: L’objectif principal de cette opération est la requalification de l’Escola Básica de Alegrete, visant à améliorer ses conditions de fonctionnement, son confort et sa sécurité. Il s’agit d’une école centenaire qui a besoin d’une action urgente pour résoudre les problèmes existants, notamment en termes d’infiltration, d’isolation thermique (portes, volets et fenêtres), de planchers et de mobilier d’extérieur. (French) / rank
 
Normal rank
Property / summary: L’objectif principal de cette opération est la requalification de l’Escola Básica de Alegrete, visant à améliorer ses conditions de fonctionnement, son confort et sa sécurité. Il s’agit d’une école centenaire qui a besoin d’une action urgente pour résoudre les problèmes existants, notamment en termes d’infiltration, d’isolation thermique (portes, volets et fenêtres), de planchers et de mobilier d’extérieur. (French) / qualifier
 
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:37, 4 December 2021

Project Q2862767 in Portugal
Language Label Description Also known as
English
Requalification of the Schools of the 1st Cycle of Basic Education and Portalegre Childhood Gardens – Phase 2
Project Q2862767 in Portugal

    Statements

    0 references
    48,881.0 Euro
    0 references
    57,508.0 Euro
    0 references
    85.0 percent
    0 references
    1 October 2018
    0 references
    31 December 2019
    0 references
    MUNICIPIO DE PORTALEGRE
    0 references
    0 references

    39°14'28.64"N, 7°18'7.27"W
    0 references
    A presente operação tem como objectivo principal a requalificação da Escola Básica de Alegrete, visando a melhoria das suas condições de funcionamento, conforto e segurança. Trata-se de uma escola centenária que carece de uma intervenção urgente que permita resolver os problemas existentes, sobretudo, ao nível de infiltrações, isolamento térmico (portas, portadas e janelas), pisos e mobiliário de exterior. (Portuguese)
    0 references
    This operation has as main objective the requalification of the Basic School of Alegrete, aiming at improving its operating conditions, comfort and safety. It is a centuries-old school that needs urgent intervention to solve the problems that exist, especially in terms of infiltration, thermal insulation (doors, shutters and windows), floors and outdoor furniture. (English)
    6 July 2021
    0 references
    L’objectif principal de cette opération est la requalification de l’Escola Básica de Alegrete, visant à améliorer ses conditions de fonctionnement, son confort et sa sécurité. Il s’agit d’une école centenaire qui a besoin d’une action urgente pour résoudre les problèmes existants, notamment en termes d’infiltration, d’isolation thermique (portes, volets et fenêtres), de planchers et de mobilier d’extérieur. (French)
    4 December 2021
    0 references
    Portalegre, Alegrete
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000071
    0 references