Intervention in the terrestrial logistics circuits of S. Miguel – Rehabilitation and improvement of a section of ER 1-1.ª, between Rosario (Ribeira Grande) and Ribeirinha (Q2854023): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Intervention dans les circuits logistiques terrestres de S. Miguel — Réhabilitation et amélioration d’une section de ER 1-1st, entre Rosario (Ribeira Grande) et Ribeirinha | |||||||||||||||
Property / summary | |||||||||||||||
Cette opération consiste en une intervention à effectuer sur la route régionale no 1-1, entre Largo do Rosário, dans la paroisse de Matriz da Ribeira Grande, et le rond-point du nœud IPO dans la paroisse de Ribeirinha, dans une extension de 2,4 km.L’opération intègre, les travaux de construction d’un nouveau système de drainage, puisque la section actuelle présente de graves problèmes de drainage et de pavage, avec l’application d’une nouvelle couche d’usure tout au long de l’ext (French) | |||||||||||||||
Property / summary: Cette opération consiste en une intervention à effectuer sur la route régionale no 1-1, entre Largo do Rosário, dans la paroisse de Matriz da Ribeira Grande, et le rond-point du nœud IPO dans la paroisse de Ribeirinha, dans une extension de 2,4 km.L’opération intègre, les travaux de construction d’un nouveau système de drainage, puisque la section actuelle présente de graves problèmes de drainage et de pavage, avec l’application d’une nouvelle couche d’usure tout au long de l’ext (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Cette opération consiste en une intervention à effectuer sur la route régionale no 1-1, entre Largo do Rosário, dans la paroisse de Matriz da Ribeira Grande, et le rond-point du nœud IPO dans la paroisse de Ribeirinha, dans une extension de 2,4 km.L’opération intègre, les travaux de construction d’un nouveau système de drainage, puisque la section actuelle présente de graves problèmes de drainage et de pavage, avec l’application d’une nouvelle couche d’usure tout au long de l’ext (French) / qualifier | |||||||||||||||
point in time: 4 December 2021
|
Revision as of 15:33, 4 December 2021
Project Q2854023 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Intervention in the terrestrial logistics circuits of S. Miguel – Rehabilitation and improvement of a section of ER 1-1.ª, between Rosario (Ribeira Grande) and Ribeirinha |
Project Q2854023 in Portugal |
Statements
461,633.0 Euro
0 references
543,097.0 Euro
0 references
85.0 percent
0 references
9 June 2015
0 references
7 May 2018
0 references
SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
0 references
Esta operação consiste numa intervenção a efetuar na Estrada Regional nº 1-1ª, entre o Largo do Rosário, na Freguesia da Matriz da Ribeira Grande, e a rotunda do nó do IPO na Freguesia da Ribeirinha, numa extensão de 2.4 km.A operação integra, trabalhos de construção de novo sistema de drenagem, uma vez que o atual troço apresenta graves problemas de drenagem e trabalhos de pavimentação, com a aplicação de nova camada de desgaste em toda a exte (Portuguese)
0 references
This operation consists of an intervention to be carried out on the Regional Road No. 1-1ª, between Largo do Rosário, in the parish of the Matriz da Ribeira Grande, and the roundabout of the node of the IPO in the parish of Ribeirinha, an extension of 2,4 km.The operation integrates, construction works of new drainage system, since the current section presents serious problems of drainage and paving work, with the application of a new layer of wear throughout the exte (English)
6 July 2021
0 references
Cette opération consiste en une intervention à effectuer sur la route régionale no 1-1, entre Largo do Rosário, dans la paroisse de Matriz da Ribeira Grande, et le rond-point du nœud IPO dans la paroisse de Ribeirinha, dans une extension de 2,4 km.L’opération intègre, les travaux de construction d’un nouveau système de drainage, puisque la section actuelle présente de graves problèmes de drainage et de pavage, avec l’application d’une nouvelle couche d’usure tout au long de l’ext (French)
4 December 2021
0 references
Ribeira Grande
0 references
Identifiers
ACORES-07-2756-FEDER-000005
0 references