Intervention in the terrestrial logistical circuit of S. Miguel – Consolidation of the slopes of the Regional Road in the 2-2a, Furnas/Ribeira Quente section, in sections 6, 7, 9, 12, 13, 14, 15 (Q2854036): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in portugal one item from slovenia) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Intervention dans le circuit logistique terrestre de S. Miguel — Consolidation des pentes de la route régionale no 2-2a, section Furnas/Ribeira Quente, sur les sections 6, 7, 9, 12, 13, 14, 15 | |||||||||||||||
Property / summary | |||||||||||||||
Intervention sur plusieurs tronçons, à travers l’exécution de terrasses, les murs de soutènement, la déviation de la plate-forme, le drainage et la stabilisation des pentes (French) | |||||||||||||||
Property / summary: Intervention sur plusieurs tronçons, à travers l’exécution de terrasses, les murs de soutènement, la déviation de la plate-forme, le drainage et la stabilisation des pentes (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Intervention sur plusieurs tronçons, à travers l’exécution de terrasses, les murs de soutènement, la déviation de la plate-forme, le drainage et la stabilisation des pentes (French) / qualifier | |||||||||||||||
point in time: 4 December 2021
|
Revision as of 15:32, 4 December 2021
Project Q2854036 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Intervention in the terrestrial logistical circuit of S. Miguel – Consolidation of the slopes of the Regional Road in the 2-2a, Furnas/Ribeira Quente section, in sections 6, 7, 9, 12, 13, 14, 15 |
Project Q2854036 in Portugal |
Statements
1,160,989.0 Euro
0 references
1,365,869.0 Euro
0 references
85.0 percent
0 references
28 September 2017
0 references
31 August 2019
0 references
SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
0 references
Intervenção em vários troços, mediante a execução de terraplenagens, muros de suporte, desvio da plataforma, drenagem e estabilização de taludes (Portuguese)
0 references
Intervention in several sections, through the execution of earthworks, support walls, detour of the platform, drainage and stabilisation of slopes (English)
6 July 2021
0 references
Intervention sur plusieurs tronçons, à travers l’exécution de terrasses, les murs de soutènement, la déviation de la plate-forme, le drainage et la stabilisation des pentes (French)
4 December 2021
0 references
Povoação
0 references
Identifiers
ACORES-07-2756-FEDER-000016
0 references