Construction of rooftop and stationary photovoltaic installations in Luta, Orchówek, Włodawa (Q2705853): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: contained in NUTS (P1845): Bialski (Q2577153), Removing duplicate contained in NUTS)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Construction d’installations photovoltaïques fixes et de toit à Luta, Orchówek, Włodawa
Property / summary
 
L’objet du projet est la construction d’une installation photovoltaïque d’une puissance installée totale de 0,116 MW (116,25 kW) couvrant d’abord les besoins propres de l’entreprise en électricité. 1. GM. Włodawa, masc. Luta, dz no 20/2; L’alimentation est installée. 21,7 kW; stationnaire 2. GM. Włodawa, masc. Orchówek, dz no 650/3; L’alimentation est installée. 27,9 kW; cont. de toit 3. M. Włodawa, St. Światowida, dz no 1220/5; L’alimentation est installée. 49,6 kW; const. stationnaire 4. M. Włodawa, St. Chełmska, dz no 381/35; L’alimentation est installée. 17,05 kW; la requérante est propriétaire des propriétés susmentionnées. Au total, les installations seront composées de panneaux photovoltaïques haute performance (375 unités d’une puissance de 310 W) installés sur une structure en acier, reliés aux onduleurs avec un rendement d’au moins 98 %. Ce qui précède est détaillé dans les projets techniques et les estimations de coûts. En raison de l’emplacement de l’installation (l’une des régions les plus ensoleillées du pays), elle sera en mesure de produire un total d’environ 125 MWh d’électricité par an. L’électricité produite sera utilisée pour assurer les besoins propres de l’entreprise, l’excédent mis dans le réseau. La durée de vie estimée de l’installation est de 25 ans. La technologie utilisée est conforme aux normes environnementales de l’UE énoncées dans la communication du président du PKN relative à la liste des normes harmonisées. Le projet sera mis en œuvre au cours du second semestre 2021. À compter de la date de dépôt de la demande, la requérante dispose de tous les documents formels et juridiques (conformément à l’article 29, paragraphe 1. 2 paragraphe 16 de la loi de Bud. L’installation de dispositifs photovoltaïques d’une puissance électrique inférieure ou égale à 50 kW et de collecteurs autonomes n’exige pas de notification à l’autorité compétente ou d’autorisation de construction). Il n’y a pas de risque de défaillance de la mise en œuvre du projet pour des raisons indépendantes de la volonté de la requérante. Le projet sera mis en œuvre en une seule étape et, à la suite de la mise en œuvre du projet, il y aura une réduction des émissions de CO2 dans l’atmosphère. La période de mise en œuvre est adaptée aux éléments prévus du projet. (French)
Property / summary: L’objet du projet est la construction d’une installation photovoltaïque d’une puissance installée totale de 0,116 MW (116,25 kW) couvrant d’abord les besoins propres de l’entreprise en électricité. 1. GM. Włodawa, masc. Luta, dz no 20/2; L’alimentation est installée. 21,7 kW; stationnaire 2. GM. Włodawa, masc. Orchówek, dz no 650/3; L’alimentation est installée. 27,9 kW; cont. de toit 3. M. Włodawa, St. Światowida, dz no 1220/5; L’alimentation est installée. 49,6 kW; const. stationnaire 4. M. Włodawa, St. Chełmska, dz no 381/35; L’alimentation est installée. 17,05 kW; la requérante est propriétaire des propriétés susmentionnées. Au total, les installations seront composées de panneaux photovoltaïques haute performance (375 unités d’une puissance de 310 W) installés sur une structure en acier, reliés aux onduleurs avec un rendement d’au moins 98 %. Ce qui précède est détaillé dans les projets techniques et les estimations de coûts. En raison de l’emplacement de l’installation (l’une des régions les plus ensoleillées du pays), elle sera en mesure de produire un total d’environ 125 MWh d’électricité par an. L’électricité produite sera utilisée pour assurer les besoins propres de l’entreprise, l’excédent mis dans le réseau. La durée de vie estimée de l’installation est de 25 ans. La technologie utilisée est conforme aux normes environnementales de l’UE énoncées dans la communication du président du PKN relative à la liste des normes harmonisées. Le projet sera mis en œuvre au cours du second semestre 2021. À compter de la date de dépôt de la demande, la requérante dispose de tous les documents formels et juridiques (conformément à l’article 29, paragraphe 1. 2 paragraphe 16 de la loi de Bud. L’installation de dispositifs photovoltaïques d’une puissance électrique inférieure ou égale à 50 kW et de collecteurs autonomes n’exige pas de notification à l’autorité compétente ou d’autorisation de construction). Il n’y a pas de risque de défaillance de la mise en œuvre du projet pour des raisons indépendantes de la volonté de la requérante. Le projet sera mis en œuvre en une seule étape et, à la suite de la mise en œuvre du projet, il y aura une réduction des émissions de CO2 dans l’atmosphère. La période de mise en œuvre est adaptée aux éléments prévus du projet. (French) / rank
 
Normal rank
Property / summary: L’objet du projet est la construction d’une installation photovoltaïque d’une puissance installée totale de 0,116 MW (116,25 kW) couvrant d’abord les besoins propres de l’entreprise en électricité. 1. GM. Włodawa, masc. Luta, dz no 20/2; L’alimentation est installée. 21,7 kW; stationnaire 2. GM. Włodawa, masc. Orchówek, dz no 650/3; L’alimentation est installée. 27,9 kW; cont. de toit 3. M. Włodawa, St. Światowida, dz no 1220/5; L’alimentation est installée. 49,6 kW; const. stationnaire 4. M. Włodawa, St. Chełmska, dz no 381/35; L’alimentation est installée. 17,05 kW; la requérante est propriétaire des propriétés susmentionnées. Au total, les installations seront composées de panneaux photovoltaïques haute performance (375 unités d’une puissance de 310 W) installés sur une structure en acier, reliés aux onduleurs avec un rendement d’au moins 98 %. Ce qui précède est détaillé dans les projets techniques et les estimations de coûts. En raison de l’emplacement de l’installation (l’une des régions les plus ensoleillées du pays), elle sera en mesure de produire un total d’environ 125 MWh d’électricité par an. L’électricité produite sera utilisée pour assurer les besoins propres de l’entreprise, l’excédent mis dans le réseau. La durée de vie estimée de l’installation est de 25 ans. La technologie utilisée est conforme aux normes environnementales de l’UE énoncées dans la communication du président du PKN relative à la liste des normes harmonisées. Le projet sera mis en œuvre au cours du second semestre 2021. À compter de la date de dépôt de la demande, la requérante dispose de tous les documents formels et juridiques (conformément à l’article 29, paragraphe 1. 2 paragraphe 16 de la loi de Bud. L’installation de dispositifs photovoltaïques d’une puissance électrique inférieure ou égale à 50 kW et de collecteurs autonomes n’exige pas de notification à l’autorité compétente ou d’autorisation de construction). Il n’y a pas de risque de défaillance de la mise en œuvre du projet pour des raisons indépendantes de la volonté de la requérante. Le projet sera mis en œuvre en une seule étape et, à la suite de la mise en œuvre du projet, il y aura une réduction des émissions de CO2 dans l’atmosphère. La période de mise en œuvre est adaptée aux éléments prévus du projet. (French) / qualifier
 
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:46, 4 December 2021

Project Q2705853 in Poland
Language Label Description Also known as
English
Construction of rooftop and stationary photovoltaic installations in Luta, Orchówek, Włodawa
Project Q2705853 in Poland

    Statements

    0 references
    0 references
    212,443.64 zloty
    0 references
    47,226.22 Euro
    0.2223 Euro
    0 references
    326,836.39 zloty
    0 references
    72,655.73 Euro
    0.2223 Euro
    0 references
    65.0 percent
    0 references
    1 January 2021
    0 references
    30 June 2021
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWE "FRANKPOL" FRANCISZEK BRZOZOWSKI
    0 references
    0 references

    51°32'29.4"N, 23°31'43.7"E
    0 references

    51°43'54.8"N, 23°29'42.7"E
    0 references
    Przedmiotem projektu jest budowa instalacji fotowolt. o łącznej mocy zainstalowanej 0,116 MW (116,25 kW) pokrywającej w pierwszej kolejności potrzeby własne przedsiębiorstwa na energie elektr., zlokalizowane w: 1. Gm. Włodawa, msc. Luta, dz nr 20/2; moc zainstal. 21,7 kW; konstr. stacjonarna 2. Gm. Włodawa, msc. Orchówek, dz nr 650/3; moc zainstal. 27,9 kW; konstr. dachowa 3. M. Włodawa, ul. Światowida, dz nr 1220/5; moc zainstal. 49,6 kW; konstr. stacjonarna 4. M. Włodawa, ul. Chełmska, dz nr 381/35; moc zainstal. 17,05 kW; konstr. dachowa Wnioskodawca jest właścicielem powyższych nieruchomości. Instalacje łącznie będą się składać z wysokowydajnych paneli fotowoltaicznych (375 szt. o mocy 310 W) zainstalowanych na konstrukcji stalowej, podłączonych do inwerterów o sprawności co najmniej 98%. Szczegółowo powyższe przedstawiono w projektach technicznych oraz kosztorysach. Ze względu na położenie instalacji (jeden z najbardziej nasłonecznionych regionów w kraju) będzie ona w stanie wyprodukować w ciągu roku łącznie około 125 MWh energii elektr. Wytworzona energia elektr. będzie zużyta na zapewnienie potrzeb własnych przedsiębiorstwa, nadwyżka oddawana do sieci. Przewidywany czas eksploatacji instalacji to 25 lat. Zastosowana technologia spełnia normy ekologiczne UE określone w obwieszczeniach Prezesa PKN w sprawie wykazu norm zharmonizowanych. Projekt będzie realizowany w II połowie 2021 r. Na dzień złożenia wniosku Wnioskodawca posiada wszystkie formalno-prawne dokumenty (zgodnie z art. 29 ust. 2 pkt 16 Prawa Bud. Montaż urządzeń fotowoltaicznych o zainstal. mocy elektrycznej do 50 kW oraz wolnostojących kolektorów nie wymaga zgłoszenia właściwemu organowi ani pozwolenia na budowę), nie występuje ryzyko nie zrealizowania projektu z przyczyn niezależnych od Wnioskodawcy. Projekt będzie realizowany jednoetapowo.W wyniku realizacji projektu nastąpi zmniejszenie emisji CO2 do atmosfery. Okres realizacji jest adekwatny do zaplanowanych elementów projektu. (Polish)
    0 references
    The object of the project is the construction of a photovoltage installation with a total installed capacity of 0,116 MW (116.25 kW) covering first the company’s own needs on electr., located in: 1. GM. Włodawa, masc. Luta, dz No 20/2; power’s installed. 21,7 kW; stationary 2. GM. Włodawa, masc. Orchówek, dz No 650/3; power’s installed. 27.9 kW; roof cont. 3. M. Włodawa, st. Światowida, dz No. 1220/5; power’s installed. 49,6 kW; stationary Const. 4. M. Włodawa, st. Chełmska, dz No 381/35; power’s installed. 17,05 kW; the Applicant is the owner of the above properties. In total, the installations will consist of high-performance photovoltaic panels (375 units with a power of 310 W) installed on a steel structure, connected to inverters with an efficiency of at least 98 %. The above is detailed in the technical projects and cost estimates. Due to the location of the installation (one of the most sunny regions in the country), it will be able to produce a total of around 125 MWh of electricity per year. The generated electricity will be used to ensure the company’s own needs, the surplus put into the grid. The estimated lifetime of the installation is 25 years. The technology used complies with the EU environmental standards set out in the PKN President’s notice on the list of harmonised standards. The project will be implemented in the second half of 2021. As of the date of submission of the application, the Applicant has all formal and legal documents (in accordance with Article 29 para. 2 point 16 of the Law of Bud. Installation of photovoltaic devices with electrical power up to 50 kW and freestanding collectors does not require notification to the competent authority or construction permit), there is no risk of failure to implement the project for reasons beyond the control of the Applicant. The project will be implemented in one step. As a result of the implementation of the project there will be a reduction of CO2 emissions into the atmosphere. The implementation period is appropriate to the planned elements of the project. (English)
    7 July 2021
    0 references
    L’objet du projet est la construction d’une installation photovoltaïque d’une puissance installée totale de 0,116 MW (116,25 kW) couvrant d’abord les besoins propres de l’entreprise en électricité. 1. GM. Włodawa, masc. Luta, dz no 20/2; L’alimentation est installée. 21,7 kW; stationnaire 2. GM. Włodawa, masc. Orchówek, dz no 650/3; L’alimentation est installée. 27,9 kW; cont. de toit 3. M. Włodawa, St. Światowida, dz no 1220/5; L’alimentation est installée. 49,6 kW; const. stationnaire 4. M. Włodawa, St. Chełmska, dz no 381/35; L’alimentation est installée. 17,05 kW; la requérante est propriétaire des propriétés susmentionnées. Au total, les installations seront composées de panneaux photovoltaïques haute performance (375 unités d’une puissance de 310 W) installés sur une structure en acier, reliés aux onduleurs avec un rendement d’au moins 98 %. Ce qui précède est détaillé dans les projets techniques et les estimations de coûts. En raison de l’emplacement de l’installation (l’une des régions les plus ensoleillées du pays), elle sera en mesure de produire un total d’environ 125 MWh d’électricité par an. L’électricité produite sera utilisée pour assurer les besoins propres de l’entreprise, l’excédent mis dans le réseau. La durée de vie estimée de l’installation est de 25 ans. La technologie utilisée est conforme aux normes environnementales de l’UE énoncées dans la communication du président du PKN relative à la liste des normes harmonisées. Le projet sera mis en œuvre au cours du second semestre 2021. À compter de la date de dépôt de la demande, la requérante dispose de tous les documents formels et juridiques (conformément à l’article 29, paragraphe 1. 2 paragraphe 16 de la loi de Bud. L’installation de dispositifs photovoltaïques d’une puissance électrique inférieure ou égale à 50 kW et de collecteurs autonomes n’exige pas de notification à l’autorité compétente ou d’autorisation de construction). Il n’y a pas de risque de défaillance de la mise en œuvre du projet pour des raisons indépendantes de la volonté de la requérante. Le projet sera mis en œuvre en une seule étape et, à la suite de la mise en œuvre du projet, il y aura une réduction des émissions de CO2 dans l’atmosphère. La période de mise en œuvre est adaptée aux éléments prévus du projet. (French)
    4 December 2021
    0 references

    Identifiers

    RPLU.04.02.00-06-0033/20
    0 references