Extension of the provincial road no. 560 by building a walking and cycling path from Osiek through the village of Gorczenica (Brodnica Municipality) to the city of Brodnica (Q2699150): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: contained in NUTS (P1845): Grudziądzki (Q2577120), Removing duplicate contained in NUTS)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Extension de la route provinciale no 560 par la construction d’une piste pédestre et cyclable d’Osiek en passant par le village de Gorczenica (municipalité de Brodnica) jusqu’à la ville de Brodnica
Property / summary
 
Ce projet comprend la construction d’une piste cyclable le long de la route de voïvodie no 560 sur la section d’Osiek, en passant par Gorczenica jusqu’au rond-point de Varsovie à Brodnica. Le début de la piste cyclable et pédestre a été situé à Brodnica, environ 3 km + 350 de la route provinciale, à l’intersection des rues Podgórna — Długa — Al. Józefa Piłsudski (Rondo Warszawskie), à l’entrée de la rue Podgórna. Le sentier relie ici avec des itinéraires de randonnée et de cyclisme existants. Dans la section initiale (environ 300 m), un sentier est planifié directement au bord de la chaussée de la route provinciale, sur son côté droit. Sur la section suivante, l’itinéraire devrait être enlevé de la route, derrière les fossés et les pentes de la route provinciale. Dans certains endroits, en raison de la forme défavorable ou du développement de la zone, le sentier est prévu d’approcher la chaussée de la route provinciale à une distance minimale de 0,5 m du bord de la chaussée. L’extrémité du tronçon est conçue à environ 9 + 680 km de la route provinciale, à Osiek, avec un lien avec le trottoir existant.Dans les zones piétonnes, il y aura des plaques «FOCUS» pour les personnes handicapées qui empruntent le passage à niveau. Il est envisagé de démolir partiellement la surface de la route dans les endroits reliés à la piste cyclable prévue pour le système routier existant.Paramètres de base de la nouvelle largeur de la piste cyclable à pied: 2,5 m-longueur de marche et de piste cyclable: 6 630 mL’investissement couvrira:- la construction d’une piste piétonne-vélo-reconstruction des issues- la construction et la reconstruction de ponceaux- la construction d’un mur de soutènement- la construction et la reconstruction d’éléments de drainage — démolition d’éléments existants d’aménagement du territoire, travaux contradictoires de construction- l’abattage des arbres et des arbustes- régulation et protection des éléments existants du réseau d’armement terrestre — installation de panneaux et dispositifs de sécurité routière — construction d’éclairage routier. (French)
Property / summary: Ce projet comprend la construction d’une piste cyclable le long de la route de voïvodie no 560 sur la section d’Osiek, en passant par Gorczenica jusqu’au rond-point de Varsovie à Brodnica. Le début de la piste cyclable et pédestre a été situé à Brodnica, environ 3 km + 350 de la route provinciale, à l’intersection des rues Podgórna — Długa — Al. Józefa Piłsudski (Rondo Warszawskie), à l’entrée de la rue Podgórna. Le sentier relie ici avec des itinéraires de randonnée et de cyclisme existants. Dans la section initiale (environ 300 m), un sentier est planifié directement au bord de la chaussée de la route provinciale, sur son côté droit. Sur la section suivante, l’itinéraire devrait être enlevé de la route, derrière les fossés et les pentes de la route provinciale. Dans certains endroits, en raison de la forme défavorable ou du développement de la zone, le sentier est prévu d’approcher la chaussée de la route provinciale à une distance minimale de 0,5 m du bord de la chaussée. L’extrémité du tronçon est conçue à environ 9 + 680 km de la route provinciale, à Osiek, avec un lien avec le trottoir existant.Dans les zones piétonnes, il y aura des plaques «FOCUS» pour les personnes handicapées qui empruntent le passage à niveau. Il est envisagé de démolir partiellement la surface de la route dans les endroits reliés à la piste cyclable prévue pour le système routier existant.Paramètres de base de la nouvelle largeur de la piste cyclable à pied: 2,5 m-longueur de marche et de piste cyclable: 6 630 mL’investissement couvrira:- la construction d’une piste piétonne-vélo-reconstruction des issues- la construction et la reconstruction de ponceaux- la construction d’un mur de soutènement- la construction et la reconstruction d’éléments de drainage — démolition d’éléments existants d’aménagement du territoire, travaux contradictoires de construction- l’abattage des arbres et des arbustes- régulation et protection des éléments existants du réseau d’armement terrestre — installation de panneaux et dispositifs de sécurité routière — construction d’éclairage routier. (French) / rank
 
Normal rank
Property / summary: Ce projet comprend la construction d’une piste cyclable le long de la route de voïvodie no 560 sur la section d’Osiek, en passant par Gorczenica jusqu’au rond-point de Varsovie à Brodnica. Le début de la piste cyclable et pédestre a été situé à Brodnica, environ 3 km + 350 de la route provinciale, à l’intersection des rues Podgórna — Długa — Al. Józefa Piłsudski (Rondo Warszawskie), à l’entrée de la rue Podgórna. Le sentier relie ici avec des itinéraires de randonnée et de cyclisme existants. Dans la section initiale (environ 300 m), un sentier est planifié directement au bord de la chaussée de la route provinciale, sur son côté droit. Sur la section suivante, l’itinéraire devrait être enlevé de la route, derrière les fossés et les pentes de la route provinciale. Dans certains endroits, en raison de la forme défavorable ou du développement de la zone, le sentier est prévu d’approcher la chaussée de la route provinciale à une distance minimale de 0,5 m du bord de la chaussée. L’extrémité du tronçon est conçue à environ 9 + 680 km de la route provinciale, à Osiek, avec un lien avec le trottoir existant.Dans les zones piétonnes, il y aura des plaques «FOCUS» pour les personnes handicapées qui empruntent le passage à niveau. Il est envisagé de démolir partiellement la surface de la route dans les endroits reliés à la piste cyclable prévue pour le système routier existant.Paramètres de base de la nouvelle largeur de la piste cyclable à pied: 2,5 m-longueur de marche et de piste cyclable: 6 630 mL’investissement couvrira:- la construction d’une piste piétonne-vélo-reconstruction des issues- la construction et la reconstruction de ponceaux- la construction d’un mur de soutènement- la construction et la reconstruction d’éléments de drainage — démolition d’éléments existants d’aménagement du territoire, travaux contradictoires de construction- l’abattage des arbres et des arbustes- régulation et protection des éléments existants du réseau d’armement terrestre — installation de panneaux et dispositifs de sécurité routière — construction d’éclairage routier. (French) / qualifier
 
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:49, 4 December 2021

Project Q2699150 in Poland
Language Label Description Also known as
English
Extension of the provincial road no. 560 by building a walking and cycling path from Osiek through the village of Gorczenica (Brodnica Municipality) to the city of Brodnica
Project Q2699150 in Poland

    Statements

    0 references
    4,676,098.88 zloty
    0 references
    1,039,496.78 Euro
    0.2223 Euro
    0 references
    5,501,292.81 zloty
    0 references
    1,222,937.39 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 October 2019
    0 references
    30 June 2021
    0 references
    GMINA BRODNICA
    0 references
    0 references

    53°15'28.8"N, 19°24'19.4"E
    0 references

    53°23'43.8"N, 19°8'53.5"E
    0 references

    53°10'8.8"N, 19°23'21.8"E
    0 references
    Przedmiotowy projekt obejmuje budowę ścieżki pieszo – rowerowej wzdłuż drogi wojewódzkiej nr 560 na odcinku od miejscowości Osiek, przez miejscowość Gorczenica do Ronda Warszawskiego w Brodnicy. Początek ścieżki pieszo – rowerowej zlokalizowano w Brodnicy, około km 3+050 drogi wojewódzkiej, na skrzyżowaniu ulic Podgórnej – Długiej – Al. Józefa Piłsudskiego (Rondo Warszawskie), na wlocie ulicy Podgórnej. Ścieżka łączy się w tym miejscu z istniejącymi ciągami pieszym i rowerowym. Na początkowym odcinku (około 300 m) planuje się ścieżkę bezpośrednio przy krawędzi jezdni drogi wojewódzkiej, po jej prawej stronie. Na dalszym odcinku przebieg ścieżki planuje się w odsunięciu od jezdni, za rowami i skarpami drogi wojewódzkiej. W niektórych miejscach, ze względu na niekorzystne ukształtowanie lub zagospodarowaniem terenu, ścieżkę planuje się zbliżyć do jezdni drogi wojewódzkiej w odległości minimum 0,5 m od krawędzi jezdni. Koniec odcinka projektuje się około km 9+680 drogi wojewódzkiej, w miejscowości Osiek, z dowiązaniem do istniejącego chodnika.W rejonach przejść dla pieszych ułożone będą płyty typu „FOCUS” z przeznaczeniem dla osób niepełnosprawnych korzystających z przejścia. Przewiduje się częściową rozbiórkę nawierzchni drogowych w miejscach dowiązań planowanej ścieżki pieszo-rowerowej do istniejącego układu drogowego.Podstawowe parametry nowobudowanej ścieżki pieszo – rowerowej-Szerokość ścieżki pieszo – rowerowej: 2,5 m-Długość ścieżki pieszo – rowerowej: 6 630 mInwestycja swoim zakresem obejmie:- budowę ścieżki pieszo-rowerowej- przebudowę zjazdów- budowę i przebudowę przepustów- budowę ściany oporowej- budowę i przebudowę elementów odwodnienia- rozbiórkę istniejących elementów zagospodarowania terenu, kolidujących robotami budowlanymi- wycinkę drzew i krzewów- regulację i zabezpieczenie istniejących elementów sieci uzbrojenia terenu- montaż oznakowania i urządzeń bezpieczeństwa ruchu drogowego- budowę oświetlenia drogowego. (Polish)
    0 references
    This project includes the construction of a walking-bike path along the voivodeship road no. 560 on the section from Osiek, through Gorczenica to the Warsaw Roundabout in Brodnica. The beginning of the walking and cycling path was located in Brodnica, about km 3 + 350 of the provincial road, at the intersection of Podgórna – Długa – Al streets. Józefa Piłsudski (Rondo Warszawskie), at the inlet of Podgórna Street. The path connects here with existing hiking and cycling routes. In the initial section (about 300 m), a path is planned directly at the edge of the roadway of the provincial road, on its right side. On the next section, the route is planned to be taken away from the roadway, behind the ditches and slopes of the provincial road. In some places, due to the unfavourable shape or development of the area, the path is planned to approach the roadway of the provincial road at a minimum distance of 0.5 m from the edge of the roadway. The end of the section is designed about 9 + 680 km of the provincial road, in Osiek, with a link to the existing pavement.In the pedestrian crossing areas, there will be “FOCUS” plates for disabled people using the crossing. It is envisaged to partially demolish the road surface in the places connected to the planned walking-bike path to the existing road system.Basic parameters of the newly built walking-bike path-width of the walking-bike path: 2,5 m-Length of walking and cycling path: 6 630 mThe investment will cover:- construction of a pedestrian-bike path-reconstruction of exits- construction and reconstruction of culverts- construction of a retaining wall- construction and reconstruction of drainage elements – demolition of existing land development elements, conflicting construction works- felling of trees and shrubs- regulation and protection of existing elements of the ground armament network – installation of road safety signs and devices – construction of road lighting. (English)
    7 July 2021
    0 references
    Ce projet comprend la construction d’une piste cyclable le long de la route de voïvodie no 560 sur la section d’Osiek, en passant par Gorczenica jusqu’au rond-point de Varsovie à Brodnica. Le début de la piste cyclable et pédestre a été situé à Brodnica, environ 3 km + 350 de la route provinciale, à l’intersection des rues Podgórna — Długa — Al. Józefa Piłsudski (Rondo Warszawskie), à l’entrée de la rue Podgórna. Le sentier relie ici avec des itinéraires de randonnée et de cyclisme existants. Dans la section initiale (environ 300 m), un sentier est planifié directement au bord de la chaussée de la route provinciale, sur son côté droit. Sur la section suivante, l’itinéraire devrait être enlevé de la route, derrière les fossés et les pentes de la route provinciale. Dans certains endroits, en raison de la forme défavorable ou du développement de la zone, le sentier est prévu d’approcher la chaussée de la route provinciale à une distance minimale de 0,5 m du bord de la chaussée. L’extrémité du tronçon est conçue à environ 9 + 680 km de la route provinciale, à Osiek, avec un lien avec le trottoir existant.Dans les zones piétonnes, il y aura des plaques «FOCUS» pour les personnes handicapées qui empruntent le passage à niveau. Il est envisagé de démolir partiellement la surface de la route dans les endroits reliés à la piste cyclable prévue pour le système routier existant.Paramètres de base de la nouvelle largeur de la piste cyclable à pied: 2,5 m-longueur de marche et de piste cyclable: 6 630 mL’investissement couvrira:- la construction d’une piste piétonne-vélo-reconstruction des issues- la construction et la reconstruction de ponceaux- la construction d’un mur de soutènement- la construction et la reconstruction d’éléments de drainage — démolition d’éléments existants d’aménagement du territoire, travaux contradictoires de construction- l’abattage des arbres et des arbustes- régulation et protection des éléments existants du réseau d’armement terrestre — installation de panneaux et dispositifs de sécurité routière — construction d’éclairage routier. (French)
    4 December 2021
    0 references

    Identifiers

    RPKP.03.04.00-04-0004/20
    0 references