(‎Created claim: summary (P836): L’investissement consiste en l’achat et l’installation de 3 centrales photovoltaïques d’une capacité totale de 107,86 kW. Il sera mis en œuvre dans trois endroits différents. Et l’emplacement est situé à Biskupiec ul. Ludowa 36, parcelles no 86/2, 90/7, 90/8 d’une capacité de 39,75 kW, l’installation prendra jusqu’à 250 m² de surface de toit, emplacement II à Biskupiec ul. L’armée nationale 11, terrain no 219/3, d’une puissance de 39,75 kW, l’in...)
(‎Removed claim: contained in NUTS (P1845): Olsztyński (Q2577186), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Olsztyński / rank
Normal rank
 

Revision as of 21:47, 3 December 2021

Project Q131856 in Poland
Language Label Description Also known as
English
Construction of 3 photovoltaic micro-installations by Leon Wierzchnicki Manufacturing-Handlowo-Service Company “WIELEMIX”.
Project Q131856 in Poland

    Statements

    0 references
    515,705.57 zloty
    0 references
    123,769.34 Euro
    13 January 2020
    0 references
    606,712.44 zloty
    0 references
    145,610.99 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2016
    0 references
    30 April 2017
    0 references
    LEON WIERZCHNICKI PRZEDSIĘBIORSTWO PRODUKCYJNO-HANDLOWO-USŁUGOWE " WIELEMIX".
    0 references
    0 references

    53°52'7.7"N, 20°57'18.7"E
    0 references

    53°59'47.4"N, 20°59'44.2"E
    0 references
    Inwestycja polega na zakupie i montażu 3 elektrowni fotowoltaicznych o łącznej mocy 107,86 kW. Będzie ona realizowana w trzech różnych lokalizacjach. I lokalizacja mieści się w Biskupcu ul. Ludowa 36, działki nr 86/2, 90/7, 90/8 o mocy 39,75 kW, instalacja zajmie do 250 m2 powierzchni dachu, lokalizacja II w Biskupcu ul. Armii Krajowej 11, działka nr 219/3, o mocy 39,75 kW,instalacja zajmie do 250 m2 powierzchni dachu, lokalizacja III w Bęsi 35, działka nr 217 o mocy 28,36 kW,instalacja zajmie do 175 m2 powierzchni dachu. Projekt wpisuje się w typ projektu wymieniony w SzOOP dla działania 4.1 - instalacji wykorzystujących energię słońca - do 2 MWe/MWth.Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła potrzebom własnym przedsiębiorstwa i będzie podłączona do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii (Dz.U. 2015) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U.1997) będzie ona dokonywana na podstawie zgłoszenia bez konieczności posiadania przez bene?cjenta ważnych technicznych warunków przyłączenia wszystkich ujętych w projekcie źródeł wytwarzania energii do sieci elektroenergetycznej. Wnioskodawca posiada obecnie przyłącze gdzie moc umowna wynosi 40 kW, 40 kW oraz 35 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Inwestycja polega na montażu: lokalizacja I-150 szt paneli polikrystalicznych, lokalizacja II-150 szt paneli polikrystalicznych, lokalizacja III- 107 szt paneli polikrystalicznych, połączonych w samodzielne układy wraz z 12-stoma falownikami i z niezbędnym okablowaniem i osprzętem. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą energię wyprodukowaną przez system fotowoltaiczny. Wyprodukowana energia elektryczna będzie wykorzystywana bezpośrednio na potrzeby własne a ewentualna nadwyżka będzie wprowadzana do sieci. (Polish)
    0 references
    The investment consists of the purchase and assembly of 3 photovoltaic power plants with a total capacity of 107.86 kW. It will be implemented in three different locations. And the location is located in Bishop’s Street. Ludowa 36, plots no. 86/2, 90/7, 90/8 with a capacity of 39.75 kW, the installation will take up to 250 m² of roof surface, location II in Biskupec ul. The National Army 11, plot No 219/3, with a power of 39.75 kW, will take up to 250 m² of roof surface, location III in Bęsi 35, plot No 217 with a capacity of 28.36 kW, installation will take up to 175 m² of roof surface. The project fits into the type of project mentioned in the SzOOP for action 4.1 – solar energy installations – up to 2 MWe/MWth.The installation according to the possibility described in the SzOOP will serve the company’s own needs and will be connected to the grid, however, due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (OJ 2015) and Art. 7 paragraph. 8d with a stamp 4-9 of the Act – Energy Law (Journal of Laws 1997) will be made on the basis of the notification without the need for the beneficiary to have important technical conditions for connecting all energy generation sources included in the project to the power grid. The applicant now has a connection with a contractual capacity of 40 kW, 40 kW and 35 kW. The project meets all the shore conditions specified in the Shoop. The investment consists of the assembly of: location of I-150 polycrystalline panels, location II-150 pcs of polycrystalline panels, location III-107 pcs of polycrystalline panels, connected into independent circuits together with 12 hundred inverters and necessary wiring and fittings. The power plant will be connected to the grid, but there will be no need to install batteries and charge regulators, as the network is able to absorb all the energy produced by the photovoltaic system. The electricity produced will be used directly for own use and any surplus will be introduced into the grid. (English)
    21 October 2020
    0 references
    L’investissement consiste en l’achat et l’installation de 3 centrales photovoltaïques d’une capacité totale de 107,86 kW. Il sera mis en œuvre dans trois endroits différents. Et l’emplacement est situé à Biskupiec ul. Ludowa 36, parcelles no 86/2, 90/7, 90/8 d’une capacité de 39,75 kW, l’installation prendra jusqu’à 250 m² de surface de toit, emplacement II à Biskupiec ul. L’armée nationale 11, terrain no 219/3, d’une puissance de 39,75 kW, l’installation occupera jusqu’à 250 m² de toiture, emplacement III à Bęsi 35, terrain no 217 d’une puissance de 28,36 kW, l’installation prendra jusqu’à 175 m² de surface de toit. Conformément à la possibilité décrite dans le SzOOP, l’installation répondra aux besoins propres de l’entreprise et sera raccordée au réseau en raison de la capacité de l’installation (jusqu’à 40 kW) conformément à l’article 5 de la loi sur les sources d’énergie renouvelables (Journal officiel 2015) et à l’article 7, paragraphe 1. 8d avec un cachet 4-9 de la loi sur l’énergie (Journal des lois 1997) sera faite sur la base d’une notification sans qu’il soit nécessaire que le bénéficiaire dispose de conditions techniques valables pour connecter toutes les sources de production d’énergie incluses dans le projet au réseau électrique. La requérante dispose actuellement d’une puissance contractuelle de 40 kW, 40 kW et 35 kW. Le projet remplit toutes les conditions limites énoncées dans le SzOOP. L’investissement consiste à rassembler: emplacement I-150 pcs de panneaux polycristallins, emplacement II-150 pcs de panneaux polycristallins, emplacement III- 107 pcs de panneaux polycristallins, reliés dans des systèmes autonomes avec 12 onduleurs et avec le câblage et les accessoires nécessaires. La centrale électrique sera raccordée au réseau, mais il n’y aura pas besoin d’installer des batteries et des régulateurs de charge, car le réseau est capable d’absorber toute l’énergie produite par le système photovoltaïque. L’électricité produite sera utilisée directement pour son propre usage et tout excédent sera injecté dans le réseau. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0241/16