Thermal modernisation of public utility buildings of the Wyszkowski County-Stage II (Q109073): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Le projet «Termomodernisation des bâtiments publics du district de Wyszkowski — Phase II» se compose de 5 tâches: 1) Tâche 1 — Construction du centre de formation professionnelle et continue «Kopernik» à Wyszków, 2) tâche 2 — Construction du complexe scolaire no 1 à Wyszków, 3) tâche 3 — Bâtiment principal du DPS Brańszczyk, 4) tâche 4 — Bâtiment «Hostel» dans la zone de DPS Brańszczyk, 5) Tâche 5 — Construction de l’internat à DPS Brańszczyk. L...)
(‎Removed claim: contained in NUTS (P1845): Ostrołęcki (Q2577175), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Ostrołęcki / rank
Normal rank
 

Revision as of 17:37, 3 December 2021

Project Q109073 in Poland
Language Label Description Also known as
English
Thermal modernisation of public utility buildings of the Wyszkowski County-Stage II
Project Q109073 in Poland

    Statements

    0 references
    4,059,871.02 zloty
    0 references
    974,369.04 Euro
    13 January 2020
    0 references
    5,074,838.78 zloty
    0 references
    1,217,961.31 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 May 2015
    0 references
    5 October 2018
    0 references
    POWIAT WYSZKOWSKI
    0 references

    52°37'41.5"N, 21°35'5.6"E
    0 references

    52°35'34.1"N, 21°27'30.6"E
    0 references
    Planowane przedsięwzięcie „Termomodernizacja budynków użyteczności publicznej Powiatu Wyszkowskiego – etap II” składa się z 5 zadań: 1) Zadanie 1 – Budynek Centrum Edukacji Zawodowej i Ustawicznej „Kopernik” w Wyszkowie, 2) Zadanie 2 – Budynek Zespołu Szkół Nr 1 w Wyszkowie, 3) Zadanie 3 – Budynek Główny DPS Brańszczyk, 4) Zadanie 4 – Budynek „Hostel” na terenie DPS Brańszczyk, 5) Zadanie 5 – Budynek Internatu na terenie DPS Brańszczyk. Zadanie Nr 3 dodatkowo obejmuje również montaż instalacji solarnej w Budynku Głównym w Domu Pomocy Społecznej w Brańszczyku. Wszystkie prace realizowane w ramach projektu wynikają bezpośrednio z opracowanych audytów energetycznych. Celem strategicznym projektu jest zmniejszenie zanieczyszczeń środowiska oraz uzyskanie efektu ekologicznego poprzez redukcję zanieczyszczeń, między innymi takich substancji jak SO2, NOx, pyłu, CO, CO2, BaP oraz sadzy w granicach 60%. Bezpośrednim beneficjentem/zamawiającym projektu będzie Powiat Wyszkowski. Pośrednimi beneficjentami projektu będą: mieszkańcy subregionu ostrołęckiego, w tym Powiatu Wyszkowskiego, obecni i przyszli przedsiębiorcy, turyści i inni użytkownicy budynków. Projekt Powiatu Wyszkowskiego „Termomodernizacja budynków użyteczności publicznej Powiatu Wyszkowskiego – etap II” ujęty jest w Planie Inwestycyjnym dla Miasta Ostrołęki i Subregionu Ostrołęckiego przyjętym uchwałą Zarządu Województwa Mazowieckiego Nr 311/222/17 z dnia 27 lutego 2017 r. (II Projekt wiodący). Wiązka inwestycyjna stanowiąca II Projekt w ramach Planu Inwestycyjnego dla miasta Ostrołęki i subregionu ostrołęckiego, nosi nazwę: Poprawa jakości życia mieszkańców obszaru funkcjonalnego subregionu ostrołęckiego poprzez zwiększenie dostępności i jakości świadczonych usług zdrowotnych, profilaktyki zdrowotnej i ograniczenie niskiej emisji. (Polish)
    0 references
    The planned project “Termomodernisation of public utility buildings of the Wyszkowski County – Stage II” consists of 5 tasks: 1) Task 1 – Building of the Centre for Vocational and Continuous Education “Kopernik” in Wyszków, 2) Task 2 – Building of School Complex No.1 in Wyszków, 3) Task 3 – Main Building DPS Brańszczyk, 4) Task 4 – Building “Hostel” at DPS Brańszczyk, 5) Task 5 – Internatation building in the area of DPS Brańszczyk. Task No. 3 also includes the installation of solar installation in the Main Building in the Social Assistance Centre in Brańszczyk. All the work carried out within the project results directly from the developed energy audits. The strategic objective of the project is to reduce environmental pollution and achieve an ecological effect by reducing pollutants such as SO2, NOx, dust, CO, CO2, BaP and soot within 60 %. The direct beneficiary/contractor of the project will be the Wyszkowski County. Indirect beneficiaries of the project will be: residents of the Ostręłka subregion, including Wyszkowski County, present and future entrepreneurs, tourists and other users of buildings. Wyszkowski County project “Termomodernisation of public utility buildings of the Wyszkowski County – Stage II” is included in the Investment Plan for the City of Ostrołęki and the Ostrołęcki Subregion adopted by resolution of the Management Board of Mazowsze Voivodship No 311/222/17 of 27 February 2017 (II Lead Project). The investment bundle constituting the II Project under the Investment Plan for the city of Ostrołęki and the Ostrołęki subregion is called: Improve the quality of life of residents of the functional area of the Ostręłęskie subregion by increasing the availability and quality of health services provided, prevention and reduction of low emissions. (English)
    20 October 2020
    0 references
    Le projet «Termomodernisation des bâtiments publics du district de Wyszkowski — Phase II» se compose de 5 tâches: 1) Tâche 1 — Construction du centre de formation professionnelle et continue «Kopernik» à Wyszków, 2) tâche 2 — Construction du complexe scolaire no 1 à Wyszków, 3) tâche 3 — Bâtiment principal du DPS Brańszczyk, 4) tâche 4 — Bâtiment «Hostel» dans la zone de DPS Brańszczyk, 5) Tâche 5 — Construction de l’internat à DPS Brańszczyk. L’activité no 3 comprend également l’installation d’une installation solaire dans le bâtiment principal de la maison de protection sociale de Brańszczyk. Tous les travaux réalisés dans le cadre du projet résultent directement des audits énergétiques réalisés. L’objectif stratégique du projet est de réduire la pollution de l’environnement et d’obtenir un effet écologique en réduisant à 60 % les polluants tels que le SO2, les NOx, les poussières, le CO, le CO2, le BaP et la suie. Le bénéficiaire/contractant direct du projet sera Powiat Wyszkowski. Les bénéficiaires indirects du projet seront: résidents de la sous-région d’Ostroleka, y compris le district de Wyszkowski, entrepreneurs actuels et futurs, touristes et autres utilisateurs de bâtiments. Le projet du district de Wyszkowski «Termomodernisation des services publics du district de Wyszkowski — phase II» est inclus dans le plan d’investissement pour la ville d’Ostrołęki et la sous-région d’Ostrołęki, adopté par la résolution no 311/222/17 du conseil d’administration de la voïvodie de Mazowieckie du 27 février 2017 (projet pilote II). Le groupe d’investissements, qui est le deuxième projet dans le cadre du plan d’investissement pour la ville d’Ostrołęki et la sous-région d’Ostroleki, s’appelle: Améliorer la qualité de vie des habitants de la zone fonctionnelle de la sous-région d’Ostroleka en augmentant la disponibilité et la qualité des services de santé fournis, en prévenant la santé et en réduisant les émissions faibles. (French)
    1 December 2021
    0 references

    Identifiers

    RPMA.04.02.00-14-8025/17
    0 references