Investment in infrastructure for the production of renewable energy (RES) by Milanowe Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. with the participation of prosumers. (Q108893): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: contained in NUTS (P1845): Warszawski zachodni (Q2577125), Removing duplicate contained in NUTS)
(‎Removed claim: contained in NUTS (P1845): Warszawski zachodni (Q2577125), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Warszawski zachodni / rank
Normal rank
 

Revision as of 17:29, 3 December 2021

Project Q108893 in Poland
Language Label Description Also known as
English
Investment in infrastructure for the production of renewable energy (RES) by Milanowe Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. with the participation of prosumers.
Project Q108893 in Poland

    Statements

    0 references
    965,009.56 zloty
    0 references
    231,602.29 Euro
    13 January 2020
    0 references
    1,206,261.96 zloty
    0 references
    289,502.87 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 September 2016
    0 references
    30 June 2020
    0 references
    MILANOWSKIE PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SP. Z O.O.
    0 references
    0 references

    52°6'23.8"N, 20°37'52.7"E
    0 references

    52°7'25.3"N, 20°40'9.5"E
    0 references

    52°8'33.4"N, 20°43'1.6"E
    0 references

    52°11'8.2"N, 20°50'52.1"E
    0 references

    52°17'49.6"N, 20°48'44.6"E
    0 references

    51°58'26.4"N, 20°30'45.7"E
    0 references
    Projekt obejmuje przejście na gospodarkę niskoemisyjną z wykorzystaniem odnawialnych źródeł energii. Zakłada się zakup infrastruktury do produkcji energii ze źródeł odnawialnych, zlecając wykonanie w trybie zaprojektuj i wybuduj systemów modułów fotowoltaicznych, wytwarzających energię elektryczną zainstalowanych na terenach nieruchomości będących własnością wnioskodawcy (Stacja Uzdatniania Wody ul. Kościuszki) oraz własnością prosumentów (prywatne posesje). Projekt obejmuje 22 instalacje fotowoltaiczne oraz 2 pompy ciepła. Instalacje fotowoltaiczne oparte będą o Panele (poli krystaliczne) z wbudowanymi optymaizerami. Projekt przewiduje zastosowanie 760 sztuk paneli o parametrach nie mniejszych: Moc 265 W, Ogniwa Polikrystaliczne, wymiar ogniwa 156 x 156 mm , Ilość ogniw 60, Prąd zwarciowy 9,5, napięcie jałowe 33,4, prąd maksymalny 6,92, napięcie 28,5, klasa A, gniazdko IP 65. Budowa instalacji prosumenckich oraz na nieruchomościach należ. do osób fizycznych.Instalacje zlokalizowane będą w woj. mazowieckim, a więc obszarze objętym zakresem projektu. Drugim źródłem OZE będą pompy ciepła. Rozwiązania techniczne systemów grzewczych są analogiczne dla dwóch obiektów. Zakładają one, że źródłem energii cieplnej dla systemów będą pompy cieplne typu woda/woda, z "dolnym źródłem" wodą wodociągową. Wewnętrzne instalacje grzewcze (instalacje centr. ogrzew. i przygotowania ciepłej wody użytkowej) będą typu wodnego, nisko-temperaturowego-instalacja c.o.-55/40stopni C, instalacja podgrzewu c.w.u. 60/45 stopni C. Ww. rozwiązania zapewniają pozyskiwanie energii cieplnej z odnawialn. źródła - energia zmagazyn. w gruncie w postaci wody z ujęcia wodociągowego.Za pośrednictwem pompy cieplnej uzyskiwane są parametry wody grzejnej dla instalacji grzewczych (c.o. lub c.w.u.) w zależności od aktualnych potrzeb. Całość procesu wytwarzania i regulacji sterowana jest automatyczna - regulacja pogodowa i stałotemperaturowa, programowalna. Opis szcz. w studium wykonalności. (Polish)
    0 references
    The project involves the transition to a low-carbon economy using renewable energy sources. It is assumed to purchase infrastructure for the production of energy from renewable sources, commissioning the design and construction of systems of photovoltaic modules that produce electricity installed in the premises owned by the applicant (Water Treatment Station ul. Kosciuszko) and property of prosumers (private property). The project includes 22 photovoltaic installations and 2 heat pumps. Photovoltaic installations will be based on panels (crystalline polys) with built-in optimisers. The project envisages the use of 760 panels with no less parameters: Power 265 W, Polycrystalline cells, cell size 156 x 156 mm, Number of cells 60, short circuit current 9,5, idle voltage 33.4, maximum current 6,92, voltage 28.5, class A, IP 65 socket. The construction of prosumer installations and on real estate belongs to natural persons.The installations will be located in the Mazowieckie Voivodeship, i.e. the area covered by the project. The second source of RES will be heat pumps. The technical solutions of heating systems are analogous to two objects. They assume that the heat source for the systems will be water/water heat pumps with “low source” water. Internal heating systems (installations of heating centers and hot water preparation) will be of a water type, low-temperature-installation of central heating 55/40 degrees C, installation of heating hot-c.u. 60/45 degrees C. The above-mentioned solutions ensure the obtaining of thermal energy from the current source – energy storage in the ground in the form of water from water supply. The whole process of production and regulation is controlled automatically – weather and constant temperature control, programmable. Description of the feasibility study. (English)
    17 October 2020
    0 references
    Le projet prévoit la transition vers une économie à faible intensité de carbone utilisant des sources d’énergie renouvelables. Il est supposé acheter des infrastructures pour la production d’énergie à partir de sources renouvelables, en mettant en service l’exécution dans le mode de conception et de construction de modules photovoltaïques, en produisant de l’électricité installée sur les propriétés appartenant à la requérante (Wody Street Treatment Station. Kosciuszko) et la propriété des prosommateurs (propriétés privées). Le projet comprend 22 installations photovoltaïques et 2 pompes à chaleur. Les installations photovoltaïques seront basées sur des panneaux (polypolycristallin) avec des optimisations intégrées. Le projet prévoit l’utilisation de 760 panneaux avec des paramètres non plus petits: Puissance 265 W, Cellules polycristallines, dimension de la cellule 156 x 156 mm, Nombre de cellules 60, Courant court-circuit 9.5, tension inactif 33.4, courant max 6.92, tension 28,5, classe A, prise IP 65. La construction d’installations de prosommateurs et de biens immobiliers appartient à des personnes physiques. Les installations seront situées dans la voïvodie de Mazowieckie, c’est-à-dire dans la zone couverte par le projet. La deuxième source d’énergie renouvelable sera les pompes à chaleur. Les solutions techniques des systèmes de chauffage sont analogues pour deux objets. Ils supposent que la source d’énergie thermique pour les systèmes sera des pompes à chaleur eau/eau, avec une «faible source» d’eau du robinet. Les installations de chauffage interne (installations du centre de chauffage et préparation de l’eau chaude) seront de type eau, à basse température-installation de température 55/40degrés C, installation de chauffage de l’eau chaude 60/45 degrés C. Les solutions ci-dessus assurent l’extraction de l’énergie thermique à partir d’une source renouvelable — l’énergie stockée dans le sol sous forme d’eau provenant de l’eau du robinet.Pendant la pompe à chaleur, les paramètres de l’eau de chauffage sont obtenus pour les installations de chauffage (c.o. ou eau chaude) en fonction des besoins actuels. L’ensemble du processus de fabrication et d’ajustement est contrôlé par un contrôle automatique des intempéries et de la température constante, programmable. Description dans l’étude de faisabilité. (French)
    1 December 2021
    0 references

    Identifiers

    RPMA.04.01.00-14-6937/16
    0 references