Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them on the territory of Kirkovo Municipality (Q3885463): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Reconstruction et réhabilitation du réseau de rue, trottoirs, installations et accessoires pour eux sur le territoire de la municipalité de Kirkovo
Property / summary
 
La proposition de projet de la municipalité de Kirkovo prévoit la reconstruction et la remise en état du réseau de rues dans les villages de Chakalarovo et du village de Chorbadzhiyski, y compris la reconstruction et la remise en état des trottoirs existants. Le projet comprend deux rues — rue 2 dans le village de Chakalarovo, d’une longueur de 950 m — de l’OT 30 à O.T. 161 et rue 1 dans le village de Chorbadzhiyski, 668 m de long. Le projet vise à mettre fin au processus de démolition des chaussées et des chaussées et à assurer leur capacité de roulement, l’équilibre et le drainage des eaux de surface. (French)
Property / summary: La proposition de projet de la municipalité de Kirkovo prévoit la reconstruction et la remise en état du réseau de rues dans les villages de Chakalarovo et du village de Chorbadzhiyski, y compris la reconstruction et la remise en état des trottoirs existants. Le projet comprend deux rues — rue 2 dans le village de Chakalarovo, d’une longueur de 950 m — de l’OT 30 à O.T. 161 et rue 1 dans le village de Chorbadzhiyski, 668 m de long. Le projet vise à mettre fin au processus de démolition des chaussées et des chaussées et à assurer leur capacité de roulement, l’équilibre et le drainage des eaux de surface. (French) / rank
 
Normal rank
Property / summary: La proposition de projet de la municipalité de Kirkovo prévoit la reconstruction et la remise en état du réseau de rues dans les villages de Chakalarovo et du village de Chorbadzhiyski, y compris la reconstruction et la remise en état des trottoirs existants. Le projet comprend deux rues — rue 2 dans le village de Chakalarovo, d’une longueur de 950 m — de l’OT 30 à O.T. 161 et rue 1 dans le village de Chorbadzhiyski, 668 m de long. Le projet vise à mettre fin au processus de démolition des chaussées et des chaussées et à assurer leur capacité de roulement, l’équilibre et le drainage des eaux de surface. (French) / qualifier
 
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:13, 3 December 2021

Project Q3885463 in Bulgaria
Language Label Description Also known as
English
Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them on the territory of Kirkovo Municipality
Project Q3885463 in Bulgaria

    Statements

    0 references
    984,367.06 Bulgarian lev
    0 references
    502,027.2 Euro
    1 December 2021
    0 references
    1,158,078.89 Bulgarian lev
    0 references
    590,620.23 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    19 May 2021
    0 references
    15 September 2023
    0 references
    Q3885449 (Deleted Item)
    0 references
    Проектното предложение на община Кирково предвижда реконструкция и рехабилитация на уличната мрежа в с. Чакаларово и с. Чорбаджийско, включително реконструкция и рехабилитация на съществуващи тротоари. В проекта са включени две улици - Улица 2 в с. Чакаларово, с дължина 950 м - от О.Т. 30 до О.Т. 161 и улица 1 в с. Чорбаджийско, с дължина 668 м. С реализацията на проекта се цели да се преустанови процеса на разрушаване на настилките и тротоарите и да се гарантира носимоспособността, равността и отводняването им от повърхностните води. (Bulgarian)
    0 references
    The project proposal of Kirkovo Municipality provides for reconstruction and rehabilitation of the street network in the villages of Chakalarovo and the village of Chorbadzhiyski, including reconstruction and rehabilitation of existing sidewalks. The project includes two streets — Street 2 in the village of Chakalarovo, with a length of 950 m — from O.T. 30 to O.T. 161 and Street 1 in the village of Chorbadzhiyski, 668 m long. The project aims to end the process of demolition of the pavements and pavements and to ensure their bearing capacity, equilibrium and drainage from surface waters. (English)
    2 December 2021
    0 references
    La proposition de projet de la municipalité de Kirkovo prévoit la reconstruction et la remise en état du réseau de rues dans les villages de Chakalarovo et du village de Chorbadzhiyski, y compris la reconstruction et la remise en état des trottoirs existants. Le projet comprend deux rues — rue 2 dans le village de Chakalarovo, d’une longueur de 950 m — de l’OT 30 à O.T. 161 et rue 1 dans le village de Chorbadzhiyski, 668 m de long. Le projet vise à mettre fin au processus de démolition des chaussées et des chaussées et à assurer leur capacité de roulement, l’équilibre et le drainage des eaux de surface. (French)
    3 December 2021
    0 references
    с.Чакаларовос.Чорбаджийско
    0 references

    Identifiers

    BG06RDNP001-7.001-0016
    0 references