“Closure and recultivation of municipal landfill for household waste on the territory of the municipality of Roman” (Q3886851): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en, and other parts: Adding en translations) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
43°8'53.63"N, 23°55'21.58"E
| |||||||||||
Property / coordinate location: 43°8'53.63"N, 23°55'21.58"E / rank | |||||||||||
Normal rank |
Revision as of 16:40, 3 December 2021
Project Q3886851 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | “Closure and recultivation of municipal landfill for household waste on the territory of the municipality of Roman” |
Project Q3886851 in Bulgaria |
Statements
550,008.95 Bulgarian lev
0 references
647,069.35 Bulgarian lev
0 references
0.85 percent
0 references
3 July 2020
0 references
3 February 2022
0 references
За изпълнение на целите по чл. 112, ал.2 от ЗУО, Община Роман предприема мерки за закриване и рекултивация на общинско депо за битови отпадъци на територията на общината, Местност “Вълчов Дол“, землище на с. Долна Бешовица. Рекултивацията на депото е проектирана съгласно всички изисквания за опазване на околната среда към момента. Депото ще бъде закрито и ще бъде извършена техническа и биологична рекултивация съгласно плана за привеждане в съответствие с нормативната уредба и Националната програма за управление на дейностите по отпадъците. С цел намаляване на площта се предвижда прибутване на отпадъците и оформяне на тяло на депото, подлежащо на рекултивация. Прибутването на масите става чрез движение на масите и напречните профили - типови и индивидуални, с цел минимизиране на строителните работи. Посредством тези дейности, площта на съществуващото депо, подлежащо на рекултивация е 13,934 дка. Осигурява се освободена от отпадъци площ, възлизаща на от 0,200 дка. Следва изпълнението на газоотвеждащите вертикални кладенци с баластрени ребра положени в най-горната част на уплътнените вече и оформени отпадъци. Покриващите пластове се изпълняват последователно, както се разстилат и уплътняват с булдозер, като се прибутват с движение от горе на долу и странично. Заключителните работи са озеленителните, укрепителните и направата на предпазните отводнителни канавки. Улавянето на повърхностните дъждовни води след рекултивацията на депото ще става чрез повърхностната канавка, проектирана частично около рекултивираното тяло на депото. Предвидена е и мониторингова система. След техническата рекултивация на депото се осъществява биологическа рекултивация, дейностите по която не са включени в настоящето проектно предложение. Биологичната рекултивация на депото ще бъде завършена след изпълнението на техническата рекултивация, с осигурени средства от общината, извън предоставените средства по процедурата, в срок от 5 години след окончателното плащане по проектното предложение. (Bulgarian)
0 references
In order to meet the objectives set out in Article 112(2) of the Waste Management Act, the Municipality of Roman shall take measures to close down and recultivate a municipal landfill for household waste on the territory of the municipality, Valchev Dol District, village of Dolna Beshovitsa. The reclamation of the landfill has been designed in accordance with all environmental protection requirements at the moment. The landfill will be closed and technical and biological recultivation will be carried out in accordance with the plan for compliance with the regulatory framework and the National Waste Management Programme. In order to reduce the surface area, it is envisaged to push the waste and shape the body of the landfill subject to recultivation. Pushing the tables is done by moving the tables and cross sections — type and individual, in order to minimise the construction work. Through these activities, the area of the existing landfill subject to recultivation is 13.934 ha. A waste-free area of 0.200 decares shall be provided. Next is the implementation of the gas conducting vertical wells with ballasted ribs laid in the top part of the already compacted waste. The covering layers shall be executed successively as spread and compacted with a bulldozer, pushing them in motion from the top to the bottom and laterally. The final works are the landscaping, strengthening and construction of the protective drainage ditches. The capture of the surface rainwater after the recultivation of the landfill will be done through the surface ditch designed partly around the recultivated body of the landfill. A monitoring system is also foreseen. After the technical reclamation of the landfill, biological recultivation is carried out, the activities of which are not included in this project proposal. The biological reclamation of the landfill will be completed after the implementation of the technical recultivation, with funds provided by the municipality, outside the funds provided under the procedure, within 5 years after the final payment under the project proposal. (English)
2 December 2021
0 references
Роман
0 references
Identifiers
BG16M1OP002-2.010-0019
0 references