Energy saving measures (Q3060532): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): Anlagenoptimierung MC-Pumpe und Fiberizer, Betr. Energiesparmaßnahmen, Pöls-Oberkurzheim, Removing bad summary) |
(Changed label, description and/or aliases in de-at, de, and other parts: Moving texts from de-at to de) |
||
label / de-at | label / de-at | ||
label / de | label / de | ||
Betr. Energiesparmaßnahmen | |||
Property / summary | |||
Anlagenoptimierung MC-Pumpe und Fiberizer, Betr. Energiesparmaßnahmen, Pöls-Oberkurzheim (German) | |||
Property / summary: Anlagenoptimierung MC-Pumpe und Fiberizer, Betr. Energiesparmaßnahmen, Pöls-Oberkurzheim (German) / rank | |||
Normal rank |
Revision as of 14:25, 3 December 2021
Project Q3060532 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy saving measures |
Project Q3060532 in Austria |
Statements
820,965.0 Euro
0 references
28 March 2018
0 references
30 June 2019
0 references
Zellstoff Pöls AG
0 references
62043
0 references
Plant optimisation MC pump and fiberiser, energy saving measures, Pöls-Oberkurzheim (English)
20 July 2021
0 references
Optimisation de l’installation Pompe MC et Fiberizer, Mesures d’économie d’énergie, Pöls-Oberkurzheim (French)
27 November 2021
0 references
Installatie optimalisatie MC pomp en fiberizer, energiebesparende maatregelen, Pöls-Oberkurzheim (Dutch)
29 November 2021
0 references
Anlagenoptimierung MC-Pumpe und Fiberizer, Betr. Energiesparmaßnahmen, Pöls-Oberkurzheim (German)
0 references
Pöls
0 references
Identifiers
AUST-248
0 references