URBAN FUNCTIONAL AREA ZDUŃSKA WILL – KARSZNICE – CONSTRUCTION OF A LINK WITH THE S8 EXPRESSWAY IN THE ZDUŃSKOWOLSKI DISTRICT AND ŁASKI DISTRICT. (Q101704): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): C’EST UN PROJ. IL S’AGIT D’UNE COMPOSANTE D’HYPOTHÈSES D’INVESTISSEMENT PLUS LARGES. BIEN SÛR AVEC LA CRÉATION ET LE DÉVELOPPEMENT DE MOF ZDUŃSKA — KARSZNICE, DANS LE CADRE DE LAQUELLE, À LA JONCTION DE 2 CORRIDORS PANEUROPÉENS (N-S) ET (IN-E) UN CENTRE DE LOGISTIQUE ET D’INVESTISSEMENT COMPÉTITIF DOIT ÊTRE MIS EN PLACE. LA TÊTE. L’OBJECTIF DU PROJET. LES LIAISONS ET L’ACCESSIBILITÉ DU RÉSEAU ROUTIER RÉGIONAL AVEC LE RÉSEAU ROUTIER NATIONAL, LE...)
(‎Removed claim: contained in NUTS (P1845): Sieradzki (Q2577171), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Sieradzki / rank
Normal rank
 

Revision as of 12:51, 3 December 2021

Project Q101704 in Poland
Language Label Description Also known as
English
URBAN FUNCTIONAL AREA ZDUŃSKA WILL – KARSZNICE – CONSTRUCTION OF A LINK WITH THE S8 EXPRESSWAY IN THE ZDUŃSKOWOLSKI DISTRICT AND ŁASKI DISTRICT.
Project Q101704 in Poland

    Statements

    0 references
    0 references
    0 references
    26,643,429.04 zloty
    0 references
    6,394,422.97 Euro
    13 January 2020
    0 references
    31,345,210.64 zloty
    0 references
    7,522,850.55 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2016
    0 references
    31 December 2019
    0 references
    POWIAT ZDUŃSKOWOLSKI
    0 references

    51°30'41.8"N, 19°1'38.6"E
    0 references

    51°35'41.6"N, 18°57'0.4"E
    0 references

    51°36'17.3"N, 18°54'57.2"E
    0 references
    PROJ. STANOWI SKŁADOWĄ SZERSZYCH ZAŁOŻEŃ INWESTYCYJNYCH. ZW. Z POWSTANIEM I ROZWOJEM MOF ZDUŃSKA WOLA – KARSZNICE W RAMACH KTÓREGO NA SKRZYŻOWANIU 2 KORYTARZY PANEUROPEJSKICH (N-S) I (W-E) MA POWSTAĆ KONKURENCYJNE CENTRUM LOGISTYCZNO – INWESTYCYJNE. GŁ. CELEM PROJ. JEST POPRAWA POWIĄZAŃ I DOSTĘPNOŚCI REGIONALNEJ SIECI DRÓG WŁ Z SIECIĄ DRÓG KRAJOWYCH, SIECIĄ TEN-T, LIKWIDACJA „WĄSKIEGO GARDŁA” W SIECI TRANSPORTOWEJ REGIONU ORAZ POPRAWA DOSTĘPNOŚCI KOMUNIKACYJNEJ MOF. REALIZACJA PROJ. PRZYCZYNI SIĘ DO WZMOCNIENIA SPÓJNOŚCI PRZESTRZENNEJ, GOSP. I SPOŁ. REGIONU, PODNIESIENIA ATRAKCYJNOŚCI TERENÓW WOKÓŁ WĘZŁA DROGI EKSPRESOWEJ S8, A CO ZA TYM IDZIE AKTYWIZACJI LOK RYNKU PRACY I PRZECIWDZIAŁANIA BEZROBOCIU. DA TO MOŻLIWOŚĆ UTWORZENIA NOWYCH TERENÓW INWESTYCYJNYCH. PRZEDSIĘWZIĘCIE POLEGA NA ZAPROJEKTOWANIU I WYBUDOWANIU NOWEJ DROGI POW. MIĘDZY WĘZŁEM DROGI EKSPRESOWEJ. S8 ZDUŃSKA WOLA KARSZNICE (ZDUŃSKA WOLA WCHÓD) A DROGĄ WOJEWÓDZKĄ. W KORYTARZU DROGI PLANUJE SIĘ UMIESZCZENIE: JEZDNI, ZIELENI IZOLACYJNEJ, ŚCIEŻKI ROWEROWEJ, CHODNIKA, ROWÓW, OŚWIETLENIA, KANAŁU TECHNOLOGICZNEGO, PASA INFRASTRUKTURALNEGO, PRZEZNACZONEGO NA PRZYSZŁĄ BUDOWĘ INFRASTRUKTURY TECHNICZNEJ. BĘDZIE TO DROGA KLASY Z W PRZEKROJU 1X2, O PRĘD. PROJ. 50 KM/H W TER. ZAB. I 70 KM/H W TER. NIEZABUD., ORAZ KAT. KR4. DŁUG. ODCINKA 4,3 KM W TYM 1,655 KM NA TER. POW. ŁASKIEGO A 2,645 KM NA TER. POW. ZDUŃSKOWOLSKIEGO. W RAMACH PROJ. REALIZOWANE BĘDĄ TAKŻE ZAD. ZW. Z PROMOCJĄ PROJ., ZARZĄDZANIEM. PROJ. I NADZOREM INWESTORSKIM GRUPĄ. DOCELOWĄ STANOWIĄ MIESZK. POW. ŁASKIEGO I ZDUN. WOL. A TAKŻE OSOBY I PODMIOTY GOSP., SPOZA TERENU WW. POWIATÓW, KTÓRE BĘDĄ KORZYSTAŁY Z WYBUD. DROGI, Z WW. TER. INW. ORAZ PORTU MULT. PROJ. REAL. JEST W PART. W SKŁAD KTÓREGO WCHODZĄ: POW. ZDUŃSKOWOLSKI I ŁASKI, GM. ZDUŃSKA WOLA, SĘDZIEJOWICE I MIASTO ZDUŃSKA WOLA. PROJ WPIS. JEST DO KONTR. TERYT WŁ JAKO JEDNA Z INWEST WCHODZĄCYCH W ZAKRES BUDOWY PORTU MULTIMEDIALNEGO ZDUŃSKA - WOLA KARSZNICE (…) I STANOWI REALIZACJĘ JEGO ZAŁOŻEŃ. (Polish)
    0 references
    IT’S A PROJECT. IT IS A COMPONENT OF BROADER INVESTMENT ASSUMPTIONS. IT’S CALLED. WITH THE ESTABLISHMENT AND DEVELOPMENT OF MOF ZDUŃSKA WILL – KARSZNICE, WITHIN WHICH AT THE INTERSECTION OF 2 PAN-EUROPEAN CORRIDORS (N-S) AND (IN-E) A COMPETITIVE LOGISTICS AND INVESTMENT CENTRE IS TO BE CREATED. GO FOR IT. THE AIM OF THE PROJECT. THERE IS AN IMPROVEMENT IN THE LINKS AND ACCESSIBILITY OF THE REGIONAL ROAD NETWORK WITH THE NATIONAL ROAD NETWORK, THE T-T NETWORK, THE ELIMINATION OF BOTTLENECKS IN THE REGION’S TRANSPORT NETWORK AND THE IMPROVEMENT OF THE IMF’S TRANSPORT ACCESSIBILITY. IMPLEMENTATION OF THE PROJECT. IT WILL CONTRIBUTE TO STRENGTHENING SPATIAL COHESION, THE GOSP. AND AT THE SAME TIME. THE REGION, INCREASING THE ATTRACTIVENESS OF THE AREAS AROUND THE JUNCTION OF THE S8 EXPRESSWAY AND THUS ACTIVATING THE PLACE OF THE LABOUR MARKET AND COMBATING UNEMPLOYMENT. THIS WILL ALLOW THE CREATION OF NEW INVESTMENT AREAS. THE PROJECT CONSISTS OF DESIGNING AND CONSTRUCTING A NEW ROAD. BETWEEN THE JUNCTION OF THE EXPRESSWAY. S8 ZDUŃSKA W WILL KARSZNICE (ZDUŃSKA WILL COME) AND THE VOIVODESHIP ROAD. THE FOLLOWING ARE PLANNED TO BE PLACED IN THE CORRIDOR OF THE ROAD: ROADWAYS, INSULATING GREENERY, BICYCLE PATH, PAVEMENT, DITCHES, LIGHTING, TECHNOLOGICAL CANAL, INFRASTRUCTURE BELT, INTENDED FOR THE FUTURE CONSTRUCTION OF TECHNICAL INFRASTRUCTURE. THIS WILL BE A CLASS ROAD WITH A CROSS SECTION OF 1X2, BY SPEED. IT’S A PROJECT. 50 KM/H IN THE TER. IT’S A TOB. AND 70 MILES AN H IN THE TER. UNAWARE., AND KAT. COR4. IT’S A DEBT. A SECTION OF 4.3 KM INCLUDING 1.655 KM PER TER. I'M SORRY. ŁASKI AND 2.645 KM TO THE TER. I'M SORRY. IT’S ZDUŃSKOWOLSKI. AS PART OF THE PROJECT. THE ASS WILL ALSO BE IMPLEMENTED. IT’S CALLED. WITH PROJECT PROMOTION, MANAGEMENT. IT’S A PROJECT. AND THE INVESTOR’S SUPERVISION GROUP. THE TARGET IS THE BELLOW. I'M SORRY. GRACE AND ZDUN. LET’S GO. GO AHEAD. AS WELL AS PERSONS AND ENTITIES OF THE HOUSEKEEPER, FROM OUTSIDE THE PREMISES. DISTRICTS THAT WILL BENEFIT FROM WYBUD. DEAR, FROM THE WWW. IT’S A TER. IT’S AN INW. AND THE PORT OF MULT. IT’S A PROJECT. IT’S A REAL ONE. HE’S IN PART. COMPOSED OF: I'M SORRY. ZDUŃSKOWOLSKI AND GRACES, GM. ZDUŃSKA WILL, SĘDZIEJOWICE AND THE CITY OF ZDUŃSKA WILL. LOOK AT THE ENTRY. HE’S ON THE COUNTER. TERYT OWNED AS ONE OF THE INVESTMENTS INVOLVED IN THE CONSTRUCTION OF THE MULTIMEDIA PORT ZDUŃSKA – THE WILL OF KARSZNICE (...) AND IS THE REALISATION OF ITS OBJECTIVES. (English)
    17 October 2020
    0 references
    C’EST UN PROJ. IL S’AGIT D’UNE COMPOSANTE D’HYPOTHÈSES D’INVESTISSEMENT PLUS LARGES. BIEN SÛR AVEC LA CRÉATION ET LE DÉVELOPPEMENT DE MOF ZDUŃSKA — KARSZNICE, DANS LE CADRE DE LAQUELLE, À LA JONCTION DE 2 CORRIDORS PANEUROPÉENS (N-S) ET (IN-E) UN CENTRE DE LOGISTIQUE ET D’INVESTISSEMENT COMPÉTITIF DOIT ÊTRE MIS EN PLACE. LA TÊTE. L’OBJECTIF DU PROJET. LES LIAISONS ET L’ACCESSIBILITÉ DU RÉSEAU ROUTIER RÉGIONAL AVEC LE RÉSEAU ROUTIER NATIONAL, LE RÉSEAU DE DIX T, L’ÉLIMINATION DU GOULOT D’ÉTRANGLEMENT DANS LE RÉSEAU DE TRANSPORT DE LA RÉGION ET L’AMÉLIORATION DE L’ACCESSIBILITÉ DU MINISTÈRE DES FINANCES SONT AMÉLIORÉES. RÉALISATION DU PROJET. IL CONTRIBUERA AU RENFORCEMENT DE LA COHÉSION SPATIALE, GOSP. ET NOUS L’AVONS. LA RÉGION, AUGMENTANT L’ATTRACTIVITÉ DES ZONES AUTOUR DU NŒUD DE L’AUTOROUTE S8, ACTIVANT AINSI LA PLACE DU MARCHÉ DU TRAVAIL ET LUTTANT CONTRE LE CHÔMAGE. CELA DONNERA L’OCCASION DE CRÉER DE NOUVEAUX SITES D’INVESTISSEMENT. LE PROJET CONSISTE À CONCEVOIR ET À CONSTRUIRE UNE NOUVELLE ZONE ROUTIÈRE. ENTRE LE NŒUD DE L’AUTOROUTE. S8 ZDUŃSKA’S KARSZNICE (ZDUŃSKA VERS L’EST) ET LA ROUTE DE LA VOÏVODIE. IL EST PRÉVU DE PLACER DANS LE COULOIR DE LA ROUTE LES ÉLÉMENTS SUIVANTS: ROUTE, VERDURE ISOLANTE, PISTE CYCLABLE, TROTTOIR, FOSSÉS, ÉCLAIRAGE, CANAL TECHNOLOGIQUE, VOIE D’INFRASTRUCTURE, DESTINÉ À LA CONSTRUCTION FUTURE D’INFRASTRUCTURES TECHNIQUES. CE SERA UNE ROUTE DE CLASSE À PARTIR DE 1X2 À VITESSE. C’EST UN PROJ. 50 KM/H EN TER. ZAB. ET 70 KM/H EN TER. UNABUD, ET CHAT. KR4. DETTE. SECTION 4.3 KM DONT 1655 KM PAR TER. POI. ŁASKI ET 2645 KM PAR TER. POI. C’EST UN DU’SKOWOLSKI. DANS LE CADRE DU PROJET. ILS SERONT ÉGALEMENT MIS EN ŒUVRE. BIEN SÛR AVEC LA PROMOTION DU PROJET, LA GESTION. C’EST UN PROJ. ET LA SUPERVISION DES INVESTISSEURS DU GROUPE. LA CIBLE EST UN SOUFFLET. POI. ŁASKI ET ZDUN. C’EST ÇA. AINSI QUE LES PERSONNES ET ENTITÉS SITUÉES À L’EXTÉRIEUR DE LA ZONE. DISTRICTS QUI BÉNÉFICIERONT DE WYBUD. ROUTES, À PARTIR DE CE QUI PRÉCÈDE TER. INV. ET LE PORT DE MULT. C’EST UN PROJ. C’EST VRAI. IL EST EN PARTIE. COMPOSÉ DE: POI. ZU’SKOWOLSKI ET GRACES, GM. ZDUŃSKA SERA, JUGE ET VILLE ZDUŃSKA LE FERA. PRONTO L’ENTRÉE. C’EST UN COMPTOIR. TERYT EST L’UN DES INVESTISSEURS DANS LE CADRE DE LA CONSTRUCTION DU PORT MULTIMÉDIA ZDUŃSKA — LA VOLONTÉ DE KARSZNICE (...) ET EST LA RÉALISATION DE SES OBJECTIFS. (French)
    1 December 2021
    0 references

    Identifiers

    RPLD.03.02.02-10-0001/15
    0 references