Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage OOD — Vratsa (Q3848883): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Construction d’infrastructures WSS dans la zone séparée desservie par l’approvisionnement en eau et l’égout OOD — Vratsa
Property / summary
 
— Selon la composante d’approvisionnement en eau, il est prévu: •pour la ville de Vratsa: reconstruction d’une conduite d’alimentation en eau de 13 000 m³ à 6 200 m³ de HP d’une longueur de 0,785 km;•pour Vratsa: reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 23,025 km, construction de deux nouveaux puits PRV, ainsi que d’un nouveau puits de compteur d’eau; •pour Mezdra: reconstruction et achèvement d’un réseau d’approvisionnement en eau de 8,272 km, ainsi que la construction de deux nouveaux puits PRV, ainsi que de huit nouveaux puits d’eau; •pour Kozloduy: Reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 12,218 km, construction d’un puits PRV, ainsi que de trois nouveaux puits d’eau; •pour Byala Slatina: Reconstruction et achèvement d’un réseau d’approvisionnement en eau de 10,478 km, ainsi que la construction de quatre nouveaux puits d’eau — Selon la composante Collecte des eaux usées: •agglomération Vratsa: achèvement d’un réseau d’assainissement d’une longueur de 3,946 km; • agglomération de Kozloduy: achèvement du réseau d’assainissement d’une longueur de 11,411 km; • agglomération de Byala Slatina: achèvement du réseau d’assainissement d’une longueur de 6,505 km, construction de nouvelles stations d’épuration des eaux usées dans la zone nord de la ville;•agglomération Mezdra: achèvement du réseau d’assainissement 0,878 km et reconstruction de 0,970 km de réseau d’assainissement Pour chaque agglomération, des tronçons de collecteurs principaux et des tronçons du réseau interne sont inclus dans les canalisations d’égouts dont l’achèvement est prévu. Les investissements comprennent également le raccordement des SCO existants et la construction de nouveaux SCO, le cas échéant, la construction d’installations de réseau d’assainissement. Pour chacune des 4 agglomérations, un système de suivi du réseau d’assainissement est prévu: •WWTP Vratsa: construction d’une canopée sur des champs de séchage pour le stockage temporaire des boues déshydratées; •Kozloduy WWTP: construction d’un site avec canopée pour le stockage temporaire des boues déshydratées. (French)
Property / summary: — Selon la composante d’approvisionnement en eau, il est prévu: •pour la ville de Vratsa: reconstruction d’une conduite d’alimentation en eau de 13 000 m³ à 6 200 m³ de HP d’une longueur de 0,785 km;•pour Vratsa: reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 23,025 km, construction de deux nouveaux puits PRV, ainsi que d’un nouveau puits de compteur d’eau; •pour Mezdra: reconstruction et achèvement d’un réseau d’approvisionnement en eau de 8,272 km, ainsi que la construction de deux nouveaux puits PRV, ainsi que de huit nouveaux puits d’eau; •pour Kozloduy: Reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 12,218 km, construction d’un puits PRV, ainsi que de trois nouveaux puits d’eau; •pour Byala Slatina: Reconstruction et achèvement d’un réseau d’approvisionnement en eau de 10,478 km, ainsi que la construction de quatre nouveaux puits d’eau — Selon la composante Collecte des eaux usées: •agglomération Vratsa: achèvement d’un réseau d’assainissement d’une longueur de 3,946 km; • agglomération de Kozloduy: achèvement du réseau d’assainissement d’une longueur de 11,411 km; • agglomération de Byala Slatina: achèvement du réseau d’assainissement d’une longueur de 6,505 km, construction de nouvelles stations d’épuration des eaux usées dans la zone nord de la ville;•agglomération Mezdra: achèvement du réseau d’assainissement 0,878 km et reconstruction de 0,970 km de réseau d’assainissement Pour chaque agglomération, des tronçons de collecteurs principaux et des tronçons du réseau interne sont inclus dans les canalisations d’égouts dont l’achèvement est prévu. Les investissements comprennent également le raccordement des SCO existants et la construction de nouveaux SCO, le cas échéant, la construction d’installations de réseau d’assainissement. Pour chacune des 4 agglomérations, un système de suivi du réseau d’assainissement est prévu: •WWTP Vratsa: construction d’une canopée sur des champs de séchage pour le stockage temporaire des boues déshydratées; •Kozloduy WWTP: construction d’un site avec canopée pour le stockage temporaire des boues déshydratées. (French) / rank
 
Normal rank
Property / summary: — Selon la composante d’approvisionnement en eau, il est prévu: •pour la ville de Vratsa: reconstruction d’une conduite d’alimentation en eau de 13 000 m³ à 6 200 m³ de HP d’une longueur de 0,785 km;•pour Vratsa: reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 23,025 km, construction de deux nouveaux puits PRV, ainsi que d’un nouveau puits de compteur d’eau; •pour Mezdra: reconstruction et achèvement d’un réseau d’approvisionnement en eau de 8,272 km, ainsi que la construction de deux nouveaux puits PRV, ainsi que de huit nouveaux puits d’eau; •pour Kozloduy: Reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 12,218 km, construction d’un puits PRV, ainsi que de trois nouveaux puits d’eau; •pour Byala Slatina: Reconstruction et achèvement d’un réseau d’approvisionnement en eau de 10,478 km, ainsi que la construction de quatre nouveaux puits d’eau — Selon la composante Collecte des eaux usées: •agglomération Vratsa: achèvement d’un réseau d’assainissement d’une longueur de 3,946 km; • agglomération de Kozloduy: achèvement du réseau d’assainissement d’une longueur de 11,411 km; • agglomération de Byala Slatina: achèvement du réseau d’assainissement d’une longueur de 6,505 km, construction de nouvelles stations d’épuration des eaux usées dans la zone nord de la ville;•agglomération Mezdra: achèvement du réseau d’assainissement 0,878 km et reconstruction de 0,970 km de réseau d’assainissement Pour chaque agglomération, des tronçons de collecteurs principaux et des tronçons du réseau interne sont inclus dans les canalisations d’égouts dont l’achèvement est prévu. Les investissements comprennent également le raccordement des SCO existants et la construction de nouveaux SCO, le cas échéant, la construction d’installations de réseau d’assainissement. Pour chacune des 4 agglomérations, un système de suivi du réseau d’assainissement est prévu: •WWTP Vratsa: construction d’une canopée sur des champs de séchage pour le stockage temporaire des boues déshydratées; •Kozloduy WWTP: construction d’un site avec canopée pour le stockage temporaire des boues déshydratées. (French) / qualifier
 
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:10, 3 December 2021

Project Q3848883 in Bulgaria
Language Label Description Also known as
English
Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage OOD — Vratsa
Project Q3848883 in Bulgaria

    Statements

    0 references
    30,895,256.55 Bulgarian lev
    0 references
    15,756,580.84 Euro
    1 December 2021
    0 references
    41,682,753.04 Bulgarian lev
    0 references
    21,258,204.05 Euro
    1 December 2021
    0 references
    0.74 percent
    0 references
    18 July 2019
    0 references
    18 January 2024
    0 references
    0 references
    0 references

    43°23'55.75"N, 23°42'56.59"E
    0 references
    - По компонент Водоснабдяване се предвижда :•за гр. Враца: реконструкция на Довеждащ водопровод от НР 13 000 m3 до НР 6 200 m3 с дължина 0,785 km;•за гр. Враца: реконструкция и доизграждане на водопроводна мрежа с дължина 23,025 km , изграждане на две нови PRV шахти , както и една нова водомерна шахта;•за гр. Мездра: реконструкция и доизграждането на водопроводна мрежа с дължина 8,272 km , както и изграждането на две нови PRV шахти, както и осем нови водомерни шахти;•за гр. Козлодуй: Реконструкция и доизграждане на водопроводна мрежа с дължина 12,218 km , изграждането на една PRV шахта , както и три нови водомерни шахти;•за гр. Бяла Слатина: Реконструкция и доизграждане на водопроводна мрежа с дължина 10,478 km, както и изграждането на четири нови водомерни шахти- По компонент Събиране на отпадъчни води се предвижда: •агломерация Враца: доизграждане на канализационна мрежа с дължина 3,946 km;•агломерация Козлодуй: доизграждане на канализационната мрежа с дължина 11, 411 km ;•агломерация Бяла Слатина: доизграждане на канализационната мрежа с дължина 6,505 km, изграждане на нови канализационни клонове за битови води в северната зона на града;•Агломерация Мездра: доизграждане на канализационна мрежа мрежа 0,878 km и реконструкция на 0,970 km канализационна мрежа За всяка агломерация в предвидените за доизграждане канализационни клонове са включени участъци от главни колектори и участъци от вътрешната мрежа. В инвестициите е включено и привързване на съществуващи СКО и изграждане на нови СКО, там където е необходимо, изграждане на съоръжения от канализационната мрежа. За всяка от 4-те агломерации е предвидено изграждане на система за мониторинг на канализационната мрежа - По компонент Пречистване на отпадъчни води се предвижда: •ПСОВ Враца: изграждане на навес върху изсушителни полета за временно съхранение на обезводнена утайка; •ПСОВ Козлодуй: изграждане на площадка с навес за времeнно съхранение на обезводнената утайка. (Bulgarian)
    0 references
    — According to the water supply component, it is foreseen: •for the town of Vratsa: reconstruction of a water supply pipeline from HP 13 000 m³ to HP 6 200 m³ with a length of 0.785 km;•for Vratsa: reconstruction and completion of a water supply network with a length of 23.025 km, construction of two new PRV shafts, as well as one new water meter shaft; •for Mezdra: reconstruction and completion of a 8.272 km water supply network, as well as the construction of two new PRV shafts, as well as eight new water shafts; •for Kozloduy: Reconstruction and completion of a water supply network with a length of 12.218 km, construction of one PRV shaft, as well as three new water shafts; •for Byala Slatina: Reconstruction and completion of a 10.478 km water supply network, as well as the construction of four new water shafts — According to the component Wastewater collection is foreseen: •agglomeration Vratsa: completion of a sewerage network with a length of 3.946 km; • agglomeration of Kozloduy: completion of the sewerage network with a length of 11.411 km; • agglomeration of Byala Slatina: completion of the sewerage network with a length of 6.505 km, construction of new sewage branches for domestic water in the northern area of the city;•Agglomeration Mezdra: completion of the sewerage network 0.878 km and reconstruction of 0.970 km of sewerage network For each agglomeration, sections of main collectors and sections of the internal network are included in the sewer branches planned for completion. Investments also include connecting existing OCSs and building new OCS, where necessary, construction of sewerage network facilities. For each of the 4 agglomerations, a system for monitoring the sewerage network is planned: •WWTP Vratsa: construction of a canopy on drying fields for temporary storage of dehydrated sludge; •Kozloduy WWTP: construction of a site with canopy for temporary storage of dehydrated sludge. (English)
    2 December 2021
    0 references
    — Selon la composante d’approvisionnement en eau, il est prévu: •pour la ville de Vratsa: reconstruction d’une conduite d’alimentation en eau de 13 000 m³ à 6 200 m³ de HP d’une longueur de 0,785 km;•pour Vratsa: reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 23,025 km, construction de deux nouveaux puits PRV, ainsi que d’un nouveau puits de compteur d’eau; •pour Mezdra: reconstruction et achèvement d’un réseau d’approvisionnement en eau de 8,272 km, ainsi que la construction de deux nouveaux puits PRV, ainsi que de huit nouveaux puits d’eau; •pour Kozloduy: Reconstruction et achèvement d’un réseau d’alimentation en eau d’une longueur de 12,218 km, construction d’un puits PRV, ainsi que de trois nouveaux puits d’eau; •pour Byala Slatina: Reconstruction et achèvement d’un réseau d’approvisionnement en eau de 10,478 km, ainsi que la construction de quatre nouveaux puits d’eau — Selon la composante Collecte des eaux usées: •agglomération Vratsa: achèvement d’un réseau d’assainissement d’une longueur de 3,946 km; • agglomération de Kozloduy: achèvement du réseau d’assainissement d’une longueur de 11,411 km; • agglomération de Byala Slatina: achèvement du réseau d’assainissement d’une longueur de 6,505 km, construction de nouvelles stations d’épuration des eaux usées dans la zone nord de la ville;•agglomération Mezdra: achèvement du réseau d’assainissement 0,878 km et reconstruction de 0,970 km de réseau d’assainissement Pour chaque agglomération, des tronçons de collecteurs principaux et des tronçons du réseau interne sont inclus dans les canalisations d’égouts dont l’achèvement est prévu. Les investissements comprennent également le raccordement des SCO existants et la construction de nouveaux SCO, le cas échéant, la construction d’installations de réseau d’assainissement. Pour chacune des 4 agglomérations, un système de suivi du réseau d’assainissement est prévu: •WWTP Vratsa: construction d’une canopée sur des champs de séchage pour le stockage temporaire des boues déshydratées; •Kozloduy WWTP: construction d’un site avec canopée pour le stockage temporaire des boues déshydratées. (French)
    3 December 2021
    0 references
    Враца
    0 references

    Identifiers

    BG16M1OP002-1.016-0002
    0 references